What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100118a · 5e8af028 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BALA WWTW | Complete 2025-26 | Bala WwTW Storm Overflow |
| DCWW100143a · 533b288d | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BRYNREFAIL STW | Complete 2025-26 | Cefn Mawr WwTW Storm Overflow |
| DCWW100073a · 020cd1c6 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CARWAY WWTW CARWAY CARMS | Complete 2025-26 | Church Street Llanuwchllyn Storm Overflow |
| DCWW100158a · 78e43437 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CEFN MAWR STW HEOL BERWYN CEFN MAWR | Complete 2025-26 | Cefn Mawr WwTW Storm Overflow |
| DCWW100161a · 453c5d85 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CERRIGYDRUDION STW | Complete 2025-26 | Cerrigydrudion WwTW Storm Overflow |
| DCWW100169a · abf97361 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CORWEN WWTW FINAL EFFLUENT | Complete 2025-26 | Corwen WwTW Storm Overflow |
| DCWW100100a · cad0cc79 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CYNWYD STW FINAL EFFLUENT | Complete 2025-26 | Cynwyd WwTW Storm Overflow |
| DCWW100196a · 32a2fe96 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ DOLYWERN STW | Complete 2025-26 | Dolywern WwTW Storm Overflow |
| DCWW100218a · d953e684 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ GLYNCEIRIOG STW | Complete 2025-26 | Y Gamer Glyn Ceiriog Storm Overflow |
| DCWW100251a · afe1e510 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANDRILLO STW | Complete 2025-26 | Llandrillo Storm Overflow |
| DCWW100273a · 05bdee1a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANGOLLEN WWTW | Complete 2025-26 | Llangollen WwTW Storm Overflow |
| DCWW100088a · d8746a64 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANUWCHLLYN STW LLANUWCHLLYN | Complete 2025-26 | Church Street Llanuwchllyn Storm Overflow |
| DCWW101598a · 97fc167a | W_WFD_PG_IMP4 | Improvement | Implementation of actions to achieve good status at a waterbody and / or site level due to Phosphorus relating to Reasons for Not Achieving Good (RNAGs) identified against water company assets or activities and phosphorus status of the waterbody. WQ CERRIGYDRUDION (SWK) | Due 2026-27 | CERRIGYDRUDION |
| DCWW102138a · f4f2acd9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CHIRK BANK PS | Due 2026-27 | Chirk Bank Storm Overflow |
| DCWW102135a · e83d70f4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DOLYWERN (NR CHIRK) | Due 2026-27 | North West of Bro-Ddewi Dolywern Storm Overflow |
| DCWW102131a · 679a2929 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DOLYWERN (NR CHIRK) STW | Due 2026-27 | Dolywern WwTW Storm Overflow |
| UU100001a · 7f3370d3 | W_EEL_IMP1 | Improvement | Implementation of actions to improve abstractions and outfalls to prevent the entrainment of eels and to address barriers to passage of eels Eel Horseshoe falls abstraction - eel screening | Due 2026-27 | Water body only |
| DCWW102130a · 6b7fd8d3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANGOLLEN STW | Due 2026-27 | Llangollen WwTW Storm Overflow |
| DCWW102134a · 9a07ae24 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANGOLLEN Tannery CSO | Due 2026-27 | Llangollen Queen Street Storm Overflow |
| DCWW102181a · 54bbfd8b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NEW ROAD WREXHAM | Due 2026-27 | New Road Wrexham Storm Overflow |
| DCWW102133a · 4b864e9b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PARK AVENUE CSO | Due 2026-27 | Park Avenue Storm Overflow |
| DCWW102007a · 786a824c | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Afon Eitha CSO | Due 2029-30 | Pont-Yr-Afon Field Storm Overflow |
| DCWW101582a · afe2d289 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BERWYN STREET CSO | Due 2029-30 | Berwyn Street Storm Overflow |
| DCWW101694a · 9253d36a | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ BETWS GWERFIL GOCH STW | Due 2029-30 | Water body only |
| DCWW101701a · e9142b4a | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ BRYNEGLWYS STW | Due 2029-30 | Water body only |
| DCWW101707a · 2e6013a4 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CARROG SEWAGE TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW101707b · a78092df | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ Carrog Wastewater Treatment Works | Due 2029-30 | Water body only |
| DCWW101849a · 8e415b50 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CEFN BRITH STW | Due 2029-30 | Water body only |
| DCWW101418a · 142894c2 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CEFN PS | Due 2029-30 | Cefn Storm Overflow |
| DCWW100660a · 0df80c6a | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ CEFN-MAWR | Due 2029-30 | Cefn Mawr WwTW Storm Overflow |
| DCWW102825a · 89f7491d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CHIRK CHAPEL LANE/LLOYDS LANE CSO | Due 2029-30 | Offa Street Chirk Storm Overflow |
| DCWW102485a · 40e757a3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CHIRK O/S 24 OFFA STREET | Due 2029-30 | Chapel Lane and Lloyds Lane Chirk Storm Overflow |
| DCWW101272a · b0edc539 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CHIRK SEWAGE PUMPING STATION | Due 2029-30 | Offa Street Chirk Storm Overflow |
| DCWW101384a · f476a255 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CHIRK STATION INDUSTRIAL SITE | Due 2029-30 | Offa Street Chirk Storm Overflow |
| DCWW102476a · a485c630 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CHIRK STORM TANKS SCREENED STORM | Due 2029-30 | Offa Street Chirk Storm Overflow |
| DCWW102475a · 99a67feb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CHIRK STORM TANKS SETTLED STORM | Due 2029-30 | Offa Street Chirk Storm Overflow |
| DCWW102845a · ea9a69a3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CORWEN CLAWDD PONCEFN PS | Due 2029-30 | Corwen Clawdd Poncefn Storm Overflow |
| DCWW101426a · 7be50255 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CORWEN CLAWDD PONCEN PS | Due 2029-30 | Corwen Clawdd Poncefn Storm Overflow |
| DCWW101582a · fc6ae0a0 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Corwen Corner Station Yard CSO | Due 2029-30 | Northern Terrace Corwen Storm Overflow |
| DCWW102005a · 75b03124 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Corwen WwTW | Due 2029-30 | Corwen WwTW Storm Overflow |
| DCWW102855b · f8b8559a | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ CORWEN WWTW FINAL EFFLUENT | Due 2029-30 | CORWEN WWTW STW |
| DCWW101720a · ce7ad5ab | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CYNWYD STW | Due 2029-30 | CYNWYD |
| DCWW101720b · 61e1e215 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ CYNWYD STW FINAL EFFLUENT | Due 2029-30 | CYNWYD |
| DCWW101722b · 463138da | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ DOLYWERN STW | Due 2029-30 | Water body only |
| DCWW101725b · ded73650 | W_HR_AMM_T_IMP1 | Improvement | Ammonia reduction to meet numeric permit limit
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ FRONCYSYLLTE STW | Due 2029-30 | CEFN MAWR STW HEOL BERWYN CEFN MAWR STW |
| DCWW100669a · 1cd421fc | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ GLYN CEIRIOG | Due 2029-30 | Y Gamer Glyn Ceiriog Storm Overflow |
| DCWW102006a · 0d8f347b | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ GLYN CEIRIOG Y GAMMER | Due 2029-30 | Y Gamer Glyn Ceiriog Storm Overflow |
| DCWW101728b · e1e52290 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ GLYNCEIRIOG STW | Due 2029-30 | Water body only |
| DCWW101729a · c140ea09 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ GLYNDYFRDWY (NR LLANGOLLEN) STW | Due 2029-30 | Water body only |
| DCWW102847a · 878b3754 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ GWYDDELWERN PS SCREENED STORM | Due 2029-30 | Gwydelwern Storm Overflow |
| DCWW101438a · 5acc931e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ GWYDDELWERN SEWAGE PUMPING STATION | Due 2029-30 | Gwydelwern Storm Overflow |
| DCWW101732a · 0c4dea80 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ HALTON STW | Due 2029-30 | Water body only |
| DCWW101732b · 2135139d | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ HALTON Wastewater Treatment Works | Due 2029-30 | Water body only |
| UU100003a · 0bf058c9 | W_DrWPA_NDIMP1 | Improvement | Implementation of cost effective actions through a catchment scheme to prevent deterioration (or improve following a deterioration) in water quality (ground and surface water) to avoid an increase in the level of water purification treatment. DrWPA Huntington and Sutton Hall (River Dee Turbidity) | Due 2029-30 | Water body only |
