Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The River Tywi is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

37
Above the 2050 cap
of 43 tracked
26
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
6
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Bronwydd Wwtw Storm Overflow
DCWW687
205010 ·22
197
0 events
+1870%19.7×Rising
Llanfynydd Wwtw Storm Overflow
DCWW1539
2050173 ·22
169
0 events
-2%16.9×Falling — behind
Cilycwm Wwtw Storm Overflow
DCWW1007
2050270 ·22
162
0 events
-40%16.2×Falling — behind
Myddfai Storm Overflow
DCWW1177
2050127 ·22
138
0 events
+9%13.8×Rising
Llandovery Wwtw Storm Overflow
DCWW1509
2050136 ·22
134
0 events
-1%13.4×Falling — behind
Brechfa Overflow
DCWW1576
2050102 ·22
133
0 events
+30%13.3×Rising
Manordeilo Overflow
DCWW1661
2050113 ·22
130
0 events
+15%13×Rising
Old Station Road Storm Overflow
DCWW2198
205082 ·22
125
0 events
+52%12.5×Rising
South of Roundabout A40 A485 Storm Overflow
DCWW1571
205080 ·22
111
0 events
+39%11.1×Rising
Cwmduad Wwtw Storm Overflow
DCWW2179
205096 ·22
109
0 events
+14%10.9×Rising
Llandeilo Near A483 Road Bridge Storm Overflow
DCWW567
2050100 ·22
105
0 events
+5%10.5×Rising
Heol Llangynnwr Carmarthen Overflow
DCWW1823
2050101 ·22
105
0 events
+4%10.5×Rising
Pothouse Wharf Storm Overflow
DCWW794
205064 ·22
102
0 events
+59%10.2×Rising
Cynwyl Elfed Wwtw Storm Overflow
DCWW2177
205042 ·22
97
0 events
+131%9.7×Rising
Salem Wwtw Storm Overflow
DCWW1410
2050124 ·22
97
0 events
-22%9.7×Falling — behind
Llanpumpsaint Wwtw Storm Overflow
DCWW1205
2050118 ·22
87
0 events
-26%8.7×Falling — behind
Carmarthen Bridge Storm Overflow
DCWW1752
205061 ·22
86
0 events
+41%8.6×Rising
Llandeilo Yscubor Abad North Storm Overflow
DCWW565
205081 ·22
82
0 events
+1%8.2×Rising
Felingwm Uchaf Wwtw Storm Overflow
DCWW964
2050108 ·22
79
0 events
-27%7.9×Falling — behind
Alltwallis Overflow
DCWW1724
205045 ·22
78
0 events
+73%7.8×Rising
Llangain Storm Overflow
DCWW896
205035 ·22
75
0 events
+114%7.5×Rising
Albion Near Railway Crossing Storm Overflow
DCWW458
205080 ·22
73
0 events
-9%7.3×Falling — behind
Croes Y Ceiliog Overflow
DCWW630
205049 ·22
71
0 events
+45%7.1×Rising
Brynmeillion Storm Overflow
DCWW1885
205042 ·22
65
0 events
+55%6.5×Rising
Carmarthen Sticle Footpath Storm Overflow
DCWW1022
205078 ·22
61
0 events
-22%6.1×Falling — behind
Job's Well Road Storm Overflow
DCWW2229
205064 ·22
61
0 events
-5%6.1×Falling — behind
Talley Wwtw Overflow
DCWW1083
205030 ·22
58
0 events
+93%5.8×Rising
Ferryside Storm Overflow
DCWW2294
205031 ·22
54
0 events
+74%5.4×Rising
Ffarmers Wwtw Overflow
DCWW1298
20505 ·22
54
0 events
+980%5.4×Rising
Caio Wwtw Overflow
DCWW1660
205032 ·22
46
0 events
+44%4.6×Rising
Pontargothi Overflow
DCWW2289
205048 ·22
45
0 events
-6%4.5×Falling — behind
Llandeilo of Station Road Storm Overflow
DCWW566
205041 ·22
44
0 events
+7%4.4×Rising
Rhosmaen Storm Overflow
DCWW492
205040 ·22
37
0 events
-8%3.7×Falling — behind
Abergorlech Storm Overflow
DCWW1892
20501 ·22
34
0 events
+3300%3.4×Rising
Cwmdwyfran Storm Overflow
DCWW410
205023 ·22
29
0 events
+26%2.9×Rising
Pont Cynwyl Storm Overflow
DCWW505
20509 ·22
14
0 events
+56%1.4×Rising
Felinfran Overflow
DCWW394
20502 ·22
12
0 events
+500%1.2×Rising
Pensarn Overflow
DCWW1857
20503 ·23
8
0 events
+167%0.8×Within the cap
Llangain Pwntan Storm Overflow
DCWW897
205020 ·22
6
1 events
-70%0.6×Within the cap
Llansawel No. 2 Storm Overflow
DCWW890
20503 ·22
5
0 events
+67%0.5×Within the cap
Llangadog Off A4069 Storm Overflow
DCWW561
205019 ·22
3
0 events
-84%0.3×Within the cap
Llansawel Wwtw Storm Overflow
DCWW1200
205024 ·22
0
0 events
-100%0×Within the cap
No1 Llansawel Village Storm Overflow
DCWW2090
20500 ·22
0
0 events
—0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →