Before the works
An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.
If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.
When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.
| Overflow | Events | Its works | On record |
|---|---|---|---|
| Letterston East Storm Overflow | 1 | Letterston West | Measure linked |
| Clarbeston Road Storm Overflow | 1 | Clarbeston Road No 1 | Measure linked |
| Clynderwen Iron Duke Storm Overflow | 1 | Clynderwen | Measure linked |
| Fleet Street No 2 Pennar Storm Overflow | 1 | Pembroke STW | Measure linked |
| Portfield Storm Overflow | 1 | Haverford West STW | Measure linked |
| The Promenade Neyland Storm Overflow | 1 | Neyland Wwtw Neyland Pembrokeshire STW | Measure linked |
| Mill Bridge Pembroke Storm Overflow | 1 | Pembroke STW | Measure linked |
| Neyland Ps Storm Overflow | 1 | Neyland Wwtw Neyland Pembrokeshire STW | Measure linked |
| Fleet Street No 1 Pennar Storm Overflow | 1 | Pembroke STW | Measure linked |
| Broad Haven South Storm Overflow | 1 | Walton West | Measure linked |
| New Hedges Overflow | 1 | Tenby And Saundersfoot STW | Measure linked |
| Pembroke Dock Sycamore Street Storm Overflow | 1 | Pembroke STW | Measure linked |
| Little Haven Overflow | 1 | Walton West | Measure linked |
| Penally Storm Overflow | 1 | Tenby And Saundersfoot STW | Measure linked |
| Milford Haven Lower Priory Storm Overflow | 1 | Milford Haven STW | Measure linked |
| Lamack Vale Tenby Overflow | 1 | Tenby And Saundersfoot STW | Measure linked |
| Honeyborough No 1 Storm Overflow | 1 | Neyland Wwtw Neyland Pembrokeshire STW | Measure linked |
| Houghton Storm Overflow | 1 | Llangwm | Measure linked |
| Saundersfoot East Storm Overflow | 1 | Tenby And Saundersfoot STW | Measure linked |
| Amroth Car Park Storm Overflow | 1 | Amroth | Measure linked |
| Lydstep Storm Overflow | 1 | Tenby And Saundersfoot STW | Measure linked |
| Western Way Pembroke Dock Storm Overflow | 1 | Pembroke STW | Measure linked |
| Coombs Drive Storm Overflow | 1 | Milford Haven STW | Measure linked |
| St Nicholas Crescent Storm Overflow | 1 | Pembroke STW | No measure |
| Scleddau Storm Overflow | 1 | Fishguard | Measure linked |
| Amroth Beach Storm Overflow | 1 | Amroth | Measure linked |
| Milton Overflow | 1 | Carew | Measure linked |
| Saundersfoot Car Park Overflow | 1 | Tenby And Saundersfoot STW | No measure |
| Tenby Lifeboat Slip Storm Overflow | 1 | Tenby And Saundersfoot STW | Measure linked |
What this needs to be reliable
The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.