What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08WW100638 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Bishops Lydeard WRC Flow Monitoring | Due 2026-27 | Back Stream |
| 08WW100411 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Bishops Lydeard WRC Overflow Monitoring | Due 2026-27 | Back Stream |
| 08WW100645 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Bradford On Tone WRC Flow Monitoring | Due 2026-27 | Tone - Wellington to Taunton |
| 08WW100418 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Bradford On Tone WRC Overflow Monitoring | Due 2026-27 | Tone - Wellington to Taunton |
| 08WW100880 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) COMBE FLOREY WRC flow monitoring | Due 2026-27 | Back Stream |
| 08WW100858 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) COMBE FLOREY WRC overflow monitoring | Due 2026-27 | Back Stream |
| 08WW100882 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) HALSE WRC flow monitoring | Due 2026-27 | Halse WTR |
| 08WW100860 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) HALSE WRC overflow monitoring | Due 2026-27 | Halse WTR |
| 08WW100757 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Milverton WRC Flow Monitoring | Due 2026-27 | Hillfarrance Bk |
| 08WW100529 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Milverton WRC Overflow Monitoring | Due 2026-27 | Hillfarrance Bk |
| 08WW100785 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Sandhill Park WRC Flow Monitoring | Due 2026-27 | Halse WTR |
| 08WW100558 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Sandhill Park WRC Overflow Monitoring | Due 2026-27 | Halse WTR |
| 08WW100826 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Wellington WRC Flow Monitoring | Due 2026-27 | Tone - Wellington to Taunton |
| 08WW100600 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Wellington WRC Overflow Monitoring | Due 2026-27 | Tone - Wellington to Taunton |
| 08WW100894 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) WEST BAGBOROUGH WRC flow monitoring | Due 2026-27 | Back Stream |
| 08WW100872 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) WEST BAGBOROUGH WRC overflow monitoring | Due 2026-27 | Back Stream |
| 08WW100841 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Wiveliscombe (Hillsmoor) WRC Flow Monitoring | Due 2026-27 | Hillfarrance Bk |
| 08WW100615 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Wiveliscombe (Hillsmoor) WRC Overflow Monitoring | Due 2026-27 | Hillfarrance Bk |
| 08WW100842 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Wiveliscombe (Styles) WRC Flow Monitoring | Due 2026-27 | Hillfarrance Bk |
| 08WW100616 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Wiveliscombe (Styles) WRC Overflow Monitoring | Due 2026-27 | Hillfarrance Bk |
| 08WW101000 · em | EnvAct_INV4 | Investigation | Storm overflows - Investigations BRADFORD ON TONE WWTW SO Investigation (13032C) | Due 2027-28 | Tone - Wellington to Taunton |
| 08WW101000 · rn | EnvAct_INV4 | Investigation | Storm overflows - Investigations CREECH ST MICHAEL, NORTH END (Site ID 15454B) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · mz | EnvAct_INV4 | Investigation | Storm overflows - Investigations HOCKHOLLER PUMPING STATION | Due 2027-28 | Haywards Water |
| 08WW101000 · ea | EnvAct_INV4 | Investigation | Storm overflows - Investigations HYDE LANE PUMPING STATION SO Investigation (15435B) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · ne | EnvAct_INV4 | Investigation | Storm overflows - Investigations LANGFORD LANE PUMPING STATION | Due 2027-28 | Back Stream |
| 08WW101000 · nk | EnvAct_INV4 | Investigation | Storm overflows - Investigations MILVERTON WWTW | Due 2027-28 | Hillfarrance Bk |
| 08WW101000 · ip | EnvAct_INV4 | Investigation | Storm overflows - Investigations PRIORY STORM TANKS SO Investigation (14389C) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · eb | EnvAct_INV4 | Investigation | Storm overflows - Investigations PRIORY STORM TANKS SO Investigation (14389S) | Due 2027-28 | Tone Ds Taunton |
| 08WW100005 · a | NERC_INV | Investigation | Walkover and electric fishing surveys to determine biodiversity, abundance and location of spawning reaches and nursery habitat in feeder streams and identify potential barriers to fish movement. Undertake options appraisal (where appropriate) to address barriers. Reservoir Feeder Streams Fish Investigation and Options Appraisal | Due 2027-28 | Tone - Upper |
| 08WW101000 · rh | EnvAct_INV4 | Investigation | Storm overflows - Investigations RUISHTON, BARTON LANE (Site ID 15436B) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · di | EnvAct_INV4 | Investigation | Storm overflows - Investigations TAUNTON TRULL EAST BROOK CSO SO Investigation (16730C) | Due 2027-28 | Sherford Stream |
| 08WW101000 · ro | EnvAct_INV4 | Investigation | Storm overflows - Investigations TAUNTON, BRIDGWATER ROAD O/S (Site ID 17318C) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · rb | EnvAct_INV4 | Investigation | Storm overflows - Investigations TAUNTON, LONGACRE CLOSE (Site ID 15448B) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · rr | EnvAct_INV4 | Investigation | Storm overflows - Investigations TAUNTON, MAIDENBROOK (Site ID 14632B) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · rl | EnvAct_INV4 | Investigation | Storm overflows - Investigations TAUNTON, MARKET (Site ID 17338C) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · rj | EnvAct_INV4 | Investigation | Storm overflows - Investigations TAUNTON, MOUNTWAY BISHOPS HULL (Site ID 15447C) | Due 2027-28 | Tone Ds Taunton |
| 08WW101000 · ra | EnvAct_INV4 | Investigation | Storm overflows - Investigations TAUNTON, NEW BARN QUEENSWAY (Site ID 15443C) | Due 2027-28 | Sherford Stream |
| 08WW101000 · rw | EnvAct_INV4 | Investigation | Storm overflows - Investigations TAUNTON, WILTON ORCHARD CAR PARK (Site ID 17370C) | Due 2027-28 | Sherford Stream |
| 08WW101000 · eg | EnvAct_INV4 | Investigation | Storm overflows - Investigations WELLINGTON WWTW SO Investigation (13330S) | Due 2027-28 | Tone - Wellington to Taunton |
| 08WW100063 · a | NERC_IMP | Improvement | Implement recommendations from AMP7 catchment biodiversity investigations AMP8 Catchment Biodiversity Delivery River Tone | Due 2029-30 | Tone - Upper |
| 08WW102077 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Bishops Lydeard WRC - Phosphorus Removal | Due 2029-30 | Back Stream |
| 08WW101002 · cy | EnvAct_IMP2 | Improvement | EnvAct_IMP4cy. Storm overflows - Frequency improvements BRADFORD ON TONE WWTW SO improvement (13032C) | Due 2029-30 | Tone - Wellington to Taunton |
| 08WW103025 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Bradford-on-Tone WRC - Phosphorus Removal | Due 2029-30 | Tone - Wellington to Taunton |
| 08WW101002 · cm | EnvAct_IMP4 | Improvement | EnvAct_IMP4cm. Storm overflows - Frequency improvements HYDE LANE PUMPING STATION SO improvement (15435B) | Due 2029-30 | Tone Ds Taunton |
| 08WW101002 · bu | EnvAct_IMP4 | Improvement | EnvAct_IMP4bu. Storm overflows - Frequency improvements TAUNTON TRULL EAST BROOK CSO SO improvement (16730C) | Due 2029-30 | Sherford Stream |
| 08WW102096 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Taunton WRC - Phosphorus Removal | Due 2029-30 | Tone Ds Taunton |
| 08WW102098 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Wellington WRC - Phosphorus Removal | Due 2029-30 | Tone - Wellington to Taunton |
| 08WW101002 · cs | EnvAct_IMP4 | Improvement | EnvAct_IMP4cs. Storm overflows - Frequency improvements WELLINGTON WWTW SO improvement (13330S) | Due 2029-30 | Tone - Wellington to Taunton |
| 08WW102223 · a | U_IMP1 | Improvement | Monitoring at Stoke St Gregory WRC - The site discharges to a non-sensitive area and is forecast to exceed 2,000pe by 2030, thus requiring monitoring under the UWWTR. Stoke St Gregory WRC - UWWTR Monitoring | Due 2030-31 | Tone Ds Taunton |
49 of 49 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.