← All spills

Individual spills are recorded from 28 November 2026. Wales has no published record of each discharge, so River Hub builds one by reading Dŵr Cymru Welsh Water’s live feed every hour, starting on that date. Earlier years show the yearly totals from the annual returns only.

Sennybridge Wwtw Storm Overflow

DCWW771
Overflow on the network feeding Sennybridge (army Camp) · Storm overflow
Showing history for 2024 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
—
Counted spills, 2024
0
0 discharge events
Hours spilled, 2024
0
Is the feed working?
Working
Last checked 24 min ago · we poll SWW hourly
48h agonow
4/48 hourly readings received
Dry spills, 2024
0
None in 2024 · 0 since 2020
How a dry spill is decided →
Spilled before its STW, 2024
0
0 in 2024 · 0 since 2020
What this means →

Can its works cope?

Full capacity view →

This overflow drains to Sennybridge (army Camp), serving about 951 people.

—
of permitted flow
Not assessed

We cannot check the works yet: River Hub doesn't hold its permitted flow, or the population it serves is unknown.

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Not crossed (threshold 30/year)

Is anyone acting on this?

Flagged problems

Nothing flagged by the analysis.

Measures on record
  • MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
    WQ
    Monitoringcomplete 2026
  • Action to implement improvements to overflows classified as Unsatisfactory
    WQ
    Improvementdue 2030
Verdict
Improvement under way

A physical improvement is committed against this overflow.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Sennybridge Wwtw Storm Overflow's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

Serious pollution incidents recorded here

All incidents on the River Usk →
  1. 10 Jun 2026Process effluent · about 40 m from Sennybridge Wwtw Storm OverflowSignificant impact on water · NRW ref 2606206 · Ask for the full report ↗Significant

Natural Resources Wales pollution incident records (category 1 and 2, closed incidents), via the open dataset. Contains Natural Resources Wales information © Natural Resources Wales and Database Right. NRW records where an incident happened, not who caused it: “near” an overflow is not a finding that it was responsible. Recent incidents appear only once NRW closes them; minor (category 3) incidents aren’t published. The open data gives only the date, place, severity and pollutant: the cause, the watercourse, any sampling and any enforcement are in NRW’s incident report, which anyone can ask for by its reference. Checked 28 Nov 2026.

Put this on the national record

This is the fastest way to act on what you have seen. Our petition asks the Government to publish a fix-by date and yearly progress for every storm overflow. At 100,000 signatures it must be considered for debate in Parliament.

358of 10,000 for a Government response
Sign the petition ↗

The record since 2020

0 dry spills and 0 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2024: 0 spills · 0 discharge events

Counted spills — the standard 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

Dry spills, every year

0 dry spills since 2020 · showing up to 12

No dry spills on record for this overflow since 2020.

Spilled before its works

0 events since 2020 · started while Sennybridge (army Camp) stayed shut

This overflow has never been recorded spilling ahead of its treatment works.

No spills over 15 minutes in 2024

Nothing over 15 minutes was recorded at this overflow in 2024. Discharges shorter than 15 minutes are excluded everywhere on this site — a brief operational blip is not counted as a spill. How we know.