Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

160
Measures in this catchment
NEP, current record
146
Still active
not yet past their date
14
Assumed complete
completion date has passed
55
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100107a · 09d48433W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
ABERBAIDEN STW BEHIND HOP YARD FARM
Complete 2025-26Aberbaiden WwTW Inlet Storm Overflow
DCWW100137a · c739038eW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BRECON
Complete 2025-26Brecon WwTW Storm Overflow
DCWW100142a · da1e8470W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BRYNMAWR BLACKROCK
Complete 2025-26Brynmawr Blackrock WwTW Storm Overflow
DCWW100072a · 9296c11fW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BWLCH SOUTH
Complete 2025-26Bwlch WwTW Storm Overflow
DCWW100178a · 8359809aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CRICKHOWELL
Complete 2025-26Crickhowell WwTW Storm Overflow
DCWW100220a · 87a74341W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
GOYTRE WWTW (NR PONTYPOOL)
Complete 2025-26Goytre WwTW Storm Overflow
DCWW100241a · 86e9b9fdW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LITTLE MILL STW MONKSWOOD USK
Complete 2025-26Little Mill WwTW Overflow
DCWW100266a · f9665742W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANFOIST WWTW
Complete 2025-26Llanfoist WwTW Storm Overflow
DCWW100278a · cbb5b50eW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANGYBI (S OF USK)
Complete 2025-26Llangybi WwTW Storm Overflow
DCWW100316a · 3787ba9fW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
NASH STW WEST NASH ROAD NEWPORT
Complete 2025-26Nash WwTW Storm Overflow
DCWW100355a · 4784c425W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
RAGLAN STW CHEPSTOW ROAD RAGLAN
Complete 2025-26Raglan WwTW Storm Overflow
DCWW100095a · 1a75cd6eW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
SENNYBRIDGE ARMY CAMP
Complete 2025-26Sennybridge WwTW Storm Overflow
DCWW100379a · dd5b497eW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TALYBONT SEWAGE TREATMENT WORKS TAL
Complete 2025-26Talybont WwTW Storm Overflow
DCWW100404a · 7a0fc960W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
USK STW GRAIG OLWAY FARM LLANGVIEW
Complete 2025-26Usk WwTW Storm Overflow
DCWW102850a · 145105c6W_WFD_WRHMWB_INV1Investigation
Investigation and appraisal of options to determine the impact of abstraction on achievement of good ecological potential (GEP) in an Artificial or Heavily Modified Water Body (for water resources uses).
WR
Crai
Due 2026-27Water body only
DCWW102119a · 31b1f5bbW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CRICKHOWELL GARN 1 SPS EOF
Due 2026-27Crickhowell Garn 1 Storm Overflow
DCWW101531a · c309f802W_FISH_IMP1Improvement
Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage.
Fish
Fish Barrier Mitigation at asset 41097297
Due 2026-27Water body only
DCWW101666a · 32151d8bW_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration.
