Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

184
Measures in this catchment
NEP, current record
146
Still active
not yet past their date
38
Assumed complete
completion date has passed
22
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100116a · 8dba1db0W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
AMROTH SEWAGE TREATMENT WORKS
Complete 2025-26Amroth Beach Storm Overflow
DCWW100117a · da985ea9W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
ANGLE
Complete 2025-26Angle WwTW Storm Overflow
DCWW100147a · f88631edW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BURTON FERRY WWTW NEYLAND PEMBS
Complete 2025-26Burton Ferry WwTW Storm Overflow
DCWW100149a · 71359e6aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CAMROSE STW
Complete 2025-26Camrose WwTW Overflow
DCWW100156a · f0433b06W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CAREW/MILTON WWTWS PEMBROKESHIRE
Complete 2025-26Carew WwTW Storm Overflow
DCWW100159a · 93719403W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CEMAES PS/BALANCING TANK CEMAES BAY
Complete 2025-26Clynderwen Final Effulent Storm Overflow
DCWW100165a · 200dcae4W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CLARBESTON ROAD NO 1
Complete 2025-26Clarbeston Road WwTW Storm Overflow
DCWW100166a · 85fcc389W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CLYNDERWEN STW
Complete 2025-26Clynderwen Final Effulent Storm Overflow
DCWW100170a · 3a4ca504W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
COSHESTON STW
Complete 2025-26Cosheston WwTW Storm Overflow
DCWW100192a · d1909f4dW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
DALE WWTW DALE MILFORD HAVEN PEMBS
Complete 2025-26Dale WwTW Storm Overflow
DCWW100228a · e934eed4W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
HERBRANDSTON WWTW HERBRANDSTON
Complete 2025-26Herbrandston WwTW Storm Overflow
DCWW100232a · 4f233b93W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
HOOK STW
Complete 2025-26Hook WwTW Low Level Storm Overflow
DCWW100234a · 5e4ebc6eW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
HUNDLETON WWTW INLET STORM OVERFLOW
Complete 2025-26Hundleton WwTW Storm Overflow
DCWW100080a · 9bedbf01W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
KEESTON WORKS INLET . .
Complete 2025-26Keeston WwTW Storm Overflow
DCWW100236a · 737c8fc0W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LAMPHEY WWTW LAMPHEY NEAR PEMBROKE
Complete 2025-26Lamphey WwTW Storm Overflow
DCWW100237a · 0f582accW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LANGDON WWTW BEGELLY PEMBROKESHIRE
Complete 2025-26Langdon WwTW Storm Overflow
DCWW100240a · 45342dd5W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LETTERSTON WEST STW
Complete 2025-26Letterston West WwTW Storm Overflow
DCWW100271a · ce0ea69dW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANGENNECH WASTE WATER TREATMENT
Complete 2025-26Maenclochog WwTW Storm Overflow
DCWW100277a · e963e8daW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANGWM STW
Complete 2025-26Llangwm WwTW Storm Overflow
DCWW100303a · 02012e8aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
MAENCLOCHOG STW CLYNDERWEN
Complete 2025-26Maenclochog WwTW Storm Overflow
DCWW100306a · 017a4c21W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
MARLOES STW
Complete 2025-26Water body only
DCWW100089a · e561e5b5W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
MATHRY STW NR FISHGUARD PEMBROKESHIRE
Complete 2025-26Mathry WwTW Storm Overflow
DCWW100308a · e47f69a2W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
MERLINS BRIDGE STW
Complete 2025-26Merlins Bridge WwTW Storm Overflow
DCWW100309a · 8119eb67W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
MILFORD HAVEN STW
Complete 2025-26Milford Haven Pier Storm Overflow
DCWW100315a · a591d07eW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
NARBERTH WEST STW
Complete 2025-26Narberth West WwTW Storm Overflow
DCWW100320a · e2ba4f57W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
NEYLAND WWTW NEYLAND PEMBROKESHIRE
Complete 2025-26The Promenade Neyland Storm Overflow
DCWW100327a · c6362ec0W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PEMBROKE DOCK WASTEWATER TREATMENT
Complete 2025-26Water Street Pembroke Dock Storm Overflow
DCWW100339a · 910cc145W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PICTON PLACE SPS
Complete 2025-26Picton Place Storm Overflow
DCWW100366a · 80ee90b6W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
ROSEMARKET STW MILFORD HAVEN
Complete 2025-26Rosemarket WwTW Storm Overflow
DCWW100369a · 76e4a046W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
SAUNDERSFOOT WORKS SPS
Complete 2025-26Saundersfoot Valley Road Storm Overflow
DCWW100097a · 537304a1W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
SPITTAL WWTW SPITTAL PEMBS
Complete 2025-26Spittal WwTW Storm Overflow
DCWW100373a · beed986eW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
ST. ISHMAELS STW
Complete 2025-26St Ishmaels WwTW Storm Overflow
DCWW100378a · bd359cf6W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TALSARNAU STW
Complete 2025-26Tiers Cross WwTW Storm Overflow
DCWW100381a · 66fc2b41W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TAVERNSPITE
Complete 2025-26Tiers Cross WwTW Storm Overflow
DCWW100382a · 1c4e0c77W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TEMPLETON STW
Complete 2025-26Templeton WwTW Storm Overflow
DCWW100383a · e041040bW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TIERS CROSS WWTW
Complete 2025-26Tiers Cross WwTW Storm Overflow
DCWW100405a · a8e3823dW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
WALTON WEST STW
Complete 2025-26Walton West WwTW Storm Overflow
DCWW100411a · 555e9901W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
WOLFSCASTLE STW
Complete 2025-26Wolfcastle WwTW Storm Overflow
DCWW102121a · 0a70ae1fW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
AMROTH & SUMMERHILL SCHEME PS NO 2
Due 2026-27Amroth Beach Storm Overflow
DCWW100144a · 6610b9afW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BRYNSIENCYN (ANGLESEY)
Due 2026-27Clynderwen Final Effulent Storm Overflow
DCWW102124a · 03b18108W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAREW STW INLET TO WORKS
Due 2026-27Carew WwTW Storm Overflow
DCWW102195a · 74ac35cfW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Haverfordwest No 7 -Union Hill
Due 2026-27Union Hill Storm Overflow
DCWW102212a · 026fc48dW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Haverfordwest No9 -Quay Street
Due 2026-27Quay Street Haverfordwest Storm Overflow
DCWW102211a · 899752dfW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HAVERFORDWEST SOC 8 & PS
Due 2026-27Picton Place Storm Overflow
DCWW102214a · 961be332W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llangwm STW CSO
Due 2026-27Llangwm WwTW Storm Overflow
DCWW102215a · 62c36f1fW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Milton SPS CSO
Due 2026-27Milton Overflow
DCWW102647a · 2870c9aeW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Neyland - Neyland Yacht Club
Due 2026-27Picton Road Neyland Storm Overflow
DCWW102205a · 268719f0W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Neyland - The Promenade
Due 2026-27The Promenade Neyland Storm Overflow
DCWW102203a · 92449658W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEYLAND PS
Due 2026-27Neyland PS Storm Overflow
DCWW102207a · 19613433W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PEMBROKE DOCK TO THE MILFORD HAVEN
Due 2026-27Western Way Pembroke Dock Storm Overflow
DCWW102644a · 3caa10d4W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PEMBROKE RIVER PS EOF
Due 2026-27Pembroke Storm Overflow
DCWW102646a · f0fcffbfW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PENALLY (NR TENBY) PS
Due 2026-27Penally Storm Overflow
DCWW102201a · e11face3W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Pennar Fleet Street MH No 2103
Due 2026-27Fleet Street No 1 Pennar Storm Overflow
DCWW102202a · 486a1c8fW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Pennar Fleet Street MH No 4101
Due 2026-27Fleet Street No 2 Pennar Storm Overflow
