Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The River Tawe is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

45
Above the 2050 cap
of 54 tracked
30
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
9
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Brecon Road Cae'r Lan Storm Overflow
DCWW1044
2050127 ·22
141
0 events
+11%14.1×Rising
Clydach Bridge Street Storm Overflow
DCWW2245
2050133 ·22
114
0 events
-14%11.4×Falling — behind
A4068 Over River Cwmtwrch Uchaf Storm Overflow
DCWW2201
2050100 ·22
112
0 events
+12%11.2×Rising
Trebanos the Grove Storm Overflow
DCWW1029
205090 ·22
101
0 events
+12%10.1×Rising
Herbert Street Pontardawe Storm Overflow
DCWW299
2050105 ·22
101
0 events
-4%10.1×Falling — behind
Clydach Road Side Street Storm Overflow
DCWW2066
205099 ·22
96
0 events
-3%9.6×Falling — behind
Bethel Road Cwm-twrch Isaf Overflow
DCWW1639
205077 ·22
93
0 events
+21%9.3×Rising
Coelbren Storm Overflow
DCWW2024
205070 ·22
89
0 events
+27%8.9×Rising
Pontardawe Leisure Centre Storm Overflow
DCWW802
205068 ·22
83
0 events
+22%8.3×Rising
Llanllienwen Road Clydach Storm Overflow
DCWW1208
205037 ·22
81
0 events
+119%8.1×Rising
Heol Glantawe Ystradgynlais No 2 Storm Overflow
DCWW1526
205080 ·22
74
0 events
-8%7.4×Falling — behind
James Street Pontardawe Storm Overflow
DCWW2255
205093 ·22
73
0 events
-22%7.3×Falling — behind
Station Road Rear Abercraf Storm Overflow
DCWW747
2050136 ·22
73
0 events
-46%7.3×Falling — behind
Heol Y Maes Storm Overflow
DCWW2330
205028 ·24
73
0 events
+161%7.3×Rising
Hebron Road Storm Overflow
DCWW1258
205064 ·22
69
0 events
+8%6.9×Rising
Ncn437 Cwmllynfell Overflow
DCWW1821
205078 ·22
69
0 events
-12%6.9×Falling — behind
Station Road Caehopkin Storm Overflow
DCWW1963
2050161 ·22
66
0 events
-59%6.6×Falling — behind
Heol Dyfan Swansea Overflow
DCWW1600
205011 ·22
61
0 events
+455%6.1×Rising
Heol Eglwys Ystradgynlais Storm Overflow
DCWW1845
205057 ·22
59
0 events
+4%5.9×Rising
Walters Road Llansamlet Storm Overflow
DCWW1196
205051 ·22
58
0 events
+14%5.8×Rising
South of A4067 Abercraf Storm Overflow
DCWW2200
20500 ·22
58
0 events
—5.8×Rising
Min-y-rhos Footbridge Storm Overflow
DCWW852
205060 ·22
58
0 events
-3%5.8×Falling — behind
New Road Cwmllynfell Storm Overflow
DCWW2203
205030 ·22
57
0 events
+90%5.7×Rising
Crown Street Morriston Storm Overflow
DCWW414
20500 ·22
53
0 events
—5.3×Rising
Heol Eithrym Storm Overflow
DCWW1559
205010 ·22
51
0 events
+410%5.1×Rising
Lamb Bridge Storm Overflow
DCWW1238
205023 ·22
48
0 events
+109%4.8×Rising
Ystalyfera Glanyrafon Road Storm Overflow
DCWW1614
205036 ·22
45
0 events
+25%4.5×Rising
Cwm-twrch Uchaf Car Park Storm Overflow
DCWW991
205018 ·22
45
0 events
+150%4.5×Rising
Ystradgynlais Cwmtwrch Bridge Street Storm Overflow
DCWW590
205010 ·22
42
0 events
+320%4.2×Rising
Lon Catwg Storm Overflow
DCWW253
205027 ·22
40
0 events
+48%4×Rising
Caer-lan Abercraf Storm Overflow
DCWW1558
2050105 ·22
39
0 events
-63%3.9×Falling — behind
Waurn Gyrlais Footpath Storm Overflow
DCWW1753
205037 ·22
39
0 events
+5%3.9×Rising
West of Long Street Penrhos Storm Overflow
DCWW2088
205019 ·22
36
0 events
+89%3.6×Rising
Station Road Glais Storm Overflow
DCWW1087
205023 ·22
36
0 events
+57%3.6×Rising
Ynyscedwyn Road Ystradgynlais Storm Overflow
DCWW952
205025 ·22
35
0 events
+40%3.5×Rising
Peniel Green Road Storm Overflow
DCWW1654
205027 ·22
33
0 events
+22%3.3×Rising
Trallwn Community Centre Storm Overflow
DCWW1041
20500 ·22
31
0 events
—3.1×Rising
Ynys Y Mond Road Swansea Overflow
DCWW1861
205017 ·22
28
0 events
+65%2.8×Rising
Llys Tawel Ystradgynlais Storm Overflow
DCWW884
205024 ·22
24
0 events
0%2.4×Falling — behind
Lonlas Storm Overflow
DCWW2193
205057 ·22
20
0 events
-65%2×Falling — behind
Primrose Lane Lon Y Wern Storm Overflow
DCWW1946
20502 ·22
17
0 events
+750%1.7×Rising
Heol Glantawe Ystradgynlais Storm Overflow
DCWW1254
205073 ·22
14
0 events
-81%1.4×Nearly there
Drummau Road Storm Overflow
DCWW612
205031 ·22
14
0 events
-55%1.4×Nearly there
River Tawe Godre'r Graig Storm Overflow
DCWW1106
205021 ·22
13
0 events
-38%1.3×Nearly there
Heol Dulais Birchgrove Storm Overflow
DCWW2269
20505 ·22
11
0 events
+120%1.1×Rising
Birchgrove Road Storm Overflow
DCWW698
20507 ·22
9
0 events
+29%0.9×Within the cap
Bethel Road Llansamlet Storm Overflow
DCWW1570
20500 ·22
5
0 events
—0.5×Within the cap
Heol Las Storm Overflow
DCWW583
20501 ·22
4
1 events
+300%0.4×Within the cap
Slate Street Junciton With Margam Avenue Storm Overflow
DCWW477
20504 ·22
4
0 events
0%0.4×Within the cap
Cwm Bath Road Storm Overflow
DCWW627
20500 ·22
2
0 events
—0.2×Within the cap
Chemical Road Junction of Sway Road Storm Overflow
DCWW657
20500 ·22
1
0 events
—0.1×Within the cap
Tawe Terrace Storm Overflow
DCWW156
20501 ·25
1
1 events
0%0.1×—Within the cap
Felinfach Road Ystradowen Storm Overflow
DCWW965
205010 ·22
0
0 events
-100%0×Within the cap
Quarr Rd Storm Overflow
DCWW2101
20500 ·22
0
0 events
—0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →