← Cambridge Lane, Plymouth

Spill evidence · River Hub

Cambridge Lane, Plymouth

Combined sewer overflow · SBB00203 · feeds PLYMOUTH CENTRAL STW
Dry spill

Evidence strength

Medium confidence
  • ✓ Dry across a 4-day antecedent window
  • ✓ Monitor 90% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Monday, 13 May 2024
Started
13 May 2024, 11:39
Ended
13 May 2024, 12:01
Duration
22 minutes
Receiving water
Cotehele Stream
Parish
Maker-with-Rame

Rainfall evidence

Daily rainfall at the matched gauge (Torpoint) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
13/05/2024 (spill day)0 mmdry
12/05/20240 mmdry
11/05/20240 mmdry
10/05/20240 mmdry
09/05/20240 mmdry

River flow that day: 7.427 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Plymouth Hoe West
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
91 counted spills · 465 h total
Monitor uptime (2024)
90% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00203). Rainfall: EA Hydrology gauge c89cc787-ab14-4a15-8b22-e5ad8bc83429. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Lower Tamar & Inny Data.