A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

65
Measures in this catchment
NEP, current record
60
Still active
not yet past their date
5
Assumed complete
completion date has passed
3
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100135a · 442d6a6dW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BONVILSTON WEST STW
Complete 2025-26Bonvilston West WwTW Overflow
DCWW100167a · 8018e1d5W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
COG MOORS STW CDIFF RD DINAS POWYS
Complete 2025-26Cowbridge Llanbethian WwTW Storm Overflow
DCWW100172a · 9d80213dW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
COWBRIDGE STW COWBRIDGE VALE OF GLA
Complete 2025-26Cowbridge Llanbethian WwTW Storm Overflow
DCWW100292a · 12d53ac6W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANTWIT MAJOR WWTW (STW) WICK ROAD
Complete 2025-26Llantwit Major Beach Road Settled Storm Overflow
DCWW100407a · b7597fdeW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
WEST ABERTHAW OUTFALL
Complete 2025-26West Aberthaw WwTW Storm Overflow
DCWW102636a · 7de7f117W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BARRY COLDBROOK ROAD EAST
Due 2026-27Coldbrook Road East 2 Storm Overflow
DCWW100145a · 786ae81aW_U_MON4Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows
WQ
BRYNSIENCYN (ANGLESEY)
Due 2026-27Cowbridge Llanbethian WwTW Storm Overflow
DCWW101623a · 2946bbb2W_WFD_PG_IMP3Improvement
Implementation of actions to achieve Good status at a waterbody and / or site level due to BOD (as DO) and / or ammonia relating to Reasons for Not Achieving Good (RNAGs) recommendations identified against water company assets or activities
WQ
Llancarfan
Due 2026-27Water body only
DCWW102188a · 23ea1be7W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Penarth Head SPS CSO
Due 2026-27Countess Place Penarth Overflow
DCWW102628a · 21e30c8eW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
REAR OF HILLARY RISE CSO, BARRY
Due 2026-27Hillary Rise Rear Storm Overflow
DCWW101612a · 195947bdW_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper
WQ
BONVILSTON WEST (7CDC1091)
Due 2027-28BONVILSTON (WEST)
DCWW101582a · a787f642W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
2 Maple Road CSO Penarth
Due 2029-30Maple Road Storm Overflow
DCWW100807a · 61a9f36fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
A SEWAGE PUMPING STATION LOCATED IN A FIELD ADJACENT TO OLD COGAN HALL FARM, PENARTH
Due 2029-30Stonylands Storm Overflow
DCWW100857a · 9f269fa3W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Aberthaw WwTW SPS CF62 4JA
Due 2029-30West Aberthaw WwTW Storm Overflow
DCWW100798a · bd5f8b45W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Atlantic Trading Estate SPS, Barry S Glam
Due 2029-30Atlantic Trading Estate Storm Overflow
DCWW102283a · 2216f7b8W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BARRY DOCKS STORM PS
Due 2029-30Barry Docks Pumped Storm Overflow
DCWW100737a · 55774a40W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Barry Island SPS
Due 2029-30Paget Road Barry Storm Overflow
DCWW100736a · d0da1159W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Barry Town SPS
Due 2029-30Harbour Road Barry Town Storm Overflow
DCWW101582a · 331b020fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BARRY TWN PS LSO ISLAND CAR PARK
Due 2029-30Barry Lakeside Overflow
DCWW100799a · ddbd3f13W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Brockhill Rise and Lavernock Road CSO, Penarth
Due 2029-30Brockhill Rise Storm Overflow
DCWW102268a · 04e2b52bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CASTLETON WOOD CSO, BARRY
Due 2029-30Rock Road Storm Overflow
DCWW102699a · 5094db83W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CLAUDE ROAD WEST/SEVEN AVENUE BARRY
Due 2029-30Junction of Claude Road West and Severn Avenue Barry Storm Overflow
DCWW102323a · fb128893W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
COG MOORS (DINAS POWYS) STW
Due 2029-30Water body only
DCWW100812a · 9f737c31W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
COG MOORS SEWAGE TREATMENT WORKS, CARDIFF ROAD, DINAS POWYS, VALE OF GLAMORGAN CF64 4TR
Due 2029-30Water body only
DCWW100797a · 2d53038fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Cosmeston Park PS, Penarth
Due 2029-30Water body only
DCWW101929a · cb862d50W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
COWBRIDGE LLANBLETHIAN STW STORM TANKS
Due 2029-30Cowbridge Llanbethian WwTW Storm Overflow
DCWW101582a · e9219f20W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Cowbridge STW Cowbridge Vale Of Glam
Due 2029-30Cowbridge Llanbethian WwTW Storm Overflow
DCWW100864a · e87cea4bW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CSO & EO at Weycock Cross SPS
Due 2029-30Weycock Cross Storm Overflow
DCWW100753a · f4ebe355W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CSO and EO at Penarth Stonylands Pumping Station
Due 2029-30Stonylands Storm Overflow
DCWW101582a · 25b8a29cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO and EO at Penarth Stonylands Pumping Station, Penarth
Due 2029-30Stonylands Storm Overflow
