Why it keeps happening

Treatment works capacity

Every overflow goes to a sewage treatment works that serves a fixed area. There is no public data available to understand if the works has sufficient capacity to treat the sewage for the local population. We estimate this capacity based on the required capacity in the EA permit compared to the local population estimated to be on the sewage system. As we receive data on the actual processing capacity from Dŵr Cymru Welsh Water we will add that too.

Capacity across the Cleddau and Milford Haven

Not yet known whether the Cleddau and Milford Haven’s 30 treatment works are big enough

They serve about 56,644 people. Judging capacity needs each works’ permitted flow, and River Hub hasn’t loaded those permits for the Cleddau and Milford Haven. That is a gap in what River Hub holds, not a finding about the works.

Works
Load against permit
Overflow at works
Spare capacity
Letterston West
528 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
St. Ishmaels
456 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Walton West
1,087 people · permit not found
Not known
Not assessed
0 h
2 upstream · 2 pre-STW
Not known
Castlemorris
417 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Cosheston
828 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Stackpole
556 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Templeton
1,066 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Lamphey
895 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Burton Ferry
population unknown · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Hundleton
858 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Maenclochog
422 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Marloes
329 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Spittal
479 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Freshwater East
895 people · permit not found
Not known
Not assessed
5 h
0 upstream
Not known
Haverford West STW
15,470 people · permit not found
Not known
Not assessed
0 h
7 upstream · 1 pre-STW
Not known
Camrose
1,849 people · permit not found
Not known
Not assessed
0 h
1 upstream
Not known
Tenby And Saundersfoot STW
5,341 people · permit not found
Not known
Not assessed
0 h
15 upstream · 7 pre-STW
Not known
Waterston
824 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Hook
819 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Mathry
528 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Keeston
1,849 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Clarbeston Road No 1
1,148 people · permit not found
Not known
Not assessed
0 h
1 upstream · 1 pre-STW
Not known
Milford Haven STW
11,890 people · permit not found
Not known
Not assessed
0 h
7 upstream · 2 pre-STW
Not known
Red Roses
425 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Llangwm
2,051 people · permit not found
Not known
Not assessed
0 h
2 upstream · 1 pre-STW
Not known
Wolfscastle
1,106 people · permit not found
Not known
Not assessed
0 h
2 upstream
Not known
Herbrandston
420 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Tiers Cross
563 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Johnston
2,211 people · permit not found
Not known
Not assessed
0 h
0 upstream
Not known
Clynderwen
1,334 people · permit not found
Not known
Not assessed
0 h
1 upstream · 1 pre-STW
Not known

The black line marks 100% of permitted dry-weather flow; a dashed empty bar means no permit was found to measure against. Load is an estimate — population served × per-head water use, plus infiltration — not a permit-compliance finding. A works over 100% here is a signal to investigate, not a proven breach. Overflow hours are the works' own storm overflow in the last full year.

30 works with no permit loaded

River Hub doesn’t yet hold the permits for Letterston West, St. Ishmaels, Walton West, Castlemorris, Cosheston, Stackpole and 24 more, so it can’t check whether they are big enough for the people they serve. That’s a gap, not a clean bill of health, and it’s the quickest thing on this page to fix: discharge permits are public, and Natural Resources Wales must supply them on request. No request for them has been published on River Hub yet.

  1. Look a works up on the NRW’s public register of discharge permits.
  2. Ask Natural Resources Wales for them through WhatDoTheyKnow: the request is written for you, and it and the reply are published there.
  3. Got a permit already? Send it to us and the works will be assessed.

Why this matters for reading spills

Works over capacity

If a works cannot treat the flow it receives, it spills to protect itself. The remedy is capital investment or a lower permitted load — years and millions, but it is the water company's to fix.

Headroom, but still spills

A works with spare capacity whose network still spills points to another problem — often something on that branch, like a blockage, a failed pump, or groundwater getting into the sewer. Frequently cheap to fix, and fixable now.

No permit found

Where we cannot find the permitted flow, the works cannot be assessed at all. That is a gap in the public record, and closing it is the first step to holding capacity to account.

How growth becomes spills

A developer has a section 106 right to connect to the public sewer, and the water company has a section 94 duty to accept the flow — but capacity is only funded on a five-yearly capital cycle. New connections can therefore arrive years before the works is enlarged to take them, and the overflow absorbs the gap. Schedule 3 to the Flood and Water Management Act 2010, which would make sustainable drainage mandatory and give a SuDS Approving Body a say, has been in force in Wales since 2018 but remains uncommenced in England — so here there is no such body.

What the permit actually sets

The permitted dry-weather flow is set by Formula A — roughly DWF + 1,360 × population + 2 × trade effluent (litres/day). The permit also sets a flow to full treatment, typically about three times DWF, below which everything must be treated rather than spilled. Our load figure compares estimated demand against that permitted DWF. 30 works here have no permitted flow loaded in River Hub yet, so their load can’t be calculated: they show as not assessed, never 0%.