Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Forge Hammer Storm Overflow1Aberbaiden STWMeasure linked
Caravan Park Clydach Storm Overflow1Aberbaiden STWNo measure
Sennybridge Storm Overflow1Sennybridge (army Camp)Measure linked
Llanover Close Newport Overflow1Newport STWNo measure
Llangynidr Coed-yr-ynys Storm Overflow1Bwlch (south)Measure linked
King Street Brynmawr Storm Overflow1Brynmawr STWMeasure linked
Robertson Way Storm Overflow1Newport STWNo measure
Pilton Vale Storm Overflow1Newport STWMeasure linked
Horrocks Close Woodlands Storm Overflow1Newport STWMeasure linked
Barrack Hill Road Storm Overflow1Newport STWMeasure linked
Wavell Drive Storm Overflow1Newport STWNo measure
Bettws Lane Storm Overflow1Newport STWMeasure linked
Shaftesbury Park Storm Overflow1Newport STWMeasure linked
Hartridge Newport Storm Overflow1Newport STWMeasure linked
Talybont Cattle Market Storm Overflow1Talybont-on-uskMeasure linked
Maple Close Storm Overflow1Newport STWMeasure linked
Allt-yr-yn Avenue Newport Overflow1Newport STWNo measure
Chepstow Road 1 Storm Overflow1Newport STWMeasure linked
Howe Circle Storm Overflow1Newport STWMeasure linked
West of Barton Bridge Storm Overflow1RaglanMeasure linked
Brynawelon Storm Overflow1TrecastleMeasure linked
Heol Gouesnou Storm Overflow1Brecon STWNo measure
Limestone Road Storm Overflow1Cardiff STWMeasure linked
Cwrt Bryn Derwen Storm Overflow1Usk STWMeasure linked
Church Street Roundabout Storm Overflow1Newport STWMeasure linked
Bullpit Meadow Storm Overflow1Abergavenny STWMeasure linked
Glangrwyney Road Storm Overflow1Aberbaiden STWNo measure
Junction of Chepstow Road & Somerton Road Storm Overflow1Newport STWMeasure linked
Dan-y-gollen Overflow1Abergavenny STWMeasure linked
Liswerry Road Storm Overflow1Newport STWMeasure linked
Chepstow Road 2 Storm Overflow1Newport STWMeasure linked
Usk Road Caerleon Storm Overflow1Newport STWMeasure linked
Lodge Road Storm Overflow1Newport STWMeasure linked
Crickhowell Garn 2 Storm Overflow1Abergavenny STWMeasure linked
Pillmawr Road Storm Overflow1Newport STWMeasure linked
St. Cadoc's Hospital Storm Overflow1Newport STWMeasure linked
Magor Storm Overflow1Newport STWMeasure linked
Upstream of Crickhowell Garn 1 Storm Overflow1Abergavenny STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.