DonateLog in
River Hub
NRW sampling point

Aberthaw Power Station Sewage

Sampled by Natural Resources Wales on 8 visits from 2024 to 2026.

Dissolved oxygen

2024–2026: avg 100 · min 92 % saturation
6080100120202520262024-03-14: 96.3 % saturation2024-08-12: 102.3 % saturation2024-10-01: 96.6 % saturation2025-02-12: 100.8 % saturation2025-08-27: 108.7 % saturation2025-10-23: 106.2 % saturation2026-02-24: 91.5 % saturation
High ≥ 80Good ≥ 75Moderate ≥ 64Poor ≥ 50Bad < 50

Water temperature

8.4–19.2 °C

Warm water holds less oxygen. There is no river standard for temperature here.

0102030202520262024-03-14: 10.9 °C2024-08-12: 19.2 °C2024-10-01: 15.8 °C2025-02-12: 8.4 °C2025-08-27: 18.8 °C2025-10-23: 14.2 °C2026-02-24: 12.2 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative:Natural Resources Wales’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: BOD : 5 Day ATU (mg/l)

NRW sampling point S19069 · 61 readings of 8 tests since 2022.

DateResultUnitSample
2026-02-24 13:091.12mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2025-10-23 12:581.15mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2025-08-27 13:401.52mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2025-02-12 11:284.12mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2024-10-01 13:331.32mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2024-08-12 13:46< 1mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2024-03-14 12:241.35mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2023-04-25 09:45< 1mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)
2022-07-20 12:031mg/lFINAL SEWAGE EFFLUENT · COMPLIANCE AUDIT (PERMIT)

Source: Natural Resources Wales Open Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the Thaw and Cadoxton.