What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100138a · 1eca6af3 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BRICKYARD LANE | Complete 2025-26 | Brickyard Lane Storm Overflow |
| DCWW100186a · 8a6a03da | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CWM IFOR STW MANORDEI | Complete 2025-26 | Cwm Ifor WwTW Storm Overflow |
| DCWW100191a · 21e935c5 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CYNWYL ELFED | Complete 2025-26 | Cynwyl Elfed WwTW Storm Overflow |
| DCWW100206a · 83b6c15a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ FERRYSIDE STW FERRYSIDE CARMS | Complete 2025-26 | Ferryside Near Railway Track WwTW Storm Overflow |
| DCWW100207a · 1719230a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ FFAIRFACH STW | Complete 2025-26 | Ffairfach WwTW Storm Overflow |
| DCWW100250a · c175ab3b | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANDOVERY WASTEWATER TREATMENT | Complete 2025-26 | Llandovery WwTW Storm Overflow |
| DCWW100086a · a2ac6aa7 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANFYNYDD STW | Complete 2025-26 | Llanfynydd WwTW Storm Overflow |
| DCWW100267a · 9ebfcb7a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANFYRNACH WWTW LLANFYRNACH PEMBS | Complete 2025-26 | Llangadog WwTW Storm Overflow |
| DCWW100268a · 19308174 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANGADOG STW | Complete 2025-26 | Llangadog WwTW Storm Overflow |
| DCWW100284a · aad8d930 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANPUMSAINT | Complete 2025-26 | Llanpumpsaint WwTW Storm Overflow |
| DCWW100289a · eb195964 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANSAINT WWTW LLANSAINT FERRYSIDE | Complete 2025-26 | Llansaint WwTW Storm Overflow |
| DCWW100291a · cd5449fc | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANSTEPHAN STW | Complete 2025-26 | Llansteffan WwTW Overflow |
| DCWW100341a · d6c29e81 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PONT-AR-GOTHI & NANTGAREDIG WWTW | Complete 2025-26 | Pont-ar-gothi & Nantgaredig WwTW Storm Overflow |
| DCWW100353a · 6c91ff1a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PWNTAN LLANGAIN SPS | Complete 2025-26 | Llangain Pwntan Storm Overflow |
| DCWW100140a · e2141f8f | W_U_MON4 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows WQ BRONWYDD (NR CARMARTHEN) STW | Due 2026-27 | Bronwydd WwTW Storm Overflow |
| DCWW100139a · b949e524 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BRONWYDD (NR CARMARTHEN) STW | Due 2026-27 | Bronwydd WwTW Storm Overflow |
| DCWW102193a · 1239caf8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Carmarthen - Towy Works CSO | Due 2026-27 | Carmarthen Bridge Storm Overflow |
| DCWW102192a · 53bdb9cc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARMARTHEN POTHOUSE WHARF PS | Due 2026-27 | Pothouse Wharf Storm Overflow |
| DCWW100685a · f73455ff | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ FFAIRFACH | Due 2027-28 | Ffairfach WwTW Storm Overflow |
| DCWW100647a · 9c050f07 | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ FFAIRFACH | Due 2027-28 | Ffairfach WwTW Storm Overflow |
| DCWW100637a · 9b8fea6a | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ NANTGAREDIG | Due 2027-28 | Pont-ar-gothi & Nantgaredig WwTW Storm Overflow |
| DCWW100925a · 2203c783 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ABERGORLECH PUMPING STATION | Due 2029-30 | Abergorlech Storm Overflow |
| DCWW101820a · 487b7b32 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ ABERGORLECH WASTEWATER TREATMENT WORK | Due 2029-30 | Water body only |
| DCWW100972a · d4e99765 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ABERGWILI PS NEAR RUGBY FIELD | Due 2029-30 | South of Roundabout A40 A485 Storm Overflow |
| DCWW100985a · 56038406 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ALBION P.S. | Due 2029-30 | Albion Near Railway Crossing Storm Overflow |
| DCWW100928a · e0728a6f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ALLTWALIS SPS | Due 2029-30 | Alltwallis Overflow |
