DonateLog in
River Hub
NRW sampling point

Cardiff Airport Car Park Interceptor

Sampled by Natural Resources Wales on 29 visits from 2024 to 2026.

Dissolved oxygen

2024–2026: avg 72 · min 41 % saturation
406080100120202520262024-02-06: 93.7 % saturation2025-01-20: 57 % saturation2025-02-12: 72.3 % saturation2025-04-30: 41.1 % saturation2025-10-23: 82.3 % saturation2026-01-22: 81.3 % saturation2026-09-02: 78.6 % saturation
High ≥ 80Good ≥ 75Moderate ≥ 64Poor ≥ 50Bad < 50

Water temperature

5.0–18.5 °C

Warm water holds less oxygen. There is no river standard for temperature here.

05101520202520262024-02-06: 10.2 °C2025-01-20: 5 °C2025-02-12: 6.2 °C2025-04-30: 14.6 °C2025-10-23: 13.2 °C2026-01-22: 9 °C2026-09-02: 18.5 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative:Natural Resources Wales’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Solids, Suspended at 105 C (mg/l)

NRW sampling point S63012 · 269 readings of 20 tests since 2022.

DateResultUnitSample
2026-09-02 11:405.5mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2026-01-22 11:10< 3mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2025-12-01 11:11< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-11-10 11:193.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-10-23 11:52112mg/lSURFACE DRAINAGE · COMPLIANCE AUDIT (PERMIT)
2025-10-06 11:213.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-09-17 10:24< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-04-30 10:424.5mg/lSURFACE DRAINAGE · COMPLIANCE AUDIT (PERMIT)
2025-03-31 10:264.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-02-26 11:024mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-02-12 12:093mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2025-02-12 12:043.5mg/lSURFACE DRAINAGE · COMPLIANCE AUDIT (PERMIT)
2025-01-20 10:038.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-11-28 12:55< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-11-14 10:272170mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-10-29 10:334mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-09-26 11:25< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-09-03 10:417.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-07-17 10:154.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-06-25 11:1950mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-05-20 11:2151mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-04-10 13:14< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-02-12 13:30< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-02-06 11:333mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2024-01-03 13:257mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-11-30 10:11135mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2022-11-22 11:11< 3mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)

Source: Natural Resources Wales Open Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the Thaw and Cadoxton.