Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Wiveliscombe Styles Storm Tank WXW01274 | 2050 | 132 ·24 | 75 129 events | -43% | 7.5× | Falling — behind | |
| West Bagborough Inlet WXW01215 | 2050 | 122 ·24 | 64 61 events | -48% | 6.4× | Falling — behind | |
| Bradford on Tone Hockholler A38 WXW00550 | 2050 | 102 ·24 | 63 0 events | -38% | 6.3× | Falling — behind | |
| Bradford on Tone Inlet WXW00164 | 2050 | 105 ·24 | 53 151 events | -50% | 5.3× | Falling — behind | |
| Wiveliscombe Styles Inlet WXW01273 | 2050 | 62 ·24 | 50 64 events | -19% | 5× | Falling — behind | |
| Milverton Storm Tank WXW00742 | 2050 | 97 ·24 | 35 49 events | -64% | 3.5× | Falling — behind | |
| Taunton Priory Storm Tanks Storm Tanks WXW00892 | 2050 | 59 ·24 | 33 40 events | -44% | 3.3× | Falling — behind | |
| Wellington Tone Storm Tank WXW01204 | 2050 | 43 ·24 | 31 34 events | -28% | 3.1× | Falling — behind | |
| Sandhill Park Storm Tank WXW00960 | 2050 | 51 ·24 | 27 102 events | -47% | 2.7× | Falling — behind | |
| Norton Fitzwarren Langford Lane WXW00615 | 2050 | 62 ·24 | 23 30 events | -63% | 2.3× | Falling — behind | |
| Wiveliscombe Hillsmoor Storm Tank WXW00542 | 2050 | 34 ·24 | 21 28 events | -38% | 2.1× | Falling — behind | |
| Bathpool Hyde Lane WXW00573 | 2050 | 46 ·24 | 19 44 events | -59% | 1.9× | Falling — behind | |
| Taunton Priory Storm TanksCSO WXW00891 | 2050 | 38 ·24 | 19 16 events | -50% | 1.9× | Falling — behind | |
| Taunton Goosenford WXW00073 | 2050 | 17 ·24 | 17 11 events | 0% | 1.7× | Falling — behind | |
| Wellington Mitchells Pool WXW00746 | 2050 | 30 ·24 | 16 36 events | -47% | 1.6× | Falling — behind | |
| Halse Inlet WXW00493 | 2050 | 24 ·24 | 15 12 events | -38% | 1.5× | Nearly there | |
| Henlade WXW00523 | 2050 | 34 ·24 | 14 16 events | -59% | 1.4× | Nearly there | |
| Bishops Lydeard Storm Tank WXW00137 | 2050 | 17 ·24 | 13 12 events | -24% | 1.3× | Nearly there | |
| Bradford on Tone Tone Green WXW01144 | 2050 | 17 ·24 | 12 6 events | -29% | 1.2× | Nearly there | |
| Taunton Mountway Bishops Hull WXW00761 | 2050 | 15 ·24 | 11 0 events | -27% | 1.1× | Nearly there | |
| West Buckland WXW01220 | 2050 | 18 ·24 | 9 10 events | -50% | 0.9× | Within the cap | |
| Wiveliscombe Hillsmoor Inlet WXW00541 | 2050 | 8 ·24 | 9 4 events | +13% | 0.9× | Within the cap | |
| Cheddon Fitzpaine Maidenbrook Lane WXW00675 | 2050 | 36 ·24 | 8 19 events | -78% | 0.8× | Within the cap | |
| Taunton Mill Lane Corfe No 2 WXW00734 | 2050 | 10 ·24 | 7 6 events | -30% | 0.7× | Within the cap | |
| Nailsbourne WXW00778 | 2050 | 18 ·24 | 6 2 events | -67% | 0.6× | Within the cap | |
| Milverton Houndsmoor Lane WXW00564 | 2050 | 10 ·24 | 6 1 events | -40% | 0.6× | Within the cap | |
| Hillcommon Hill Common WXW00539 | 2050 | 9 ·24 | 5 4 events | -44% | 0.5× | Within the cap | |
| Wellington Westford WXW01236 | 2050 | 3 ·24 | 3 3 events | 0% | 0.3× | Within the cap | |
| Combe Florey Storm Tank WXW00313 | 2050 | 60 ·24 | 3 2 events | -95% | 0.3× | Within the cap | |
| Trull Eastbrook Road WXW01106 | 2050 | 15 ·24 | 2 2 events | -87% | 0.2× | Within the cap | |
| Wellington Relyon Factory Entrance WXW01054 | 2050 | 2 ·24 | 2 0 events | 0% | 0.2× | Within the cap | |
| Taunton Stoke Road O/s 15 WXW01070 | 2050 | 5 ·24 | 2 0 events | -60% | 0.2× | Within the cap | |
| Wsx10095 WSX10095 | 2050 | 1 ·25 | 1 2 events | 0% | 0.1× | — | Within the cap |
| Bishops Hull Shutemead WXW00014 | 2050 | 2 ·24 | 1 1 events | -50% | 0.1× | Within the cap | |
| Wsx10041 WSX10041 | 2050 | 1 ·25 | 1 1 events | 0% | 0.1× | — | Within the cap |
| Creech St Michael North End WXW00802 | 2050 | 3 ·24 | 1 1 events | -67% | 0.1× | Within the cap | |
| Taunton Market WXW01104 | 2050 | 34 ·24 | 1 1 events | -97% | 0.1× | Within the cap | |
| Ruishton Barton Lane WXW00106 | 2050 | 3 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Bishops Lydeard Church Street WXW00288 | 2050 | 3 ·24 | 0 0 events | -100% | 0× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →