What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100135a · 442d6a6d | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BONVILSTON WEST STW | Complete 2025-26 | Bonvilston West WwTW Overflow |
| DCWW100167a · 8018e1d5 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ COG MOORS STW CDIFF RD DINAS POWYS | Complete 2025-26 | Cowbridge Llanbethian WwTW Storm Overflow |
| DCWW100172a · 9d80213d | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ COWBRIDGE STW COWBRIDGE VALE OF GLA | Complete 2025-26 | Cowbridge Llanbethian WwTW Storm Overflow |
| DCWW100292a · 12d53ac6 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANTWIT MAJOR WWTW (STW) WICK ROAD | Complete 2025-26 | Llantwit Major Beach Road Settled Storm Overflow |
| DCWW100407a · b7597fde | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ WEST ABERTHAW OUTFALL | Complete 2025-26 | West Aberthaw WwTW Storm Overflow |
| DCWW102636a · 7de7f117 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BARRY COLDBROOK ROAD EAST | Due 2026-27 | Coldbrook Road East 2 Storm Overflow |
| DCWW100145a · 786ae81a | W_U_MON4 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows WQ BRYNSIENCYN (ANGLESEY) | Due 2026-27 | Cowbridge Llanbethian WwTW Storm Overflow |
| DCWW101623a · 2946bbb2 | W_WFD_PG_IMP3 | Improvement | Implementation of actions to achieve Good status at a waterbody and / or site level due to BOD (as DO) and / or ammonia relating to Reasons for Not Achieving Good (RNAGs) recommendations identified against water company assets or activities WQ Llancarfan | Due 2026-27 | Water body only |
| DCWW102188a · 23ea1be7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penarth Head SPS CSO | Due 2026-27 | Countess Place Penarth Overflow |
| DCWW102628a · 21e30c8e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ REAR OF HILLARY RISE CSO, BARRY | Due 2026-27 | Hillary Rise Rear Storm Overflow |
| DCWW101612a · 195947bd | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ BONVILSTON WEST (7CDC1091) | Due 2027-28 | BONVILSTON (WEST) |
| DCWW101582a · a787f642 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ 2 Maple Road CSO Penarth | Due 2029-30 | Maple Road Storm Overflow |
| DCWW100807a · 61a9f36f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ A SEWAGE PUMPING STATION LOCATED IN A FIELD ADJACENT TO OLD COGAN HALL FARM, PENARTH | Due 2029-30 | Stonylands Storm Overflow |
| DCWW100857a · 9f269fa3 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Aberthaw WwTW SPS CF62 4JA | Due 2029-30 | West Aberthaw WwTW Storm Overflow |
| DCWW100798a · bd5f8b45 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Atlantic Trading Estate SPS, Barry S Glam | Due 2029-30 | Atlantic Trading Estate Storm Overflow |
| DCWW102283a · 2216f7b8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BARRY DOCKS STORM PS | Due 2029-30 | Barry Docks Pumped Storm Overflow |
| DCWW100737a · 55774a40 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Barry Island SPS | Due 2029-30 | Paget Road Barry Storm Overflow |
| DCWW100736a · d0da1159 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Barry Town SPS | Due 2029-30 | Harbour Road Barry Town Storm Overflow |
| DCWW101582a · 331b020f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BARRY TWN PS LSO ISLAND CAR PARK | Due 2029-30 | Barry Lakeside Overflow |
| DCWW100799a · ddbd3f13 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Brockhill Rise and Lavernock Road CSO, Penarth | Due 2029-30 | Brockhill Rise Storm Overflow |
| DCWW102268a · 04e2b52b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CASTLETON WOOD CSO, BARRY | Due 2029-30 | Rock Road Storm Overflow |
| DCWW102699a · 5094db83 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CLAUDE ROAD WEST/SEVEN AVENUE BARRY | Due 2029-30 | Junction of Claude Road West and Severn Avenue Barry Storm Overflow |
| DCWW102323a · fb128893 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ COG MOORS (DINAS POWYS) STW | Due 2029-30 | Water body only |
| DCWW100812a · 9f737c31 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COG MOORS SEWAGE TREATMENT WORKS, CARDIFF ROAD, DINAS POWYS, VALE OF GLAMORGAN CF64 4TR | Due 2029-30 | Water body only |
| DCWW100797a · 2d53038f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Cosmeston Park PS, Penarth | Due 2029-30 | Water body only |
| DCWW101929a · cb862d50 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ COWBRIDGE LLANBLETHIAN STW STORM TANKS | Due 2029-30 | Cowbridge Llanbethian WwTW Storm Overflow |
| DCWW101582a · e9219f20 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cowbridge STW Cowbridge Vale Of Glam | Due 2029-30 | Cowbridge Llanbethian WwTW Storm Overflow |
| DCWW100864a · e87cea4b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CSO & EO at Weycock Cross SPS | Due 2029-30 | Weycock Cross Storm Overflow |
| DCWW100753a · f4ebe355 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CSO and EO at Penarth Stonylands Pumping Station | Due 2029-30 | Stonylands Storm Overflow |
| DCWW101582a · 25b8a29c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO and EO at Penarth Stonylands Pumping Station, Penarth | Due 2029-30 | Stonylands Storm Overflow |
| DCWW100709a · 78fd1eb1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CWM BARRY SPS, PORTHKERRY COUNTRY PARK, BARRY | Due 2029-30 | Cwm Barry Storm Overflow |
| DCWW101582a · 83785eac | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Dyfrig Street CSO | Due 2029-30 | Dyfrig Street Storm Overflow |
| DCWW102267a · 6a220bbe | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ EAST ORCHARD CASTLE CSO | Due 2029-30 | B4265 Storm Overflow |
| DCWW100714a · 4d23df1f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FONMON PARK SPS, FONTYGARY, BARY | Due 2029-30 | Fontygary Fonmon Park Road Storm Overflow |
| DCWW100856a · 20ed4af6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ GRAIG PENLLYN SPS | Due 2029-30 | Craig Penllyne Storm Overflow |
| DCWW101582a · 0f6dabea | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Graig Penllyne SPS | Due 2029-30 | Craig Penllyne Storm Overflow |
| DCWW100738a · 1b6c8561 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ KNAP SEWAGE PUMPING STATION, BARRY | Due 2029-30 | Barry Lakeside Overflow |
| DCWW101582a · d144e7a1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llanharry SPS | Due 2029-30 | Llanharry Storm Overflow |
| DCWW100751a · 80c71764 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Llanharry SPS, Pontyclun, RCT | Due 2029-30 | Llanharry Storm Overflow |
| DCWW102396a · 07c8623d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANTWIT MAJOR PS EOF | Due 2029-30 | Llantwit Major Beach Road Settled Storm Overflow |
| DCWW101063a · 820f32f4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANTWIT MAJOR SEWAGE PUMPING STATION, BEACH ROAD,LLANTWIT MAJOR | Due 2029-30 | Llantwit Major Beach Road Storm Overflow |
| DCWW102397a · 035925e9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llantwit Major SPS Storm Overflow | Due 2029-30 | Llantwit Major Beach Road Storm Overflow |
| DCWW100715a · 239596bf | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MILLFIELD DRIVE COWBRIDGE P.S.- | Due 2029-30 | Millfield Drive Storm Overflow |
| DCWW100706a · e970adf5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NANT TALWG SPS BARRY | Due 2029-30 | Nant Talwg Storm Overflow |
| DCWW100710a · 7f186d52 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NANT TALWG WAY SPS BARRY | Due 2029-30 | Nant Talwg Way Storm Overflow |
| DCWW100716a · 19799be0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Penarth Dock PS Penarth | Due 2029-30 | Countess Place Penarth Overflow |
| DCWW102319a · 21761809 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penarth Marina SPS CSO adj. Custom House | Due 2029-30 | Countess Place Penarth Overflow |
| DCWW102693a · ceed949a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PORTHKERRY (NR BARRY) PS | Due 2029-30 | Porthkerry Storm Overflow |
| DCWW100777a · bceb19ff | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PORTHKERRY SPS, PORTHKERRY BARRY | Due 2029-30 | Porthkerry Storm Overflow |
| DCWW102676a · 523af951 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RHOOSE FONTYGARY FONMON PARK ROAD PS | Due 2029-30 | Fontygary Fonmon Park Road Storm Overflow |
| DCWW100818a · 588226a7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Rhoose Point SPS, Bryn-y-Gloyn, Rhoose Point, Vale of Glam, CF62 3LD | Due 2029-30 | Rhoose Storm Overflow |
| DCWW101582a · 62b8842e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rhoose SPS | Due 2029-30 | Rhoose Storm Overflow |
| DCWW100776a · 6bf08bd1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RHOOSE SPS, RHOOSE, BARRY | Due 2029-30 | Rhoose Storm Overflow |
| DCWW101582a · 6bcc1a52 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SPS Millfield Drive Cowbridge | Due 2029-30 | Millfield Drive Storm Overflow |
| DCWW100851a · 1a2f4a6e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ST ATHAN PARK SEWAGE PUMPING STATION | Due 2029-30 | Water body only |
| DCWW101582a · da595dfd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Station Rd CSO, Rhoose | Due 2029-30 | Torbay Terrace Junction Storm Overflow |
| DCWW100768a · 919f3289 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SULLY MOORS SEWAGE PUMPING STATION | Due 2029-30 | Sully Moors Road Storm Overflow |
| DCWW102682a · ce6b4906 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ THE KNAP PROMENADE, BARRY | Due 2029-30 | Barry Lakeside Overflow |
| DCWW101582a · 80223c2d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Tredogan SPS | Due 2029-30 | Tredogan Storm Overflow |
| DCWW100774a · ed885986 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TREDOGAN SPS, TREDOGAN, BARRY | Due 2029-30 | Tredogan Storm Overflow |
| DCWW100784a · 5ade548d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TRERHYNGYLL PUMPING STATION, TRERHYNGYLL, NR COWBRIDGE, S. GLAMORGAN | Due 2029-30 | Trerhyngyll Overflow |
| DCWW100754a · a324f4fe | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ WENVOE PUMPING STATION, STATION ROAD EAST, BARRY | Due 2029-30 | Wenvoe Overflow |
| DCWW102297a · cd66eca4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WENVOE SPS EO | Due 2029-30 | Wenvoe Overflow |
| DCWW101582a · 78e0c406 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ West Aberthaw WWTW W Aberthaw Barry | Due 2029-30 | West Aberthaw WwTW Storm Overflow |
| DCWW100752a · 0b872139 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ WESTWOOD RISE SPS, BARRY | Due 2029-30 | Westward Rise Storm Overflow |
65 of 65 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.