Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

24
Measures in this catchment
WINEP, current record
24
Still active
not yet past their date
0
Assumed complete
completion date has passed
7
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SW104992 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Altarnun STW
Due 2026-27Penpont Water
08SW104991 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Altarnun STW
Due 2026-27Penpont Water
08SW104977 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BEALS MILL STW
Due 2026-27Lower river inny
08SW104976 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
BEALS MILL STW
Due 2026-27Lower river inny
08SW104815 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
GUNNISLAKE STW
Due 2026-27Lower River Tamar
08SW104816 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
GUNNISLAKE STW
Due 2026-27Lower River Tamar
08SW104808 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
HARROWBARROW STW
Due 2026-27Cotehele Stream
08SW104807 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
HARROWBARROW STW
Due 2026-27Cotehele Stream
08SW104754 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Lewannick STW
Due 2026-27Penpont Water
08SW104753 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Lewannick STW
Due 2026-27Penpont Water
08SW104726 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
METHERELL STW
Due 2026-27Cotehele Stream
08SW104727 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
METHERELL STW
Due 2026-27Cotehele Stream
08SW104720 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
MILTON ABBOT STW
Due 2026-27Lower River Tamar
08SW104721 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MILTON ABBOT STW
Due 2026-27Lower River Tamar
08SW104589 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
STOKE CLIMSLAND STW
Due 2026-27Lower River Tamar
08SW104590 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
STOKE CLIMSLAND STW
Due 2026-27Lower River Tamar
08SW104999 · dsEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
SALTASH ROAD SPS_PSCSOEO_PLYMOUTH
Due 2027-28SALTASH ROAD SPS_PSCSOEO_PLYMOUTH
08SW101417 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
BARBICAN TANKS_CSOEO_PLYMOUTH
Due 2029-30BARBICAN TANKS_CSOEO_PLYMOUTH
08SW101438 · aEnvAct_IMP3Improvement
Reduction of spills to meet EnvAct_IMP drivers
CAMBRIDGE LANE_CSO_PLYMOUTH
Due 2029-30CAMBRIDGE LANE_CSO_PLYMOUTH
08SW102925 · aEE_IMPImprovement
Eel screening requirement (Abstraction)
Eel Abstraction - Gunnislake
Due 2029-30Lower River Tamar
08SW101544 · aEnvAct_IMP3Improvement
Reduction of spills to meet EnvAct_IMP drivers
MARKET STREET SPS_PSCSOEO_KINGSAND
Due 2029-30MARKET STREET SPS_PSCSOEO_KINGSAND
08SW101543 · aEnvAct_IMP3Improvement
Reduction of spills to meet EnvAct_IMP drivers
MARKET STREET SPS_PSCSOEO_KINGSAND
Due 2029-30MARKET STREET SPS_PSCSOEO_KINGSAND
08SW104299 · aEnvAct_IMP3Improvement
Reduction of spills to meet EnvAct_IMP drivers
OCEAN COURT SPS_PSCSOEO_PLYMOUTH
Due 2029-30OCEAN COURT SPS_PSCSOEO_PLYMOUTH
08SW101635 · aEnvAct_IMP3Improvement
Reduction of spills to meet EnvAct_IMP drivers
THE SQUARE CAWSAND_PSCSOEO_CAWSAND
Due 2029-30THE SQUARE CAWSAND_PSCSOEO_CAWSAND

24 of 24 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.