DCWW100709a · 78fd1eb1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CWM BARRY SPS, PORTHKERRY COUNTRY PARK, BARRY
Due 2029-30Cwm Barry Storm Overflow
DCWW101582a · 83785eacW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Dyfrig Street CSO
Due 2029-30Dyfrig Street Storm Overflow
DCWW102267a · 6a220bbeW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
EAST ORCHARD CASTLE CSO
Due 2029-30B4265 Storm Overflow
DCWW100714a · 4d23df1fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FONMON PARK SPS, FONTYGARY, BARY
Due 2029-30Fontygary Fonmon Park Road Storm Overflow
DCWW100856a · 20ed4af6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
GRAIG PENLLYN SPS
Due 2029-30Craig Penllyne Storm Overflow
DCWW101582a · 0f6dabeaW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Graig Penllyne SPS
Due 2029-30Craig Penllyne Storm Overflow
DCWW100738a · 1b6c8561W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
KNAP SEWAGE PUMPING STATION, BARRY
Due 2029-30Barry Lakeside Overflow
DCWW101582a · d144e7a1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llanharry SPS
Due 2029-30Llanharry Storm Overflow
DCWW100751a · 80c71764W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Llanharry SPS, Pontyclun, RCT
Due 2029-30Llanharry Storm Overflow
DCWW102396a · 07c8623dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANTWIT MAJOR PS EOF
Due 2029-30Llantwit Major Beach Road Settled Storm Overflow
DCWW101063a · 820f32f4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANTWIT MAJOR SEWAGE PUMPING STATION, BEACH ROAD,LLANTWIT MAJOR
Due 2029-30Llantwit Major Beach Road Storm Overflow
DCWW102397a · 035925e9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llantwit Major SPS Storm Overflow
Due 2029-30Llantwit Major Beach Road Storm Overflow
DCWW100715a · 239596bfW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MILLFIELD DRIVE COWBRIDGE P.S.-
Due 2029-30Millfield Drive Storm Overflow
DCWW100706a · e970adf5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NANT TALWG SPS BARRY
Due 2029-30Nant Talwg Storm Overflow
DCWW100710a · 7f186d52W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NANT TALWG WAY SPS BARRY
Due 2029-30Nant Talwg Way Storm Overflow
DCWW100716a · 19799be0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Penarth Dock PS Penarth
Due 2029-30Countess Place Penarth Overflow
DCWW102319a · 21761809W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Penarth Marina SPS CSO adj. Custom House
Due 2029-30Countess Place Penarth Overflow
DCWW102693a · ceed949aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PORTHKERRY (NR BARRY) PS
Due 2029-30Porthkerry Storm Overflow
DCWW100777a · bceb19ffW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PORTHKERRY SPS, PORTHKERRY BARRY
Due 2029-30Porthkerry Storm Overflow
DCWW102676a · 523af951W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
RHOOSE FONTYGARY FONMON PARK ROAD PS
Due 2029-30Fontygary Fonmon Park Road Storm Overflow
DCWW100818a · 588226a7W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Rhoose Point SPS, Bryn-y-Gloyn, Rhoose Point, Vale of Glam, CF62 3LD
Due 2029-30Rhoose Storm Overflow
DCWW101582a · 62b8842eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Rhoose SPS
Due 2029-30Rhoose Storm Overflow
DCWW100776a · 6bf08bd1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
RHOOSE SPS, RHOOSE, BARRY
Due 2029-30Rhoose Storm Overflow
DCWW101582a · 6bcc1a52W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SPS Millfield Drive Cowbridge
Due 2029-30Millfield Drive Storm Overflow
DCWW100851a · 1a2f4a6eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ST ATHAN PARK SEWAGE PUMPING STATION
Due 2029-30Water body only
DCWW101582a · da595dfdW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Station Rd CSO, Rhoose
Due 2029-30Torbay Terrace Junction Storm Overflow
DCWW100768a · 919f3289W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
SULLY MOORS SEWAGE PUMPING STATION
Due 2029-30Sully Moors Road Storm Overflow
DCWW102682a · ce6b4906W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
THE KNAP PROMENADE, BARRY
Due 2029-30Barry Lakeside Overflow
DCWW101582a · 80223c2dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Tredogan SPS
Due 2029-30Tredogan Storm Overflow
DCWW100774a · ed885986W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
TREDOGAN SPS, TREDOGAN, BARRY
Due 2029-30Tredogan Storm Overflow
DCWW100784a · 5ade548dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
TRERHYNGYLL PUMPING STATION, TRERHYNGYLL, NR COWBRIDGE, S. GLAMORGAN
Due 2029-30Trerhyngyll Overflow
DCWW100754a · a324f4feW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
WENVOE PUMPING STATION, STATION ROAD EAST, BARRY
Due 2029-30Wenvoe Overflow
DCWW102297a · cd66eca4W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
WENVOE SPS EO
Due 2029-30Wenvoe Overflow
DCWW101582a · 78e0c406W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
West Aberthaw WWTW W Aberthaw Barry
Due 2029-30West Aberthaw WwTW Storm Overflow
DCWW100752a · 0b872139W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
WESTWOOD RISE SPS, BARRY
Due 2029-30Westward Rise Storm Overflow

65 of 65 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.