| DCWW101056a · d13fada5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ASHFIELD ROW PUMPING STATION, ASHFIELD ROW, LLANGADOG | Due 2029-30 | Ashfield Llangadog Storm Overflow |
| DCWW100920a · 6b391dea | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRECHFA STW | Due 2029-30 | Brechfa Overflow |
| DCWW101814a · d753b132 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ BRECHFA STW | Due 2029-30 | Water body only |
| DCWW102568a · a31b7c42 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Brickyard Lane SPS EO | Due 2029-30 | Brickyard Lane Storm Overflow |
| DCWW101020a · 83493cfe | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRONWYDD SEWAGE TREATMENT WORKS, BRONWYDD, CARMARTHEN | Due 2029-30 | Bronwydd WwTW Storm Overflow |
| DCWW102403a · d9196a5a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRYNMEILLION PS EOF | Due 2029-30 | Brynmeillion Storm Overflow |
| DCWW101084a · a3c25815 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRYNMEILLION SPS, LLANPUMPSAINT | Due 2029-30 | Brynmeillion Storm Overflow |
| DCWW101821a · 8554f6f4 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CAIO STW | Due 2029-30 | Water body only |
| DCWW102663a · 076af2fb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Camarthen Parc Hinds SPS CSO | Due 2029-30 | Old Priory Road Storm Overflow |
| DCWW102529a · b77ac40b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Carmarthen - Jobswell Road | Due 2029-30 | Job's Well Road Storm Overflow |
| DCWW102569a · acf2c9b8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Carmarthen - Old Station Road | Due 2029-30 | Old Station Road Storm Overflow |
| DCWW102556a · ba1fe6a9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Carmarthen - Sticle Path | Due 2029-30 | Carmarthen Sticle Footpath Storm Overflow |
| DCWW101582a · c2429eb4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Carmarthen Market CSO | Due 2029-30 | Pothouse Wharf Storm Overflow |
| DCWW101582a · 4751e7ef | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Carmarthen Near Fire Station CSO | Due 2029-30 | Russell Terrace Storm Overflow |
| DCWW101582a · c18b1893 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Carmarthen Old Llansteffan Rd CSO | Due 2029-30 | Old Llansteffan Road Carmarthen Storm Overflow |
| DCWW101007a · ef6c9402 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Carmarthen Old Llansteffan Road CSO | Due 2029-30 | Old Llansteffan Road Carmarthen Storm Overflow |
| DCWW102247a · 55acf9b4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Carmarthen Pentremeurig Rd | Due 2029-30 | Pentremeurig Road 1 Storm Overflow |
| DCWW101817a · debf8443 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CILYCWM STW | Due 2029-30 | Water body only |
| DCWW102410a · c4dd0f3a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CONWYL ELFED STW | Due 2029-30 | Cynwyl Elfed WwTW Storm Overflow |
| DCWW101812a · 457f436f | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CWM IFOR STW | Due 2029-30 | Water body only |
| DCWW101812b · 4adf44fc | W_HR_AMM_T_IMP1 | Improvement | Ammonia reduction to meet numeric permit limit
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ CWM IFOR STW | Due 2029-30 | Water body only |
| DCWW101452a · d43a76da | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Cwmduad WWTW | Due 2029-30 | Cwmduad WwTW Storm Overflow |
| DCWW102249a · 33081892 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cwmdwyfran SPS EO | Due 2029-30 | Cwmdwyfran Storm Overflow |
| DCWW101815a · 4e30df4b | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CWRT HENRI STW | Due 2029-30 | Water body only |
| DCWW101822a · b8dab3d8 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CYNGHORDY STW | Due 2029-30 | Water body only |
| DCWW101582a · d7cd3dde | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cynwyl Village Bridge | Due 2029-30 | Pont Cynwyl Storm Overflow |
| DCWW100932a · 163f243f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FARMERS STW SPS EO | Due 2029-30 | Ffarmers WwTW Overflow |
| DCWW101026a · b5b0f8c0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FELIN FRAN PUMPING STATIOPN, LLANGADOG, DYFED | Due 2029-30 | Felinfran Overflow |
| DCWW101823a · 29d9cb5c | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ FELINGWM STW | Due 2029-30 | Water body only |
| DCWW101816a · e1bbc6b0 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ FFAIRFACH STW | Due 2029-30 | Water body only |
| DCWW101582a · ef944f41 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Golden Grove WwTW Inlet CSO Llandie | Due 2029-30 | Golden Grove WwTW Storm Overflow |
| DCWW101582a · 0ce2d8f1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Jewsons CSO Tanerdy Carmarthen | Due 2029-30 | Tanerdy Storm Overflow |
| DCWW102376a · 3de4ba89 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llandeilo - Off Station Road | Due 2029-30 | Llandeilo of Station Road Storm Overflow |
| DCWW101472a · e4c12c98 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Llandovery No 1 SPS | Due 2029-30 | Llandovery Storm Overflow |
| DCWW101809a · 3223399a | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANDOVERY WWTW | Due 2029-30 | Water body only |
| DCWW100922a · 30c29b90 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANEGWAD SPS | Due 2029-30 | Water body only |
| DCWW101813a · 14ac664e | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANFYNYDD STW | Due 2029-30 | Water body only |
| DCWW101813b · cbee5b0e | W_HR_AMM_T_IMP1 | Improvement | Ammonia reduction to meet numeric permit limit
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ LLANFYNYDD STW | Due 2029-30 | Water body only |
| DCWW100686a · 7712c21a | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ LLANGADOG | Due 2029-30 | Llangadog WwTW Storm Overflow |
| DCWW100649a · f0688388 | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ LLANGADOG | Due 2029-30 | Llangadog WwTW Storm Overflow |
| DCWW102726a · 8206a63b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llangadog - Off A4069 (Common) | Due 2029-30 | Llangadog Off A4069 Storm Overflow |
| DCWW101807a · 53fe0a70 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANGADOG STW | Due 2029-30 | Water body only |
| DCWW102575a · 17ca25cb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANGAIN PWNTAN PS | Due 2029-30 | Llangain Pwntan Storm Overflow |
| DCWW102524a · f64ecca7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANPUMPSAINT PS | Due 2029-30 | Llanpumpsaint WwTW Storm Overflow |
| DCWW100929a · f9e9b1aa | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANPUMPSAINT PUMPING STATION, LLANPUMSAINT, NR. CARMARTHEN | Due 2029-30 | Llanpumpsaint WwTW Storm Overflow |
| DCWW101011a · 76e1739b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANSADWRN PUMPING STATION | Due 2029-30 | Llansadwrn Storm Overflow |
| DCWW101582a · 3ea8c6b4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANSAWEL . . | Due 2029-30 | No1 Llansawel Village Storm Overflow |
| DCWW102416a · 7df77666 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANSAWEL STW STORM CSO | Due 2029-30 | Llansawel WwTW Storm Overflow |
| DCWW101582a · 3c804b39 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llansawel Village CSO No2 | Due 2029-30 | Llansawel No. 2 Storm Overflow |
| DCWW101819a · 67d0bc4d | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANSAWEL WASTEWATER TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW100896a · dae568fc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANWRDA SPS | Due 2029-30 | Water body only |
| DCWW101125a · e0ea91df | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MEYSYDD Y COLEG SPS, CARMARTHEN, SA31 3GR | Due 2029-30 | Water body only |
| DCWW101582a · e883a93e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Morfa Lane CSO, Carmarthen | Due 2029-30 | Morfa Lane Carmarthen Storm Overflow |
| DCWW100894a · ce25af02 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MORFA LANE, CARMARTHEN | Due 2029-30 | Morfa Lane Carmarthen Storm Overflow |
| DCWW100911a · c228bc65 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MYDDFAI PS, Llandovery , , | Due 2029-30 | Myddfai Storm Overflow |
| DCWW101818a · 30d516d0 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ MYDDFAI STW | Due 2029-30 | Water body only |
| DCWW101582a · bcdc862a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Myddfai Village Sewerage Scheme CSO | Due 2029-30 | Myddfai Storm Overflow |
| DCWW101582a · b322d83b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Old Priory Row CSO Parc Hinds PS C | Due 2029-30 | Parc Hinds Storm Overflow |
| DCWW100915a · 2f3f37dd | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pencoed Farm SPS, at Llangain No 1 Carmarthenshire | Due 2029-30 | Llangain Storm Overflow |
| DCWW101582a · 370df6fc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pencoed Farm SPS, Llangain | Due 2029-30 | Llangain Storm Overflow |
| DCWW101475a · 5065ef91 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENIEL PUMPING STATION, PENIEL, CARMARTHEN, DYFED | Due 2029-30 | Peniel Overflow |
| DCWW101582a · 0d07f995 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pentremeurig Road CSO | Due 2029-30 | Pentremeurig Road 2 Storm Overflow |
| DCWW101582a · f20f1c5b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pont-ar-Gothi & Nantgaredig Wastewater Treatment Works | Due 2029-30 | Pont-ar-gothi & Nantgaredig WwTW Storm Overflow |
| DCWW100921a · 650cef56 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PONTARGOTHI SPS | Due 2029-30 | Pontargothi Overflow |
| DCWW101810a · 3c2a88bd | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ PONTARGOTHI WWTW | Due 2029-30 | Water body only |
| DCWW100895a · b582465f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ POTHOUSE WHARF SPS | Due 2029-30 | Pothouse Wharf Storm Overflow |
| DCWW100955a · a26693de | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PUMPING STATION NO 1, IDOLE CWMFFRWD SEWERAGE SCHEME | Due 2029-30 | Croes Y Ceiliog Overflow |
| DCWW100954a · 5b241dc5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PUMPING STATION NO 5, IDOLE CWMFFRWD SEWERAGE SCHEME | Due 2029-30 | Water body only |
| DCWW100931a · a29c4eb2 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PUMPSAINT STW - EMERGENCY DISCHARGE | Due 2029-30 | Water body only |
| DCWW100986a · 9f3ebc07 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pwntan SPS, Llangain, Carmathenshire | Due 2029-30 | Llangain Pwntan Storm Overflow |
| DCWW101824a · bf06fd01 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. for P and Ammonia WQ RHANDIRMWYN | Due 2029-30 | Water body only |
| DCWW102382a · 574bb11c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RHOSMAEN PS | Due 2029-30 | Rhosmaen Storm Overflow |
| DCWW100699a · 213ed8da | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ SALEM | Due 2029-30 | Salem WwTW Storm Overflow |
| DCWW100654a · a7d24fd4 | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ SALEM | Due 2029-30 | Salem WwTW Storm Overflow |
| DCWW101811a · 1736229d | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ SALEM STW | Due 2029-30 | Water body only |
| DCWW101961a · 9740d41a | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Salem WwTW | Due 2029-30 | Salem WwTW Storm Overflow |
| DCWW100893a · c43ad8a8 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SSO at BRICKYARD LANE PUMPING STATION, BRICKYARD LANE, CARMARTHEN | Due 2029-30 | Water body only |
| DCWW101582a · 4dc01f6b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Storm Overflow at Bronwydd Wastewater Treatment Works | Due 2029-30 | Bronwydd WwTW Storm Overflow |
| DCWW101096a · 1b1d85b6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TALLEY STW INLET SPS | Due 2029-30 | Talley WwTW Overflow |
| DCWW101808a · 4575a5e1 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ TALLEY WWTW | Due 2029-30 | Water body only |
| DCWW100914a · 3711e8a8 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TREVAUGHAN SWO | Due 2029-30 | Russell Terrace Storm Overflow |
107 of 107 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.