← Market Street pumping station, Kingsand

Spill evidence · River Hub

Market Street pumping station, Kingsand

Pumping station overflow · SBB00641 · feeds MILLBROOK STW
No rain data

The discharge

Spill day
Monday, 21 December 2020
Started
21 Dec 2020, 18:34
Ended
21 Dec 2020, 19:05
Duration
31 minutes 10 seconds
Receiving water
Cotehele Stream
Parish
Maker-with-Rame

Rainfall evidence

Daily rainfall at the matched gauge (Torpoint) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
21/12/2020 (spill day)no data
20/12/2020no data
19/12/2020no data
18/12/2020no data
17/12/2020no data

River flow that day: 24.481 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Kingsand
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00641). Rainfall: EA Hydrology gauge c89cc787-ab14-4a15-8b22-e5ad8bc83429. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Lower Tamar & Inny Data.