Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The Upper Wye is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

15
Above the 2050 cap
of 27 tracked
8
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
12
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Llanwrtyd Wells Storm Overflow
DCWW1491
2050121 ·22
148
0 events
+22%14.8×Rising
Rock Park Close Llandrindod Wells Overflow
DCWW1642
205074 ·22
87
0 events
+18%8.7×Rising
Abernant Lake Storm Overflow
DCWW720
2050115 ·22
70
0 events
-39%7×Falling — behind
Howey Wwtw Storm Overflow
DCWW2160
205041 ·22
62
0 events
+51%6.2×Rising
Dolwen Fields Storm Overflow
DCWW980
205053 ·22
59
0 events
+11%5.9×Rising
Temple Street Llandrindod Wells Overflow
DCWW1969
20504 ·22
54
0 events
+1250%5.4×Rising
Bronllys Storm Overflow
DCWW1363
205071 ·22
48
0 events
-32%4.8×Falling — behind
Builth Wells Wwtw Storm Overflow
DCWW2149
205075 ·22
46
0 events
-39%4.6×Falling — behind
Ddole Road Llandrindod Wells Overflow
DCWW1315
20500 ·22
46
0 events
—4.6×Rising
Llanelwedd Storm Overflow
DCWW563
205011 ·22
36
0 events
+227%3.6×Rising
Three Cocks Storm Overflow
DCWW1067
205041 ·22
35
0 events
-15%3.5×Falling — behind
Newbridge -on-wye Wwtw Storm Overflow
DCWW836
205029 ·22
26
0 events
-10%2.6×Falling — behind
Trefecca Old Railway Storm Overflow
DCWW1331
205026 ·22
22
0 events
-15%2.2×Falling — behind
Llandrindod Wells Crabtree Green Storm Overflow
DCWW1728
20502 ·22
16
0 events
+700%1.6×Rising
Penybont Overflow
DCWW1137
205019 ·22
15
0 events
-21%1.5×Nearly there
Llanwrthwl Wwtw Overflow
DCWW1701
20500 ·22
9
1 events
—0.9×Within the cap
Llangammarch Wells Wwtw Storm Overflow
DCWW1868
205094 ·22
9
0 events
-90%0.9×Within the cap
Bronllys Road North Storm Overflow
DCWW442
20500 ·22
6
0 events
—0.6×Within the cap
Bronllys Road South Storm Overflow
DCWW441
205010 ·22
6
0 events
-40%0.6×Within the cap
Gwernyfed Park Storm Overflow
DCWW1598
20502 ·22
4
0 events
+100%0.4×Within the cap
Rhayader Fields Storm Overflow
DCWW1822
205021 ·22
4
0 events
-81%0.4×Within the cap
Llangors Overflow
DCWW1976
20500 ·22
4
0 events
—0.4×Within the cap
Erwood Overflow
DCWW1603
205024 ·22
3
0 events
-88%0.3×Within the cap
Water Lane Rhayader Overflow
DCWW1679
20506 ·22
3
0 events
-50%0.3×Within the cap
Wye Bridge Storm Overflow
DCWW1542
20502 ·22
2
1 events
0%0.2×Within the cap
North Road Storm Overflow
DCWW834
20501 ·25
1
1 events
0%0.1×—Within the cap
Waun Capel Parc Storm Overflow
DCWW226
20500 ·22
0
0 events
—0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →