Before the works
An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.
If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.
When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.
| Overflow | Events | Its works | On record |
|---|---|---|---|
| Trerhyngyll Overflow | 1 | Cowbridge STW | Measure linked |
| Wenvoe Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Sully Moors Road Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Cwm Barry Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Harbour Road Barry Town Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Llantwit Major Beach Road Storm Overflow | 1 | Llantwit Major | Measure linked |
| Countess Place Penarth Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Nant Talwg Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Torbay Terrace Junction Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Hillary Rise Rear Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Millfield Drive Storm Overflow | 1 | Cowbridge STW | Measure linked |
| Cornerswell Road Penarth Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | No measure |
| B4265 Storm Overflow | 1 | West Aberthaw Outfall | Measure linked |
| Rock Road Storm Overflow | 1 | West Aberthaw Outfall | Measure linked |
| Rhoose Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
| Craig Penllyne Storm Overflow | 1 | Cowbridge STW | Measure linked |
| Brockhill Rise Storm Overflow | 1 | Cardiff (west) And Barry (cog Moors) | Measure linked |
What this needs to be reliable
The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.