WQ
GREAT OAK
Due 2026-27Water body only
DCWW102621a · 6dbc71f9W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LIMESTONE ROAD
Due 2026-27Limestone Road Storm Overflow
DCWW102117a · ad3fd679W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANFRYNACH STW
Due 2026-27Llanfrynach WwTW Storm Overflow
DCWW102639a · c443fe2fW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MAGOR PS CSO
Due 2026-27Magor Storm Overflow
DCWW102187a · 6e5fcb55W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SHAFTESBURY PARK NEWPORT
Due 2026-27Shaftesbury Park Storm Overflow
DCWW102891a · 5aeb823fW_WFD_PG_IMP1Improvement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PG_IMP and associated PR19 driver paper
WQ
CAERWENT (7CDC1092)
Due 2027-28Water body only
DCWW100641a · abf8f117W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
TALYBONT-ON-USK
Due 2027-28Talybont WwTW Storm Overflow
DCWW101582a · 06a9a749W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
11 Robertson Way CSO, Newport
Due 2029-30Horrocks Close Woodlands Storm Overflow
DCWW101582a · 5fabdd7dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
27 Wavell Drive CSO
Due 2029-30Horrocks Close Woodlands Storm Overflow
DCWW100833a · d728430dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
A SPS, CAERLEON TOWN SEWAGE PUMPING STATION, CASTLE MEWS, CAERLEON, NEWPORT, NP18 1BY
Due 2029-30Caerleon Storm Overflow
DCWW100820a · 53d8b18eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
A SPS, RESIDENTIAL DEVELOPMENT OFF NEWGATE STREET, LLANFAES, BRECON, LD3 8DF
Due 2029-30Water body only
DCWW100819a · a6af4924W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
A SPS, RESIDENTIAL DEVELOPMENT OFF PRINCE CHARLES ROAD, RAGLAN, NP 15 2FB
Due 2029-30Water body only
DCWW101769b · 0f67843dW_HR_AMM_T_IMP1Improvement
Ammonia reduction to meet numeric permit limit Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
ABER STW
Due 2029-30Water body only
DCWW101769a · ef137b07W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
ABER VILLAGE
Due 2029-30Water body only
DCWW101760a · 9abeeb6fW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
ABERBAIDEN STW
Due 2029-30Water body only
DCWW102229a · 751ebdcbW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERBAIDEN STW STORM AT INLET
Due 2029-30Aberbaiden WwTW Inlet Storm Overflow
DCWW100789a · df4cdfd9W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Bettws Lane SPS, Bettws, Newport NP20 7AZ
Due 2029-30Bettws Lane Storm Overflow
DCWW100658a · 69d54a34W_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
BRECON
Due 2029-30Brecon WwTW Storm Overflow
DCWW101917a · cd3e1904W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Brecon - East STW Dorlangoch
Due 2029-30East of Brecon WwTW Storm Overflow
DCWW101920a · 7e65450fW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Brecon Main Pumping Station SPS
Due 2029-30Canal Road Brecon Storm Overflow
DCWW101582a · 7f5c7cf6W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Brecon Supermarket CSO
Due 2029-30Canal Road Brecon Storm Overflow
DCWW101582a · 48af137cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Bridge St CSO
Due 2029-30Bridge Street Crickhowell Storm Overflow
DCWW101582a · 24289573W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Brodawel - Sennybridge
Due 2029-30Brodawel Storm Storm Overflow
DCWW101761a · 05cf01eaW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
BRYN SEWAGE TREATMENT WORKS BRYN MONM
Due 2029-30Water body only
DCWW101582a · b1124733W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Brynawel Estate, Trecastle CSO
Due 2029-30Brynawelon Storm Overflow
DCWW102339a · aa64feadW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BRYNMAWR OPPOSITE BRIDGE END INN
Due 2029-30King Street Brynmawr Storm Overflow
DCWW101461a · 20f1cebeW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Brynmawr SPS Emergency Overflow, Brynmawr, Ebbw Vale, Blaenau Gwent, NP23 4SH
Due 2029-30King Street Brynmawr Storm Overflow
DCWW101704b · de0d4412W_HR_AMM_T_IMP1Improvement
Ammonia reduction to meet numeric permit limit Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
BWLCH (S) STW
Due 2029-30Water body only
DCWW101704a · 43ac725cW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
BWLCH S STW
Due 2029-30Water body only
DCWW101453a · 1e1f1fb2W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Caerleon (Usk Road) PS
Due 2029-30Usk road Caerleon Storm Overflow
DCWW100703a · 00305aa8W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Caerleon (Usk Road) PS