| DCWW101737a · 52f5ff08 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. for P and Ammonia WQ LLANDDERFEL SEWAGE TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW102494a · cf16cf16 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANDRILLO (SW OF LLANGOLLEN) SDW PS A | Due 2029-30 | Llandrillo Storm Overflow |
| DCWW101738a · 52d2e4a5 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANDRILLO STW | Due 2029-30 | Water body only |
| DCWW101738b · 69b41165 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ LLANDRILLO STW | Due 2029-30 | Water body only |
| DCWW101853a · 30f5d7e7 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANFIHANGEL GLYN MYFYR STW | Due 2029-30 | Water body only |
| DCWW100674a · dc8fe5c1 | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ LLANGOLLEN | Due 2029-30 | Llangollen WwTW Storm Overflow |
| DCWW101582a · f77e0d13 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llangollen Chruch St CSO | Due 2029-30 | Llangollen Church Street Storm Overflow |
| DCWW101582a · 8113329f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llangollen East St CSO | Due 2029-30 | Llangollen East Street Storm Overflow |
| DCWW101353a · 2793ac16 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANGOLLEN PUMP STATION (STW CSO) | Due 2029-30 | Llangollen WwTW Storm Overflow |
| DCWW101582a · f00e41b1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llangollen Riverside Park Printing Works CSO | Due 2029-30 | Llangollen Riverside Park Storm Overflow |
| DCWW101582a · b300b3e9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llangollen Victoria Prom Riverside CSO | Due 2029-30 | Llangollen Victoria Prom Storm Overflow |
| DCWW100088b · 382985e6 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ LLANUWCHLLYN STW | Due 2029-30 | LLANUWCHLLYN |
| DCWW101855a · d9907862 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLIDIART ANNIE SEWAGE TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW101407a · 921892c0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NEWBRIDGE PS, NR WREXHAM | Due 2029-30 | Next to Bridge Newbridge Overflow |
| DCWW101582a · 94f10607 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Newbridge SPS | Due 2029-30 | Next to Bridge Newbridge Overflow |
| DCWW101741a · b03fecea | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. for P and Ammonia WQ PANDY SEWAGE TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW101408a · fe5f1943 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pen y Cae PS CSO, Afoneitha road, Wrexham LL14 2PF | Due 2029-30 | Penycae Storm Overflow |
| DCWW101857a · 4dd4ca36 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ PENTRELLYNCYMMER STW | Due 2029-30 | Water body only |
| DCWW101582a · 1e37be25 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penycae SPS | Due 2029-30 | Penycae Storm Overflow |
| DCWW101582a · 93d0de00 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penycae West End School Field Land CSO Afon Eitha, Penycae, Pen-y-cae, Wrexham | Due 2029-30 | Penycae Storm Overflow |
| DCWW102842a · 97f8d939 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RHOSLLANERCHRUGOG ABERDERFYN | Due 2029-30 | Trofryn Rhosllanerchrugog Overflow |
| DCWW101582a · d9aed530 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Royal Hotel CSO | Due 2029-30 | Bridge Street Storm Overflow No1 |
| DCWW102827a · 45208273 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ruabon CSO Ruabon New Hall road | Due 2029-30 | Paddock Row Ruabon Storm Overflow |
| DCWW101582a · 9e86b5da | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ruabon Paddock Row CSO | Due 2029-30 | Paddock Row Ruabon Storm Overflow |
| DCWW101415a · cb353726 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RUABON PS | Due 2029-30 | Paddock Row Ruabon Storm Overflow No2 |
| DCWW102008a · a15f2fe7 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Ruabon SPS | Due 2029-30 | Paddock Row Ruabon Storm Overflow No2 |
| DCWW102002a · cc63878f | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ The Eagles CSO, Llanwchllyn | Due 2029-30 | Church Street Llanuwchllyn Storm Overflow |
| DCWW101582a · c3081cd2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WEST STREET CSO Llangollen, Denbighshire | Due 2029-30 | Llangollen West Street Storm Overflow |
| DCWW102813a · 813d15cf | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WREXHAM PLAS MADOC REAR HAMPDEN WAY | Due 2029-30 | South of Hampden Way Wrexham Storm Overflow |
83 of 83 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.