Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

59
Measures in this catchment
NEP, current record
50
Still active
not yet past their date
9
Assumed complete
completion date has passed
24
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100112a · 17bd163bW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
ABERLLYNFI THREE COCKS
Complete 2025-26Three Cocks Storm Overflow
DCWW100126a · 56333040W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BEULAH (NR LLANWRTYD WELLS)
Complete 2025-26Beulah WwTW Storm Overflow
DCWW100146a · bfa35176W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BUILTH WELLS STW
Complete 2025-26Builth Wells WwTW Storm Overflow
DCWW100181a · 765e1fe3W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CROSSGATES STW
Complete 2025-26Crossgates WwTW Storm Overflow
DCWW100185a · f30ac711W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CSO AT NEWBRIDGE ON WYE STW
Complete 2025-26Newbridge -on-Wye WwTW Storm Overflow
DCWW100252a · b5a4f7a3W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANDRINDOD WELLS STW PARK LANE
Complete 2025-26Llandrindod Wells WwTW Storm Overflow
DCWW100293a · 7016c580W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANWRTYD WELLS STW LLANWRTYD WELLS
Complete 2025-26Llanwrtyd Wells Storm Overflow
DCWW100358a · 0fa774baW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
RHAYADER STW RHAYADER
Complete 2025-26Rhayader WwTW Tank Storm Overflow
DCWW100376a · 5b9f10fdW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TALGARTH STW BRONLLYS ROAD TALGARTH
Complete 2025-26Talgarth WwTW Storm Overflow
ST100002a · aaad5368W_HR_INV1Investigation
Investigate reasons for run to waste
WQ
Elan valley water works
Due 2026-27Water body only
DCWW102140a · b8a51ee1W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ERWOOD A470 CLETWR BROOK EOF
Due 2026-27Erwood Overflow
DCWW102139a · dd0a5b96W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANDRINDOD WELLS DDOLE ROAD PS
Due 2026-27Ddole Road Llandrindod Wells Overflow
DCWW101625a · 0358d1b8W_WFD_PG_IMP3Improvement
Implementation of actions to achieve Good status at a waterbody and / or site level due to BOD (as DO) and / or ammonia relating to Reasons for Not Achieving Good (RNAGs) recommendations identified against water company assets or activities
WQ
Llanigon STW
Due 2026-27Water body only
DCWW102116a · 8e0e3ea1W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWBRIDGE-ON-WYE STW OFF A470 R/WAY BRDG
Due 2026-27Newbridge -on-Wye WwTW Storm Overflow
DCWW102866a · 4d706810W_WFD_PG_IMP1Improvement
Improvements atWaste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PG_IMP and associated PR19 driver paper
WQ
TALGARTH STW (7CDC0998)
Due 2027-28TALGARTH STW BRONLLYS ROAD TALGARTH STW
DCWW101711a · 1dcb478eW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
Clyro Wastewater Treatment Works (6DC002875)
Due 2027-28Water body only
DCWW101582a · c7b2cc27W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
A479 Bronlly Road CSO
Due 2029-30Bronllys Road North Storm Overflow
DCWW100589a · 737640a9W_U_IMP7(a-e)Improvement
Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS Biological Oxygen Demand: Suspended Soilids
WQ
ABBEYCWMHIR Septic Tank
Due 2029-30Water body only
DCWW101840a · 6cf70fb1W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
ABEREDW SEWAGE TREATMENT WORKS
Due 2029-30Water body only
DCWW100844a · 7ab95b41W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Aberllynfi/ Three Cocks SPS, Brecon LD3 0SN
Due 2029-30Three Cocks Storm Overflow
DCWW100838a · eea18086W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Beulah Sewage Pumping Station
Due 2029-30Beulah WwTW Storm Overflow
DCWW100146b · 44d7cbf2W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
BUILTH WELLS STW
Due 2029-30Water body only
DCWW101454a · 216d83faW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Builth Wells WwTW (Storm)
Due 2029-30Builth Wells WwTW Storm Overflow
DCWW100769a · 33639237W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BWLCH NORTH PUMPING STATION
Due 2029-30Water body only
DCWW101842a · f7a59b53W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
Cefn Gorwydd Wastewater Treatment Wor
Due 2029-30Water body only
DCWW101582a · 71319d75W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Cefn Gorwydd Wastewater Treatment Works
Due 2029-30Cefn Gorwydd WwTW Storm Overflow
DCWW102314a · a20c3ddcW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CROSS GATES STW A483 RAILWAY BRIDGE
Due 2029-30Crossgates WwTW Storm Overflow
DCWW100181b · 03b1d43fW_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
CROSSGATES STW
Due 2029-30CROSS GATES
DCWW101582a · 326cdc35W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Ithon Road, Llandrindod Wells
Due 2029-30Llandrindod Wells Crabtree Green Storm Overflow
DCWW101582a · 70f3822fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Llanelwedd Primary School Bridge
Due 2029-30Llanelwedd Storm Overflow
DCWW101582a · 4f3a54e3W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Talgarth o/s Autumn lodge
Due 2029-30Bronllys Road South Storm Overflow
DCWW101582a · 7d70b194W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Weun Chapel Park Toilets, Rhayader
Due 2029-30Waun Capel Parc Storm Overflow
DCWW101582a · 4754bf68W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO Llanelwedd - Scout Hut Station Road
Due 2029-30Wye Bridge Storm Overflow
ST100002b · cff5bd37W_HR_IMP1Improvement
Implementation of actions to contribute to restoring favourable conservation status of designated habitats and species of a European site or Ramsar site.
WQ
Elan valley water works
Due 2029-30Water body only
DCWW101844a · 435c547aW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
ERWOOD STW ERWOOD BUILTH WELLS
Due 2029-30Water body only
DCWW101714a · 6a9e1b02W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
GARTH STW
Due 2029-30Water body only
DCWW101450a · 23a3d04bW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Howey Sewage Pumping Station Holly Lane, Disserth and Trecoed, Howey,
Due 2029-30Howey WwTW Storm Overflow
DCWW101582a · 98ab6d68W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Islwyn Rd CSO, Crosskeys
Due 2029-30Cefn Gorwydd WwTW Storm Overflow
DCWW101845a · 2c43e6f2W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANFAREDD SEWAGE TREATMENT WORKS
Due 2029-30Water body only
DCWW101708a · d120171dW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. for P and Ammonia
WQ
LLANGAMMARCH WELLS STW
Due 2029-30Llangammarch Wells
DCWW100745a · e8304d64W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANGURIG P.S. - OVERFLOW
Due 2029-30Llangurig Storm Overflow
DCWW101710a · 623e20ddW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANGURIG STW
Due 2029-30Water body only
DCWW101841a · 683e7f15W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANWRTHWL STW
Due 2029-30Llanwrthwl
DCWW101703a · 823a4d0dW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANYRE STW
Due 2029-30LLANYRE
DCWW101703b · f8cc21feW_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
LLANYRE STW
Due 2029-30LLANYRE
DCWW101919a · c1508984W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Newbridge on Wye WwTW
Due 2029-30Newbridge -on-Wye WwTW Storm Overflow
DCWW101695b · 26b31604W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
NEWBRIDGEONWYE STW
Due 2029-30NEWBRIDGE-ON-WYE
DCWW101695a · 6073bb79W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
NEWBRIDGEONWYE STW
Due 2029-30NEWBRIDGE-ON-WYE
DCWW101705a · c7680006W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
PENYBONT (NR LLANDRINDOD WELLS) SWK
Due 2029-30Water body only
DCWW100767a · 31ceeac6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PENYBONT SEWAGE PUMPING STATION, PENYBONT, POWYS
Due 2029-30Penybont Overflow
DCWW102349a · 922407b7W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Rhayader fields St. Brides Church
Due 2029-30Rhayader Fields Storm Overflow
DCWW102242a · 2fc5c95bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Rhayader STW CSO
Due 2029-30Rhayader WwTW Inlet Storm Overflow
DCWW101912a · 3faab93eW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Rock Park Close CSO, Llandrindod Wells
Due 2029-30Rock Park Close Llandrindod Wells Overflow
DCWW102337a · 022c93c9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TALGARTH BRONLLYS ROAD STW EOF
Due 2029-30Talgarth WwTW Storm Overflow
DCWW101931a · c3ae86d7W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
The Strand Builth Wells
Due 2029-30The Strand Storm Overflow
DCWW101582a · 81ae83ebW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Three Cocks
Due 2029-30Gwernyfed Park Storm Overflow
DCWW102334a · 052a9599W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Three Cocks o/s SPS Station
Due 2029-30Three Cocks Storm Overflow
DCWW102358a · 7b716045W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Trefecca old Railway Maesgwyn
Due 2029-30Trefecca Old Railway Storm Overflow
DCWW101727a · 7ca65567W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
VELINDRE STW
Due 2029-30Water body only

59 of 59 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.