Due 2029-30Caerleon Storm Overflow
DCWW101582a · 64cb7701W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Caerleon Town Sewage Pumping Station
Due 2029-30Caerleon Storm Overflow
DCWW101582a · 27e8265aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAERLEON WWTW (STW) CSO CAERLEON
Due 2029-30Cold Bath Lane Storm Overflow
DCWW100739a · 61a02975W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CAPEL-ED FIELS RESIDENTIAL DEVELOPMENT PUMPING STATION, PENPERLLENI, PONTYPOOL
Due 2029-30Water body only
DCWW101582a · 12bd785fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Chepstsow Road CSO
Due 2029-30Chepstow Road 2 Storm Overflow
DCWW102555a · 3dc637c5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Christchurch STW Overflow SO
Due 2029-30Christchurch WwTW Storm Overflow
DCWW100733a · 11262e6dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CHURCH FARM RESIDENTIAL DEVMT PS
Due 2029-30Water body only
DCWW102678a · 906d079aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CHURCH STREET NEWPORT
Due 2029-30Church Street Roundabout Storm Overflow
DCWW101873a · cdb6713fW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
COEDWAUNGAER
Due 2029-30Water body only
DCWW100817a · 378f3f77W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CORPORATION ROAD, LISWERRY, NEWPORT
Due 2029-30Liswerry Storm Overflow
DCWW100816a · ff5dee10W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CORPORATION ROAD, LISWERRY, NEWPORT
Due 2029-30Junction of Chepstow Road & Somerton Road Storm Overflow
DCWW101871a · e0bb1546W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
CRADOC
Due 2029-30Water body only
DCWW100779a · 6cdb98e0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CRADOC PUMPING STATION
Due 2029-30Water body only
DCWW100471a · 3220cd3eW_WFD_WRHMWB_IMP1Improvement
Implementation of actions to mitigate impacts of abstraction and achieve Good ecological potential GEP in Artificial or Heavily Modified Water Bodies. This usually follows investigation in the previous AMP but not necessarily.
WR
Crai
Due 2029-30Water body only
DCWW101582a · e8d5e48eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Cray Sewage Treatment Works
Due 2029-30Crai WwTW Storm Overflow
DCWW101582a · 34918e1bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CRICKHOWELL - BRIDGE END CAR P
Due 2029-30Crickhowell Garn 2 Storm Overflow
DCWW100747a · bec4ff26W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CRICKHOWELL - BRIDGE END CAR PARK PS
Due 2029-30Crickhowell Garn 2 Storm Overflow
DCWW101582a · dbe07b5dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Crickhowell - Bullpit Meadow S CSO
Due 2029-30Bullpit Meadow Storm Overflow
DCWW101582a · 92f4470aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CRICKHOWELL CSO
Due 2029-30Crickhowell Garn 1 Storm Overflow
DCWW101715b · 5a05faa2W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
Crickhowell STW
Due 2029-30Water body only
DCWW101715a · 344dfec0W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
CRICKHOWELL STW
Due 2029-30Water body only
DCWW100760a · 66d2c18dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Croesllanfro PS Rogerstone (adj to 13 Bala Lane, Uplands)
Due 2029-30Water body only
DCWW101874a · e6c0e957W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
CROSS OAK (NR TALYBONTONUSK)
Due 2029-30Water body only
DCWW101463a · 7352e285W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CSO & EO AT SENNYBRIDGE VILLAGE SPS
Due 2029-30Sennybridge Storm Overflow
DCWW101582a · 24a9d542W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO and EO at Sennybridge Village SPS
Due 2029-30Sennybridge Storm Overflow
DCWW101582a · 4baee170W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Newport Chepstow Road Near No589
Due 2029-30Chepstow Road 1 Storm Overflow
DCWW101582a · 4192d6e9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Howe Circle
Due 2029-30Howe Circle Storm Overflow
DCWW101582a · 8ba1a765W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO AT NEWPORT PILLMAWR RD RELIEF SEW
Due 2029-30Pillmawr Road Storm Overflow
DCWW101868a · 24354fc5W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
CWMDU
Due 2029-30Water body only
DCWW100837a · 33f347afW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Dan y Gollen SPS, Crickhowell, Powys
Due 2029-30Dan-y-Gollen Overflow
DCWW101751a · a259c2c0W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
DEVAUDEN STW
Due 2029-30Water body only
DCWW101530a · ea138ad4W_FISH_IMP1Improvement
Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage.
Fish
Fish Barrier Mitigation at asset 40280307
Due 2029-30Water body only
DCWW100815a · c3d5488cW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
GARN PUMPING STATION, CRICKHOWELL, POWYS
Due 2029-30Crickhowell Garn 1 Storm Overflow
DCWW101753a · b0ab365eW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
GREAT OAK
Due 2029-30Water body only
DCWW102238a · 944172a3W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Great oak STW Overflow SO
Due 2029-30Great Oak WwTW Storm Overflow
DCWW101762a · 35a7074dW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
GROESFFORDD STW
Due 2029-30Water body only
DCWW100758a · 232eacddW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HAND FARM MEADOWS PUMPING STATION, NEW INN, PONTYPOOL
Due 2029-30Water body only
DCWW101582a · 454fa733W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Hartridge Farm SPS
Due 2029-30Hartridge Newport Storm Overflow
DCWW100811a · c98d0215W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HARTRIDGE FARM SPS, LANE ON R/BOUT NR HARTRIDGE FARM, NEWPORT,NP18
Due 2029-30Hartridge Newport Storm Overflow
DCWW100732a · 1de7b557W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HEOL FELIN/RUTH ROAD PUMPING STATION
Due 2029-30Water body only
DCWW101943a · d3317aa8W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
HUXLEY GREEN CSO, Newport
Due 2029-30South Of Huxley Green Rear Storm Overflow
DCWW100734a · be95616bW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LADYHILL PUMPING STATION, USK
Due 2029-30Cwrt Bryn Derwen Storm Overflow
DCWW101465a · a4edf8e3W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Land off Tredillon Road, Abergavenny
Due 2029-30Water body only
DCWW101582a · 94504e41W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Legar CSO
Due 2029-30Legar Storm Overflow
DCWW101932a · 2dea25a3W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Legar CSO, Crickhowell
Due 2029-30Legar Storm Overflow
DCWW101582a · 9982baa5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Liswerry Rd/Aberthaw Rd Newport ,
Due 2029-30Liswerry Road Storm Overflow
DCWW100671a · f2f30a1bW_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
LITTLE MILL
Due 2029-30Water body only
DCWW101757b · c2979b36W_HR_AMM_T_IMP1Improvement
Ammonia reduction to meet numeric permit limit Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
LITTLE MILL STW
Due 2029-30Water body only
DCWW101757a · 1ee01f58W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LITTLE MILL STW MONKSWOOD USK
Due 2029-30Water body only
DCWW101754a · 085af167W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANARTH STW LLANARTH MONMOUTHSHIRE
Due 2029-30Water body only
DCWW100537a · b64c784bW_BW_IMP3Improvement
Schemes to implement W_BW_INV4 (non-designated waters)
BW
Llandegfedd
Due 2029-30Water body only
DCWW101763a · c38e97c9W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANELLEN STW
Due 2029-30Water body only
DCWW101763b · 306c8f4eW_HR_AMM_T_IMP1Improvement
Ammonia reduction to meet numeric permit limit Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
LLANELLEN STW
Due 2029-30Water body only
DCWW101764a · 967a1771W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANFAIR SEWAGE TREATMENT WORKS
Due 2029-30Water body only
DCWW101872a · 95e841ffW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANFIHANGEL NANT BRAN (N OF SENNYBRI
Due 2029-30Water body only
DCWW102858b · 0ca85bd3W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
LLANFOIST WASTEWATER TREATMENT WORKS
Due 2029-30Water body only
DCWW100673a · d6362a57W_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
LLANFOIST WWTW
Due 2029-30Llanfoist WwTW Storm Overflow
DCWW101765a · 240d5e58W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANGIBBY STW
Due 2029-30Water body only
DCWW101765b · ada4206eW_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
LLANGYBI SEWAGE TREATMENT WORKS
Due 2029-30Water body only
DCWW101582a · 5bc76594W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llangybi STW Llangybi Usk Settled Storm
Due 2029-30Llangybi WwTW Storm Overflow
DCWW101582a · a93bfef9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llangynidr (Coed-yr-Ynys) SPS
Due 2029-30Llangynidr Coed-Yr-Ynys Storm Overflow
DCWW100746a · 2ccbd8d9W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANGYNIDR P.S. - OVERFLOW
Due 2029-30Llangynidr Coed-Yr-Ynys Storm Overflow
DCWW101766b · 4a16699cW_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
LLANOVER STW
Due 2029-30Water body only
DCWW101766a · 28ed59fcW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANOVER STW
Due 2029-30Water body only
DCWW101767a · a25ddaccW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANSPYDDID STW
Due 2029-30Water body only
DCWW102692a · 5edb85afW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Lodge Road CSO Caerleon
Due 2029-30Lodge Road Storm Overflow
DCWW101582a · 1b780acbW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Maesygwartha SPS and CSO
Due 2029-30Water body only
DCWW100702a · 4598b267W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Maesygwartha SPS and CSO, Gilwern, Monmouthshire NP7 0HA
Due 2029-30Forge Hammer Storm Overflow
DCWW100825a · 3bf063bdW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MAGOR SEWAGE PUMPING STATION, MAGOR STW SITE, MAGOR, NEWPORT
Due 2029-30Magor Storm Overflow
DCWW101468a · 6b6200b2W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MALPAS PARK/ROWAN WAY PS, MALPAS, NEWPORT
Due 2029-30Pilton Vale Storm Overflow
DCWW101582a · 6354e08cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Maple Close CSO, Underwood
Due 2029-30Maple Close Storm Overflow
DCWW101916a · 09ccf2c9W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
MILL STREET CASTLE MEADOWS
Due 2029-30Mill Street Castle Meadows Storm Overflow
DCWW102342a · fa20ecc7W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWPORT BARRACK HILL LOWER END
Due 2029-30Barrack Hill Road Storm Overflow
DCWW102317a · 85f9ac74W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWPORT BETTWS LANE PS
Due 2029-30Bettws Lane Storm Overflow
DCWW102309a · 72515ecdW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWPORT BRYNGLAS ROAD NO 33
Due 2029-30Brynglas Road Storm Overflow
DCWW102560a · 6db07685W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWPORT LISWERRY PILL PS
Due 2029-30Liswerry Storm Overflow
DCWW102566a · 977f906bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWPORT MALPAS PARK PS (ROWAN WAY PS)
Due 2029-30Rowan Way Storm Overflow
DCWW102233a · 97c90524W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWPORT NASH STW STORM
Due 2029-30Nash WwTW Storm Overflow
DCWW102567a · 1b612dc1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWPORT ST JULIANS ROAD OPPOSITE NO 1
Due 2029-30St. Julians Avenue Newport Storm Overflow
DCWW101875a · 0779624cW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
PENCELLI (SE OF BRECON)
Due 2029-30Water body only
DCWW101876a · 5341d246W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
PENNORTH & SCETHROG
Due 2029-30Water body only
DCWW101582a · 76f14254W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Pill North PS North Octopus Rdbt
Due 2029-30Pill North Storm Overflow
DCWW101582a · d21fa54bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Pill South B Pumping Station
Due 2029-30Pill South Storm Overflow
DCWW100762a · f58744b4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PRIORY DRIVE SPS, PRIORY DRIVE, LANGSTONE, NEWPORT
Due 2029-30Water body only
DCWW101582a · 8995a72bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
R/O 228 Pilton Vale CSO, Newport
Due 2029-30Pilton Vale Storm Overflow
DCWW102230a · 47070c06W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
RAGLAN STW STORM
Due 2029-30Raglan WwTW Storm Overflow
DCWW100701a · b54b1b97W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ROBERTSON WAY/WOODLAND PS, MALPAS, NEWPORT
Due 2029-30Horrocks Close Woodlands Storm Overflow
DCWW101938a · fd54f1bdW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Sennybridge Army Camp CSO, Sennybridge
Due 2029-30Sennybridge WwTW Storm Overflow
DCWW101582a · aa3d33bcW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SOMERTON ROAD BALMORAL ROAD CSO NEW
Due 2029-30Somerton Road Storm Overflow
DCWW102661a · f2749688W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ST CADOCS CHURCH CSO, RAGLAN
Due 2029-30West of Barton Bridge Storm Overflow
DCWW101582a · 493942e2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
St Cadocs Hospital CSO
Due 2029-30St. Cadoc's Hospital Storm Overflow
DCWW101582a · c858ef59W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Talybont Across from Cattle Market CSO
Due 2029-30Talybont Cattle Market Storm Overflow
DCWW102252a · 0a614c67W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TALYBONT STW STORM
Due 2029-30Talybont WwTW Storm Overflow
DCWW101761b · fee9bd02W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
The Bryn
Due 2029-30Water body only
DCWW100836a · 974eac4fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
The Manor SPS, Newport Road, Llantarnam, Cwmbran, NP44 3AQ
Due 2029-30Water body only
DCWW100853a · 053be5b2W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
THE SHIP INN PUB CAR PARK OUTFALL, LULWORTH RD, CAERLEON
Due 2029-30Caerleon Storm Overflow
DCWW101582a · 476fe0b5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Treberth Estate CSO
Due 2029-30Treberth Crescent Storm Overflow
DCWW101922a · b4c24b19W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Trecastle SWK
Due 2029-30Trecastle WwTW Storm Overflow
DCWW101869a · bdca8f5aW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
TRELLEC SEWAGE TREATMENT WORKS
Due 2029-30Water body only
DCWW101870a · 543ab5fbW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
TRETOWER
Due 2029-30Water body only
DCWW101918a · 0b6eb785W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Underwood SPS
Due 2029-30Underwood Storm Overflow
DCWW100704a · 1236ab16W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Underwood SPS, Underwood, Newport
Due 2029-30Underwood Storm Overflow
DCWW100782a · 66d015f8W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
UNDY PUMPING STATION, NEAR CHURCH ROAD, UNDY, GWENT
Due 2029-30Water body only
DCWW102534a · e37f2d2cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
USK PS
Due 2029-30Mill Lane Usk Overflow
DCWW102689a · b26f38e9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
USK RAILWAY COTTAGE
Due 2029-30Cwrt Bryn Derwen Storm Overflow
DCWW101582a · b5c591b0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Usk Road PS Usk Road Caerleon
Due 2029-30Usk road Caerleon Storm Overflow
DCWW101750b · 88ad9db6W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
USK STW
Due 2029-30Water body only
DCWW101750a · a2931fb0W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
USK STW GRAIG OLWAY
Due 2029-30Water body only
DCWW102231a · f800a244W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
USK STW STORM
Due 2029-30Water body only
DCWW100808a · 6ec443fdW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
USK VIEW PUMPING STATION, MERTHYR ROAD, LLANFOIST
Due 2029-30Water body only
DCWW101582a · d02aab28W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Woodlands (Horrocks Close) SPS
Due 2029-30Horrocks Close Woodlands Storm Overflow
DCWW100606a · 7b79a241W_U_IMP7(a-e)Improvement
Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS Biological Oxygen Demand: Suspended Soilids
WQ
WOODSIDE No 2, Usk Septic Tank
Due 2029-30Water body only
DCWW100607a · cdcc9076W_U_IMP7(a-e)Improvement
Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS Biological Oxygen Demand: Suspended Soilids
WQ
WOODSIDE, Usk Septic Tank
Due 2029-30Water body only

160 of 160 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.