DonateLog in
River Hub
NRW sampling point

Cardiff Airport Coffer Dam Outlet

Sampled by Natural Resources Wales on 29 visits from 2024 to 2026.

Dissolved oxygen

2024–2026: avg 78 · min 64 % saturation
6080100120202520262024-02-06: 89.6 % saturation2025-01-20: 63.5 % saturation2025-02-12: 67.5 % saturation2025-04-30: 80.7 % saturation2025-08-27: 89.8 % saturation2025-10-23: 73.3 % saturation2026-01-22: 72.6 % saturation2026-04-14: 84.7 % saturation2026-06-01: 85.5 % saturation2026-09-02: 70.3 % saturation
High ≥ 80Good ≥ 75Moderate ≥ 64Poor ≥ 50Bad < 50

Water temperature

9.8–14.6 °C

Warm water holds less oxygen. There is no river standard for temperature here.

05101520202520262024-02-06: 9.8 °C2025-01-20: 11.6 °C2025-02-12: 10.6 °C2025-04-30: 12.2 °C2025-08-27: 14.4 °C2025-10-23: 13.8 °C2026-01-22: 10.3 °C2026-04-14: 11.4 °C2026-06-01: 12.3 °C2026-09-02: 14.6 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative:Natural Resources Wales’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Solids, Suspended at 105 C (mg/l)

NRW sampling point S63010 · 348 readings of 20 tests since 2022.

DateResultUnitSample
2026-09-02 10:41< 3mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2026-06-01 10:456mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2026-04-14 12:26< 3mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2026-01-22 11:263mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2025-12-01 11:225mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-11-10 11:34< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-10-23 12:065mg/lSURFACE DRAINAGE · COMPLIANCE AUDIT (PERMIT)
2025-10-06 11:38< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-09-17 10:44< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-08-27 11:237.5mg/lSURFACE DRAINAGE · COMPLIANCE AUDIT (PERMIT)
2025-07-09 10:43< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-06-02 10:52< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-04-30 11:408.5mg/lSURFACE DRAINAGE · COMPLIANCE AUDIT (PERMIT)
2025-03-31 10:4212mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-02-26 11:233mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-02-12 12:32< 3mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2025-02-12 12:313.5mg/lSURFACE DRAINAGE · COMPLIANCE AUDIT (PERMIT)
2025-01-20 10:294mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-11-28 13:153mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-11-14 10:444mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-10-29 10:475mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-09-26 11:38< 3mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-09-03 11:005.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-07-17 10:364mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-06-25 10:5512.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-05-20 11:383.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-04-10 13:348mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-03-19 12:096mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-02-06 11:523mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2024-01-03 12:3521.5mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-11-30 10:343.5mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2022-11-22 12:00< 3mg/lANY TRADE EFFLUENT · COMPLIANCE AUDIT (PERMIT)

Source: Natural Resources Wales Open Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the Thaw and Cadoxton.