What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100112a · 17bd163b | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ ABERLLYNFI THREE COCKS | Complete 2025-26 | Three Cocks Storm Overflow |
| DCWW100126a · 56333040 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BEULAH (NR LLANWRTYD WELLS) | Complete 2025-26 | Beulah WwTW Storm Overflow |
| DCWW100146a · bfa35176 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BUILTH WELLS STW | Complete 2025-26 | Builth Wells WwTW Storm Overflow |
| DCWW100181a · 765e1fe3 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CROSSGATES STW | Complete 2025-26 | Crossgates WwTW Storm Overflow |
| DCWW100185a · f30ac711 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CSO AT NEWBRIDGE ON WYE STW | Complete 2025-26 | Newbridge -on-Wye WwTW Storm Overflow |
| DCWW100252a · b5a4f7a3 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANDRINDOD WELLS STW PARK LANE | Complete 2025-26 | Llandrindod Wells WwTW Storm Overflow |
| DCWW100293a · 7016c580 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANWRTYD WELLS STW LLANWRTYD WELLS | Complete 2025-26 | Llanwrtyd Wells Storm Overflow |
| DCWW100358a · 0fa774ba | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ RHAYADER STW RHAYADER | Complete 2025-26 | Rhayader WwTW Tank Storm Overflow |
| DCWW100376a · 5b9f10fd | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TALGARTH STW BRONLLYS ROAD TALGARTH | Complete 2025-26 | Talgarth WwTW Storm Overflow |
| ST100002a · aaad5368 | W_HR_INV1 | Investigation | Investigate reasons for run to waste WQ Elan valley water works | Due 2026-27 | Water body only |
| DCWW102140a · b8a51ee1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ERWOOD A470 CLETWR BROOK EOF | Due 2026-27 | Erwood Overflow |
| DCWW102139a · dd0a5b96 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANDRINDOD WELLS DDOLE ROAD PS | Due 2026-27 | Ddole Road Llandrindod Wells Overflow |
| DCWW101625a · 0358d1b8 | W_WFD_PG_IMP3 | Improvement | Implementation of actions to achieve Good status at a waterbody and / or site level due to BOD (as DO) and / or ammonia relating to Reasons for Not Achieving Good (RNAGs) recommendations identified against water company assets or activities WQ Llanigon STW | Due 2026-27 | Water body only |
| DCWW102116a · 8e0e3ea1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NEWBRIDGE-ON-WYE STW OFF A470 R/WAY BRDG | Due 2026-27 | Newbridge -on-Wye WwTW Storm Overflow |
| DCWW102866a · 4d706810 | W_WFD_PG_IMP1 | Improvement | Improvements atWaste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PG_IMP and associated PR19 driver paper WQ TALGARTH STW (7CDC0998) | Due 2027-28 | TALGARTH STW BRONLLYS ROAD TALGARTH STW |
| DCWW101711a · 1dcb478e | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ Clyro Wastewater Treatment Works (6DC002875) | Due 2027-28 | Water body only |
| DCWW101582a · c7b2cc27 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ A479 Bronlly Road CSO | Due 2029-30 | Bronllys Road North Storm Overflow |
| DCWW100589a · 737640a9 | W_U_IMP7(a-e) | Improvement | Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS Biological Oxygen Demand: Suspended Soilids WQ ABBEYCWMHIR Septic Tank | Due 2029-30 | Water body only |
| DCWW101840a · 6cf70fb1 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ ABEREDW SEWAGE TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW100844a · 7ab95b41 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Aberllynfi/ Three Cocks SPS, Brecon LD3 0SN | Due 2029-30 | Three Cocks Storm Overflow |
| DCWW100838a · eea18086 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Beulah Sewage Pumping Station | Due 2029-30 | Beulah WwTW Storm Overflow |
| DCWW100146b · 44d7cbf2 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ BUILTH WELLS STW | Due 2029-30 | Water body only |
| DCWW101454a · 216d83fa | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Builth Wells WwTW (Storm) | Due 2029-30 | Builth Wells WwTW Storm Overflow |
| DCWW100769a · 33639237 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BWLCH NORTH PUMPING STATION | Due 2029-30 | Water body only |
| DCWW101842a · f7a59b53 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ Cefn Gorwydd Wastewater Treatment Wor | Due 2029-30 | Water body only |
| DCWW101582a · 71319d75 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cefn Gorwydd Wastewater Treatment Works | Due 2029-30 | Cefn Gorwydd WwTW Storm Overflow |
| DCWW102314a · a20c3ddc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CROSS GATES STW A483 RAILWAY BRIDGE | Due 2029-30 | Crossgates WwTW Storm Overflow |
| DCWW100181b · 03b1d43f | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ CROSSGATES STW | Due 2029-30 | CROSS GATES |
| DCWW101582a · 326cdc35 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Ithon Road, Llandrindod Wells | Due 2029-30 | Llandrindod Wells Crabtree Green Storm Overflow |
| DCWW101582a · 70f3822f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Llanelwedd Primary School Bridge | Due 2029-30 | Llanelwedd Storm Overflow |
| DCWW101582a · 4f3a54e3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Talgarth o/s Autumn lodge | Due 2029-30 | Bronllys Road South Storm Overflow |
| DCWW101582a · 7d70b194 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Weun Chapel Park Toilets, Rhayader | Due 2029-30 | Waun Capel Parc Storm Overflow |
| DCWW101582a · 4754bf68 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO Llanelwedd - Scout Hut Station Road | Due 2029-30 | Wye Bridge Storm Overflow |
| ST100002b · cff5bd37 | W_HR_IMP1 | Improvement | Implementation of actions to contribute to restoring favourable conservation status of designated habitats and species of a European site or Ramsar site. WQ Elan valley water works | Due 2029-30 | Water body only |
| DCWW101844a · 435c547a | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ ERWOOD STW ERWOOD BUILTH WELLS | Due 2029-30 | Water body only |
| DCWW101714a · 6a9e1b02 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ GARTH STW | Due 2029-30 | Water body only |
| DCWW101450a · 23a3d04b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Howey Sewage Pumping Station Holly Lane, Disserth and Trecoed, Howey, | Due 2029-30 | Howey WwTW Storm Overflow |
| DCWW101582a · 98ab6d68 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Islwyn Rd CSO, Crosskeys | Due 2029-30 | Cefn Gorwydd WwTW Storm Overflow |
| DCWW101845a · 2c43e6f2 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANFAREDD SEWAGE TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW101708a · d120171d | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. for P and Ammonia WQ LLANGAMMARCH WELLS STW | Due 2029-30 | Llangammarch Wells |
| DCWW100745a · e8304d64 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANGURIG P.S. - OVERFLOW | Due 2029-30 | Llangurig Storm Overflow |
| DCWW101710a · 623e20dd | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANGURIG STW | Due 2029-30 | Water body only |
| DCWW101841a · 683e7f15 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANWRTHWL STW | Due 2029-30 | Llanwrthwl |
| DCWW101703a · 823a4d0d | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANYRE STW | Due 2029-30 | LLANYRE |
| DCWW101703b · f8cc21fe | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ LLANYRE STW | Due 2029-30 | LLANYRE |
| DCWW101919a · c1508984 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Newbridge on Wye WwTW | Due 2029-30 | Newbridge -on-Wye WwTW Storm Overflow |
| DCWW101695b · 26b31604 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ NEWBRIDGEONWYE STW | Due 2029-30 | NEWBRIDGE-ON-WYE |
| DCWW101695a · 6073bb79 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ NEWBRIDGEONWYE STW | Due 2029-30 | NEWBRIDGE-ON-WYE |
| DCWW101705a · c7680006 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ PENYBONT (NR LLANDRINDOD WELLS) SWK | Due 2029-30 | Water body only |
| DCWW100767a · 31ceeac6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENYBONT SEWAGE PUMPING STATION, PENYBONT, POWYS | Due 2029-30 | Penybont Overflow |
| DCWW102349a · 922407b7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rhayader fields St. Brides Church | Due 2029-30 | Rhayader Fields Storm Overflow |
| DCWW102242a · 2fc5c95b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rhayader STW CSO | Due 2029-30 | Rhayader WwTW Inlet Storm Overflow |
| DCWW101912a · 3faab93e | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Rock Park Close CSO, Llandrindod Wells | Due 2029-30 | Rock Park Close Llandrindod Wells Overflow |
| DCWW102337a · 022c93c9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TALGARTH BRONLLYS ROAD STW EOF | Due 2029-30 | Talgarth WwTW Storm Overflow |
| DCWW101931a · c3ae86d7 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ The Strand Builth Wells | Due 2029-30 | The Strand Storm Overflow |
| DCWW101582a · 81ae83eb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Three Cocks | Due 2029-30 | Gwernyfed Park Storm Overflow |
| DCWW102334a · 052a9599 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Three Cocks o/s SPS Station | Due 2029-30 | Three Cocks Storm Overflow |
| DCWW102358a · 7b716045 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Trefecca old Railway Maesgwyn | Due 2029-30 | Trefecca Old Railway Storm Overflow |
| DCWW101727a · 7ca65567 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ VELINDRE STW | Due 2029-30 | Water body only |
59 of 59 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.