DCWW101586a · a40d892cW_WFD_PG_IMP1Improvement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PG_IMP and associated PR19 driver paper
WQ
Castlemartin (7CDC1093)
Due 2027-28Water body only
DCWW101005a · fccc9928W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
(B)MEYRICK ST SWO PEMBROKE DOCK
Due 2029-30Western Way Pembroke Dock Storm Overflow
DCWW101582a · a8786d69W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
(B)MEYRICK ST SWO PEMBROKE DOCK
Due 2029-30Western Way Pembroke Dock Storm Overflow
DCWW101770a · 003a8321W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
AMBLESTON STW
Due 2029-30Water body only
DCWW100958a · e0aea5a9W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
AMROTH AND SUMMERHILL NO2 (BEACH SPS)
Due 2029-30Amroth Beach Storm Overflow
DCWW100957a · af0732dbW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
AMROTH AND SUMMERHILL SPS NO1 (Car Park)
Due 2029-30Amroth Car Park Storm Overflow
DCWW101636a · 354c101dW_WFD_Minor_IMPImprovement
Implementation of actions to address Waste Water treatment Works WwTW impacts causing, and/or modelled as showing a predicted failure at either or both waterbody and site level on small rivers, tributaries or headwaters BOD, NH3 and/or P reduction under No deterioration (Biological Oxygen Demand, Ammonia and Phosphorus)
WQ
Amroth STW New Inn Stream
Due 2029-30Water body only
DCWW101582a · 45dc559eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ANGLE VILLAGE PS
Due 2029-30Angle WwTW Storm Overflow
DCWW101582a · d371375bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Angle WWTW Pembroke Pembrokeshire Setteld Storm
Due 2029-30Angle WwTW Storm Overflow
DCWW102385a · b90097d5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Begelly New Road CSO
Due 2029-30New Road Begelly Storm Overflow
DCWW102748a · e8cfe83dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Broad Haven South
Due 2029-30Broad Haven South Storm Overflow
DCWW100978a · f3097ac2W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Broadhaven North SPS Emergency Overflow, Walton West
Due 2029-30Walton West WwTW Overflow
DCWW101060a · 0ffb219eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BROADHAVEN SOUTH PUMPING STATION, BROADHAVEN
Due 2029-30Broad Haven South Storm Overflow
DCWW101087a · 5d37d079W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Broadmoor SPS, Broadmoor
Due 2029-30Broadmoor Storm Overflow
DCWW100981a · 74a475a0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BROOKLANDS PLACE PUMPING STATION NO. 3 SAUNDERSFOOT, DYFED
Due 2029-30Saundersfoot West Storm Overflow
DCWW101582a · 006228e1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BROOKLANDS PLACE SPS
Due 2029-30Saundersfoot West Storm Overflow
DCWW102583a · 86332a21W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BURTON FERRY (NR NEYLAND) STW
Due 2029-30Burton Ferry WwTW Storm Overflow
DCWW101066a · 8daa46e9W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BURTON FERRY WASTEWATER TREATMENT WORKS
Due 2029-30Burton Ferry WwTW Storm Overflow
DCWW100683a · 724a4a0bW_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
CAREW
Due 2029-30Carew WwTW Storm Overflow
DCWW100645a · 8cb7e164W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
CAREW
Due 2029-30Carew WwTW Storm Overflow
DCWW101582a · 7943fb6fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Castlemorris Wastewater Treatment CSO
Due 2029-30Castle Morris WwTW Storm Overflow
DCWW101949a · e92360afW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Clarbeston Road
Due 2029-30Clarbeston Road Storm Overflow
DCWW101948a · b175b5adW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Clarbeston Road No 1
Due 2029-30Clarbeston Road WwTW Storm Overflow
DCWW101582a · 79d627f0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Clarbeston Road PS
Due 2029-30Clarbeston Road Storm Overflow
DCWW100885a · 50f42c31W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Clarbeston Road Pumping Station No 2, Lamborough Crescent, Clarbeston Road, Dyfed
Due 2029-30Clarbeston Road Storm Overflow
DCWW101582a · 472bbe4eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Clarbeston Road Wastewater Treatment Works Storm Overflow
Due 2029-30Clarbeston Road WwTW Storm Overflow
DCWW102115a · b61602d0W_HR_AMM_T_IMP1Improvement
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
CLARBESTON STW
Due 2029-30Water body only
DCWW101582a · aa46095fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Combined Sewer Overflow at Beach Hill, Milford Haven, Pembrokeshire,
Due 2029-30Beach Hill Storm Overflow
DCWW101582a · b6b92eb5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Combined Sewer Overflow No. 6
Due 2029-30Perrots Road Island Storm Overflow
DCWW100971a · 0466660fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CROWHILL HAVERFORDWEST
Due 2029-30Water body only
DCWW101582a · c6e83bfcW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Crundale Sewage Pumping Station
Due 2029-30Crundale Storm Overflow
DCWW101076a · 22781a97W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Crundale SPS, Stephen's Ford Bridge, Crundale, Haverfordwest
Due 2029-30Crundale Storm Overflow
DCWW100861a · 5b56e202W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CSO & EO at Johnston Terminal SPS
Due 2029-30Johnston WwTW Storm Overflow
DCWW101582a · a8d218d0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO and EO at Amroth & Summerhill SPS No.1
Due 2029-30Amroth Car Park Storm Overflow
DCWW101582a · ea4245e0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO and EO at Steynton SPS
Due 2029-30Steynton Road Storm Overflow
DCWW101582a · 03f9d01cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Holyland Rd Pembroke MH 1301
Due 2029-30Holyland Road Pembroke Storm Overflow
DCWW102551a · 5d55df05W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO serving Wolfsdale SPS Wolfsdale SO
Due 2029-30Wolfsdale Storm Overflow
DCWW101582a · 98d8f931W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO WOODBINE CLOSE PEMBROKE
Due 2029-30Woodbine Terrace Pembroke Storm Overflow
DCWW101582a · c5aeba79W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
DALE WWTW - CSO
Due 2029-30Dale WwTW Storm Overflow
DCWW100961a · e9af5d38W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Freshwater Outfall SPS, Freshwater East
Due 2029-30Freshwater East WwTW Overflow
DCWW101582a · d29fe9c2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Gaddarn Reach SPS CSO
Due 2029-30Gaddarn Reach Neyland Storm Overflow
DCWW102754a · 182581beW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Haverfordwest Hawthorn Rise
Due 2029-30Kensington Gardens Haverfordwest Storm Overflow
DCWW101955a · 18a8e327W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Haverfordwest No 1- Fred Rees
Due 2029-30Perrots Road Island Storm Overflow
DCWW101967a · 7a470ed3W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Haverfordwest No 6 Fenton
Due 2029-30Portfield Storm Overflow
DCWW101067a · 6dbae57eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HEAD OF BEACH, LITTLE HAVEN, PEMBROKESHIRE
Due 2029-30Little Haven Overflow
DCWW102716a · bf5ccd96W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HERBRANDSTON STW
Due 2029-30Herbrandston WwTW Storm Overflow
DCWW101582a · 37ce7e62W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Honeyborough SPS CSO
Due 2029-30Honeyborough No 1 Storm Overflow
DCWW101582a · 651b46ebW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Hook STW Inlet PS low level CSO
Due 2029-30Hook WwTW Low Level Storm Overflow
DCWW102717a · 73d13553W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HOOK STW Storm Overflow
Due 2029-30Hook WwTW Low Level Storm Overflow
DCWW101582a · 49babf0eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Houghton SPS CSO
Due 2029-30Houghton Storm Overflow
DCWW102585a · 42fcabbdW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Hundleton STW Inlet CSO
Due 2029-30Hundleton WwTW Storm Overflow
DCWW100979a · cf653c8eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Iron Duke SPS, Station Terrace, Clunderwen, Pembrokeshire
Due 2029-30Clynderwen Iron Duke Storm Overflow
DCWW101582a · 6a7e6eb2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Johnston Terminal SPS
