What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100375a · 56e84aa6 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ SWANSEA STW FABIAN WAY SWANSEA , | Complete 2025-26 | Fabian Way Swansea Storm Overflow |
| DCWW100386a · fb5271ca | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TREBANOS STW (SETTLED STORM) TREBA | Complete 2025-26 | Trebanos WwTW Storm Overflow |
| DCWW100412a · 4f8e5ec2 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ YSTRADGYNLAIS WWTW OFF WIND ROAD | Complete 2025-26 | Ystradgynlais WwTW Wetland Return Storm Overflow |
| DCWW101984a · c5ea711a | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Adj 1 The Grove, Trebanos | Due 2029-30 | Trebanos The Grove Storm Overflow |
| DCWW102782a · 031b9d35 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Adj 27 Bethel Rd, Llansamlet | Due 2029-30 | Bethel Road Llansamlet Storm Overflow |
| DCWW101582a · 26413ec2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Birchgrove Road CSO | Due 2029-30 | Birchgrove Road Storm Overflow |
| DCWW101582a · 809c8a12 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Canal CSO. Towpath Off Hebron Road, Clydach | Due 2029-30 | Hebron Road Storm Overflow |
| DCWW102745a · 5f566a01 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CLYDACH HEOL Y NANT/SYBIL ST POINT 126 | Due 2029-30 | Heol-Y-Nant Sybil Street Storm Overflow |
| DCWW100939a · 2f2cdd8d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COELBREN PS 1 EMERGENCY | Due 2029-30 | Coelbren Storm Overflow |
| DCWW102393a · cd63f19c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Crown Street CSO Morriston | Due 2029-30 | Beacons View Road Storm Overflow |
| DCWW101582a · dfd3a5b7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO Felinfach Rd. Ystradowen. | Due 2029-30 | Felinfach Road Ystradowen Storm Overflow |
| DCWW101582a · 33c53697 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO 72 Slate St Morriston Swansea | Due 2029-30 | Slate Street junciton with Margam Avenue Storm Overflow |
| DCWW101582a · 1eb0dd59 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO 80 Pentrpoeth Rd Morriston | Due 2029-30 | Chemical Road junction of Sway Road Storm Overflow |
| DCWW101582a · 32851601 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO 81 CWM BATH ROAD MORRISTON | Due 2029-30 | Beacons View Road Storm Overflow |
| DCWW101028a · 233a3f64 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CSO 989, OUTFALL M, THE TAWE BARRAGE, SWANSEA | Due 2029-30 | Off Somset Place Swansea Storm Overflow |
| DCWW101582a · 4e2995b3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO ADJ 97 CRAIG RD GELLINUDD | Due 2029-30 | Lon Catwg Storm Overflow |
| DCWW101582a · eecb6be8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at QUARRY ROAD CLYDACH (POINT 125) | Due 2029-30 | Quarr Rd Storm Overflow |
| DCWW101582a · 92e0ea27 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Ynysmeudw Warehouse (SOC | Due 2029-30 | A4067 and Ynysmeudw Road Roundabout Storm Overflow |
| DCWW101582a · 55d9c647 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO HALFWAY CRYMLYN ROAD PS | Due 2029-30 | Halfway Pentre-Dwr Storm Overflow |
| DCWW101582a · 296b10c3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO M'HOLE 14 ABERCRAVE ST.DAVIDS C | Due 2029-30 | South of A4067 Abercraf Storm Overflow |
| DCWW101582a · 5f2d7851 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO Near Chemical Rd. Morriston | Due 2029-30 | Chemical Road junction of Sway Road Storm Overflow |
| DCWW101582a · 698f26c4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO on A4068 above Lower Brunorgan Bridge | Due 2029-30 | A4068 over River Cwmtwrch Uchaf Storm Overflow |
| DCWW102390a · 133ead0a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cwm Level Rd/Trewyddfa Rd CSO Swansea | Due 2029-30 | Water body only |
| DCWW101973a · bd8f6f43 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Dilwyn Arms Pontardawe | Due 2029-30 | Herbert Street Pontardawe Storm Overflow |
| DCWW101582a · c46c49e5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Felin Fran CSO Walters Rd Llansamle | Due 2029-30 | Walters Road Llansamlet Storm Overflow |
| DCWW101582a · ac3cc367 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Glais CSO | Due 2029-30 | Station Road Glais Storm Overflow |
| DCWW101582a · e5e1ea89 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Glais SPS | Due 2029-30 | Station Road Glais Storm Overflow |
| DCWW101016a · 1d0f7804 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ GWERNLLYNCHWYTH RD SPS, BIRCH GROVE, SWANSEA | Due 2029-30 | Water body only |
| DCWW101143a · 68f83577 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HALFWAY SPS CRYMLYN ROAD, Swansea | Due 2029-30 | Halfway Pentre-Dwr Storm Overflow |
| DCWW101974a · eb350626 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Hebron Rd Clydach CSO | Due 2029-30 | Hebron Road Storm Overflow |
| DCWW102788a · 3c53b376 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Heol Dulais CSO Birchgrove | Due 2029-30 | Heol Dulais Birchgrove Storm Overflow |
| DCWW102554a · cffd62f2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HEOL EITHRYM CSO | Due 2029-30 | Heol Eithrym Storm Overflow |
| DCWW102744a · 7c4bbb82 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Heol Las CSO, rear 19 Smiths Rd, Swansea | Due 2029-30 | Heol Las Storm Overflow |
| DCWW102742a · b4731bd6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Heol Nant Gelli CSO | Due 2029-30 | Water body only |
| DCWW101097a · 372ae34f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Herbert Thomas Way SPS, Ysallen Road, Heol Las, Birchgrove, Swansea, SA7 0HG | Due 2029-30 | Walters Road Llansamlet Storm Overflow |
| DCWW101983a · 433b8d4b | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Inco Works Clydach | Due 2029-30 | Clydach Bridge Street Storm Overflow |
| DCWW102011a · efab2692 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ James St Pontardawe | Due 2029-30 | James Street Pontardawe Storm Overflow |
| DCWW102546a · bb763567 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ JAMES ST PONTARDAWE | Due 2029-30 | James Street Pontardawe Storm Overflow |
| DCWW100865a · cea70c52 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LON LAS SEWERAGE SCHEME EMERGENCY OUTLET | Due 2029-30 | Water body only |
| DCWW102398a · bcaab6b6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MYNYDD GARNLLWYDD CSO MORRISTON | Due 2029-30 | Water body only |
| DCWW102787a · d0525c44 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NEAR DELFFORDD PONTARDAWE | Due 2029-30 | Primrose Lane Lon Y Wern Storm Overflow |
| DCWW102423a · 942cd88e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NR 15 WAUN GYRLAIS SWANSEA CSO | Due 2029-30 | Waurn Gyrlais Footpath Storm Overflow |
| DCWW102454a · 9a11368e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ O/S 17 GLANTAWE ROW YSTRADGYNLAIS | Due 2029-30 | Heol Glantawe Ystradgynlais No 2 Storm Overflow |
| DCWW101582a · cb4b95a7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Office Row Car Park Ystalyfera CSO | Due 2029-30 | Ystalyfera Glanyrafon Road Storm Overflow |
| DCWW102783a · af6bbda4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Opp. Cae-Nan Jcn Ynysforgan Swansea CSO | Due 2029-30 | Llanllienwen Road Clydach Storm Overflow |
| DCWW101478a · 63e9404b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pant y Blawdd/Nant y Creyr SPS, Llansamlet, Swansea, SA7 9GF | Due 2029-30 | Water body only |
| DCWW102408a · ce708a4d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Peniel Green Road CSO Swansea opp137 | Due 2029-30 | Peniel Green Road Storm Overflow |
| DCWW102424a · 56f9f9dc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PENRHOS NEAR CWMTAWE FARM MANHOLE 12 INT | Due 2029-30 | West of Long Street Penrhos Storm Overflow |
| DCWW102446a · 4591901f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PENTRE CHWYTH POINT 100 NEW MAP | Due 2029-30 | Water body only |
| DCWW100973a · 4c9d171c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PHASE 2, RESIDENTIAL DEVELOPMENT, BIRCHGROVE RD, GLAIS | Due 2029-30 | Water body only |
| DCWW102370a · 1dae79b0 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTARDAWE NO 2 INTO RIVER TAWE | Due 2029-30 | Tawe Terrace Storm Overflow |
| DCWW102452a · 1e5e2ff6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ REAR OF LONLAS STATION ROAD ABERCRAVE | Due 2029-30 | Station Road Rear Abercraf Storm Overflow |
| DCWW101138a · fd451866 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Skewen SPS, Park Avenue, Lonlas, | Due 2029-30 | Lonlas Storm Overflow |
| DCWW100869a · 22a44b09 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SPS ADJ 458 BIRCHGROVE ROAD, SWANSEA | Due 2029-30 | Drummau Road Storm Overflow |
| DCWW102453a · b11e4793 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Station Road CSO Caehopkin | Due 2029-30 | Station Road Caehopkin Storm Overflow |
| DCWW102741a · b1e31d72 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SWANSEA CARMARTHEN ROAD/GORSE AVENUE | Due 2029-30 | Water body only |
| DCWW102389a · ce17d926 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SWANSEA CWM ROAD NEAR HAFOD BRIDGE | Due 2029-30 | Off Somset Place Swansea Storm Overflow |
| DCWW101582a · c05956e0 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SWO.M'HOLE 154A GEORGE IV PH UPPER CSO | Due 2029-30 | Lamb Bridge Storm Overflow |
| DCWW102781a · b0915a9e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Trallwn Community Centre CSO | Due 2029-30 | Trallwn Community Centre Storm Overflow |
| DCWW102417a · a07fdc70 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ UPPER CWM-TWRCH PH CAR PARK | Due 2029-30 | Cwm-twrch Uchaf Car Park Storm Overflow |
| DCWW102438a · 8fdc15a8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YSTRADGYNLAIS CWMTWRCH BRIDGE ST 7M D/S | Due 2029-30 | Ystradgynlais Cwmtwrch Bridge Street Storm Overflow |
| DCWW102421a · ead9f5b7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YSTRADGYNLAIS NR CLAYPON BRIDGE MH 92 | Due 2029-30 | Ynyscedwyn Road Ystradgynlais Storm Overflow |
| DCWW102420a · 74b3fa1b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YSTRADGYNLAIS NR GOUGH ARMS MH 148 INTO | Due 2029-30 | Heol Glantawe Ystradgynlais Storm Overflow |
| DCWW102422a · ba76d500 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ystradgynlais, Mason Arms | Due 2029-30 | Llys Tawel Ystradgynlais Storm Overflow |
64 of 64 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.