Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Clinic, TavistockCSO379Tavistock STWNo measure
Playing Field, TavistockCSO378Tavistock STWMeasure linked
Pixon Ln, TavistockCSO335Tavistock STWNo measure
Harrowbeer, YelvertonCSO328Horrabridge STWNo measure
Bedford Bridge, HorrabridgeCSO242Horrabridge STWNo measure
Crowndale, TavistockCSO240Tavistock STWNo measure
Westbridge Cotts, TavistockCSO228Tavistock STWMeasure linked
Chapel Ln, HorrabridgeCSO120Horrabridge STWNo measure
Bishops Mead, TavistockCSO64Tavistock STWNo measure
Plymouth Rd, TavistockCSO6Tavistock STWNo measure
Mount House pumping station, TavistockPS-CSO/EO4Tavistock STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.