Due 2029-30Johnston WwTW Storm Overflow
DCWW101099a · ecf95541W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
KILGETTY EAST SPS
Due 2029-30Kilgetty Storm Overflow
DCWW102409a · 5f4b52c2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
KILGETTY EAST SPS SCREENED STORM
Due 2029-30Kilgetty Storm Overflow
DCWW101059a · 47050d5aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LAMACK VALE SPS, TENBY
Due 2029-30Lamack Vale Tenby Overflow
DCWW101582a · 884909edW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Lamphey WWTW Lamphey Near Pembroke Settled Storm
Due 2029-30Lamphey WwTW Storm Overflow
DCWW100890a · fe74b321W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LEACHPOOL PS
Due 2029-30Water body only
DCWW101582a · e3392a1cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Letterston East STW SPS
Due 2029-30Letterston East Storm Overflow
DCWW100696a · d957f0f8W_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
LLANDDEWI VELFREY (E NARBERTH)
Due 2029-30Llandewi Velfrey WwTW Storm Overflow
DCWW101582a · db0c6ef0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANDDEWI VELFREY STW NARBERTH PEMB
Due 2029-30Llandewi Velfrey WwTW Storm Overflow
DCWW102572a · ddf16270W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANGWM (M'FORD HAVEN) SPS CSO
Due 2029-30Llangwm Orchard Row Overflow
DCWW100938a · b5e6bd90W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANGWM SPS
Due 2029-30Llangwm Orchard Row Overflow
DCWW100493a · 162e3791W_FISHMIT_IMP1Improvement
Action to implement fisheries mitigation obligations in relevant catchments
WR
Llys Y Fran
Due 2029-30Water body only
DCWW100969a · 0c84bdf0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LOWER PENNAR, PEMBROKE DOCK
Due 2029-30Fleet Street No 2 Pennar Storm Overflow
DCWW102764a · 894c3482W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Lower Priory CSO
Due 2029-30Milford Haven Lower Priory Storm Overflow
DCWW101582a · 18492bbfW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LYDSTEP PS
Due 2029-30Lydstep Storm Overflow
DCWW101582a · dc9e83aeW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
M.Haven/Castle Pill CSO Pembs
Due 2029-30Coombs Drive Storm Overflow
DCWW101582a · a25bc267W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MANORBIER TRANSFER PS MANORBIER TE
Due 2029-30Manorbier Storm Overflow
DCWW101058a · 63be1b95W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MANORBIER, TENBY, PEMBROKESHIRE
Due 2029-30Manorbier Storm Overflow
DCWW101953a · 9a1b1480W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
MARLOES WORKS INLET
Due 2029-30Marloes WwTW Storm Overflow
DCWW101105a · 56f30e68W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MATHRY SPS
Due 2029-30Mathry WwTW Storm Overflow
DCWW101582a · 289960a0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MATHRY SPS NR FISHGUARD PEMBROKSHRE
Due 2029-30Mathry WwTW Storm Overflow
DCWW102372a · 5605550cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MERLINS BRIDGE
Due 2029-30Merlins Bridge WwTW Storm Overflow
DCWW100912a · 09a528daW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MERLINS BRIDGE INLET SEWAGE PUMPING STATION
Due 2029-30Merlins Bridge WwTW Storm Overflow
DCWW101582a · 355274abW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MILFORD HAVEN CSO
Due 2029-30Milford Haven Pier Storm Overflow
DCWW102371a · b6b6de6aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MILFORD HAVEN STW STORM
Due 2029-30Milford Haven WwTW Storm Overflow
DCWW100982a · 49ab374eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MILFORD STREET PUMPING STATION (NO. 1 & 1A) COMMON OVERFLOW
Due 2029-30Saundersfoot East Storm Overflow
DCWW101117a · d053e195W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MILTON SEWAGE PUMPING STATION
Due 2029-30Milton Overflow
DCWW101006a · 98282fe3W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MONKTON BRDGE PEMBROKE SWO
Due 2029-30Bridge Terrace Pembroke Storm Overflow
DCWW102388a · a9720cb9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NARBERTH EAST STW
Due 2029-30Bridge Hill Narberth Storm Overflow
DCWW100996a · 97d50ecaW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NARBERTH SPRINGFIELD PARK ESTATE PUMPING STATION
Due 2029-30Bridge Hill Narberth Storm Overflow
DCWW100644a · 77507f41W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
NARBERTH WEST
Due 2029-30Narberth West WwTW Storm Overflow
DCWW101582a · 46145002W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Nelson Quay SPS CSO
Due 2029-30Nelson Quay Storm Overflow
DCWW101030a · 0e269d5aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NEW HEDGES PUMPING STATION, ROWSTON HOLIDAY PARK, NEW HEDGES, TENBY, DYFED
Due 2029-30New Hedges Overflow
DCWW102587a · 7601d759W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEYLAND STW STORM
Due 2029-30Neyland PS Storm Overflow
DCWW101582a · 85256e87W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NORTHGATE/FRED REES CSO HVRFORDWEST
Due 2029-30Perrots Road Island Storm Overflow
DCWW101035a · 2cb5e15dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Pembroke Dock STW, Fort Road, Pembroke Dock, Dyfed
Due 2029-30Water Street Pembroke Dock Storm Overflow
DCWW102557a · c8b0dbb9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Pembroke Dock Sycamore Street
Due 2029-30Pembroke Dock Sycamore Street Storm Overflow
DCWW102576a · d2ae99b1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PEMBROKE DOCK WATER STREET MANHOLE 970
Due 2029-30Western Way Pembroke Dock Storm Overflow
DCWW101034a · 7c2d6ac2W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PEMBROKE RIVER PUMPING STATION, PEMBROKE, DYFED
Due 2029-30Pembroke Storm Overflow
DCWW101582a · 5fd25e6dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Pembroke Town - Monkton Bridge CSO
Due 2029-30Bridge Terrace Pembroke Storm Overflow
DCWW100980a · 198e7df8W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Penally Sewage Pumping Station
Due 2029-30Penally Storm Overflow
DCWW101070a · b78141c4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PICTON SEWAGE PUMPING STATION & PICTON FIELDS CSO
Due 2029-30Picton Place Storm Overflow
DCWW101123a · f7c04a93W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PONT-YR-HAFOD SEWAGE PUMPING STATION
Due 2029-30Hayscastle Storm Overflow
DCWW101107a · e5139098W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Priory Pumping Station, Milford Haven, Pembs
Due 2029-30Milford Haven Lower Priory Storm Overflow
DCWW101004a · b04e5ea0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PROMENADE NEYLAND SWO
Due 2029-30The Promenade Neyland Storm Overflow
DCWW101052a · 0839d50dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PUMPING STATION AT O.S NO. 0034, LORDS MEADOW FARM, ST. MICHAELS, PEMBROKE, DYFED
Due 2029-30Water body only
DCWW101777a · 5846b9f2W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
PUNCHESTON STW
Due 2029-30Water body only
DCWW102899a · 3ddace11W_HR_AMM_T_IMP1Improvement
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
PUNCHESTON STW
Due 2029-30Water body only
DCWW101950a · fdf8ebc8W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Puncheston WwTW
Due 2029-30Puncheston WwTW Storm Overflow
DCWW100930a · 77e95e73W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
RED ROSES STW
Due 2029-30Red Roses WwTW Overflow
DCWW101643a · d3fb77fcW_WFD_Minor_IMPImprovement
Implementation of actions to address Waste Water treatment Works WwTW impacts causing, and/or modelled as showing a predicted failure at either or both waterbody and site level on small rivers, tributaries or headwaters BOD, NH3 and/or P reduction under No deterioration (Biological Oxygen Demand, Ammonia and Phosphorus)
WQ
Rosemarket
Due 2029-30Water body only
DCWW102724a · 9e9fe445W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SAUNDERSFOOT EAST MILFORD STREET PS
Due 2029-30Saundersfoot East Storm Overflow
DCWW102739a · 7173ec48W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SAUNDERSFOOT NEW HEDGES SPS ROWSTEN HP
Due 2029-30New Hedges Overflow
DCWW101440a · c1d87e5aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
SCHOOL GARDENS,PENNAR,PEMBROKE DOCK
Due 2029-30Pembroke Dock Sycamore Street Storm Overflow
DCWW101462a · 12034ae5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Scleddau EO & CSO, Scleddau, Fishguard, Pembrokeshire, SA65 9RH
Due 2029-30Scleddau Storm Overflow
DCWW102553a · 973cddabW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SCLEDDAU WORKS INLET
Due 2029-30Scleddau Storm Overflow
DCWW102114a · dbfbd210W_HR_AMM_T_IMP1Improvement
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
SPITTAL STW
Due 2029-30Water body only
DCWW101582a · a6acf803W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SPITTAL WWTW SPITTAL PEMBS
Due 2029-30Spittal WwTW Storm Overflow
DCWW100884a · 35284ec1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ST ISHMAELS WWTW ( WORKS INLET)
Due 2029-30St Ishmaels WwTW Storm Overflow
DCWW102381a · 444831daW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
St Nicholas Crescent Pembroke
Due 2029-30Mill Bridge Pembroke Storm Overflow
DCWW101045a · b5b1cd34W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
STACKPOLE SEWAGE TREATMENT WORKS, STACKPOLE, PEMBROKESHIRE
Due 2029-30Stackpole WwTW Storm Overflow
DCWW101582a · e692317cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
STACKPOLE STW (EMERGENCY) STACKPOLE
Due 2029-30Stackpole WwTW Storm Overflow
DCWW101582a · 60489506W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
STACKPOLE STW STACKPOLE
Due 2029-30Stackpole WwTW Settled Storm Overflow 2
DCWW101108a · 94a12653W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Steynton SPS, Milford Haven
Due 2029-30Steynton Road Storm Overflow
DCWW101582a · 1cfe3484W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Storm Overflow at Wolfscastle Wastewater Treatment Works
Due 2029-30Wolfcastle WwTW Storm Overflow
DCWW101037a · cf147ee0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
STORM TANKS AT TENBY HEADWORKS
Due 2029-30Park Road Lower Park Road Overflow
DCWW102375a · 64490f34W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TEMPLETON (S OF NARBERTH) WORKS INLET
Due 2029-30Templeton WwTW Storm Overflow
DCWW101633a · da4929f3W_WFD_Minor_IMPImprovement
Implementation of actions to address Waste Water treatment Works WwTW impacts causing, and/or modelled as showing a predicted failure at either or both waterbody and site level on small rivers, tributaries or headwaters 'Fair share' reduction in phosphate from Templeton
WQ
Templeton STW - P-removal
Due 2029-30Templeton WwTW Storm Overflow
DCWW101582a · 33093b44W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TENBY LIFEBOAT CSO CASTLE SQ TENBY
Due 2029-30Tenby Lifeboat Slip Storm Overflow
DCWW100988a · e87a0faaW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
TENBY LIFEBOAT CSO, CASTLE SQUARE, TENBY, PEMBROKESHIRE
Due 2029-30Tenby Lifeboat Slip Storm Overflow
DCWW101582a · 9999b358W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
THE GLEN SAUNDERSFOOT PS . .
Due 2029-30The Glen Storm Overflow
DCWW101022a · 4f6ed444W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
THE PUMPING STATION, EX RNAD SITE, NEWTON Noyes, MILFORD HAVEN
Due 2029-30Coombs Drive Storm Overflow
DCWW101778a · b1065611W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
TREFFGARNE STW
Due 2029-30Water body only
DCWW100983a · 3a61ab6cW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
VALLEY ROAD PUMPING STATION (NO. 4 & 4A) COMMON OVERFLOW
Due 2029-30Valley Road Overflow
DCWW101582a · ca79bec9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
WALTON WEST STW BALANCING TANK
Due 2029-30Walton West WwTW Storm Overflow
DCWW100987a · a24b8dadW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
WATER ST PEMBROKE DOCK SWO
Due 2029-30Western Way Pembroke Dock Storm Overflow
DCWW102399a · cb3f8e05W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Watermans Arms Pembroke
Due 2029-30Mill Bridge Pembroke Storm Overflow
DCWW102900a · a326804aW_HR_AMM_T_IMP1Improvement
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
WOLFSCASTLE STW
Due 2029-30Water body only

184 of 184 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.