Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Church Street Llanuwchllyn Storm Overflow1LlanuwchllynMeasure linked
Chirk Bank Storm Overflow1Dee STWMeasure linked
North West of Bro-ddewi Dolywern Storm Overflow1DolywernMeasure linked
Penycae Storm Overflow1Dee STWMeasure linked
Paddock Row Ruabon Storm Overflow No21Dee STWMeasure linked
Park Road Rhosymedre Storm Overflow1Cefn Mawr STWNo measure
Llandrillo Storm Overflow1LlandrilloMeasure linked
Northern Terrace Corwen Storm Overflow1Corwen Wwtw STWMeasure linked
Gwydelwern Storm Overflow1Corwen Wwtw STWMeasure linked
Park Avenue Storm Overflow1Llangollen STWMeasure linked
Paddock Row Ruabon Storm Overflow1Dee STWMeasure linked
South of Hampden Way Wrexham Storm Overflow1Dee STWMeasure linked
Bridge Street Storm Overflow No11Llangollen STWMeasure linked
Llangollen Church Street Storm Overflow1Llangollen STWMeasure linked
Off Llangollen Road Cefn-mawr Storm Overflow1Cefn Mawr STWNo measure
Chapel Lane And Lloyds Lane Chirk Storm Overflow1Dee STWMeasure linked
Trofryn Rhosllanerchrugog Overflow1Dee STWMeasure linked
Chirk Canal Wood Storm Overflow1Dee STWNo measure
Offa Street Chirk Storm Overflow1Dee STWMeasure linked
Chirk Settled Storm Overflow1Dee STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.