← All spills

Central STW Shaft 16 pumping station, Plymou

SBB00945
Overflow on the network feeding Plymouth Central STW · Pumping-station / emergency overflow
Designated bathing water · Plymouth Hoe East
Showing history for 2022 · records go back to 2020
Spilling now — 6h 9m

This overflow is discharging now. Avoid the water downstream.

Spill started
28 Nov, 07:05
Counted spills, 2022
0
0 discharge events
Hours spilled, 2022
0
Is the feed working?
Working
Last checked 14 min ago · we poll SWW hourly
48h agonow
47/48 hourly readings received
Dry spills, 2022
0
None in 2022 · 12 since 2020
How a dry spill is decided →
Spilled before its STW, 2022
0
0 in 2022 · 921 since 2020
What this means →
Why this one spills

This overflow spills far more than most.

On the analysis this is one of the catchment's heavier or longer-running overflows. Its treatment works is not recorded as over capacity, so the volume is worth explaining. See the record below, and how the verdict is reached.

How this verdict is reached →

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Crossed — over 10 spills/year

Is anyone acting on this?

Flagged problems
High spill frequency921 discharge events since 2020Dry spilling12 dry spills since 2020
Measures on record

Nothing on record.

Verdict
No action recorded

A flagged problem with no active measure against it. That is a gap in the public record.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Central STW Shaft 16 pumping station, Plymou's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

Serious pollution incidents recorded here

All incidents on the Lower Tamar & Inny →
  1. 20 Nov 2019Crude sewage · about 40 m from Central STW Shaft 16 pumping station, Plymou11:01 · Significant impact on water · EA ref 1756130 · Ask for the full report ↗Significant
  2. 26 Aug 2010Other sewage · at Central STW Shaft 16 pumping station, Plymou09:29 · Major impact on water · EA ref 816667 · Ask for the full report ↗Major

Environment Agency pollution incident records (category 1 and 2, closed incidents), via the open dataset. © Environment Agency copyright and/or database right. All rights reserved. The EA records where an incident happened, not who caused it: “near” an overflow is not a finding that it was responsible. Recent incidents appear only once the EA closes them; minor (category 3) incidents aren’t published. The open data gives only the date, place, severity and pollutant: the cause, the watercourse, any sampling and any enforcement are in the EA’s incident report, which anyone can ask for by its reference. Checked 28 Nov 2026.

Put this on the national record

This is the fastest way to act on what you have seen. Our petition asks the Government to publish a fix-by date and yearly progress for every storm overflow. At 100,000 signatures it must be considered for debate in Parliament.

352of 10,000 for a Government response
Sign the petition ↗

The record since 2020

12 dry spills and 921 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2022: 0 spills · 0 discharge events

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

No spills over 15 minutes in 2022

Nothing over 15 minutes was recorded at this overflow in 2022. Discharges shorter than 15 minutes are excluded everywhere on this site — a brief operational blip is not counted as a spill. How we know.