Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
The Storm Overflows Discharge Reduction Plan covers England only. The River Taff is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Tonteg Road Taff Vale Storm Overflow DCWW1054 | 2050 | 128 ·22 | 119 0 events | -7% | 11.9× | Falling — behind | |
| River Row Abercynon Overflow DCWW1648 | 2050 | 91 ·22 | 118 0 events | +30% | 11.8× | Rising | |
| East of Rounabout A4102 Jct With High Street Storm Overflow DCWW402 | 2050 | 110 ·22 | 114 0 events | +4% | 11.4× | Rising | |
| Pontrhun Bridge Storm Overflow DCWW501 | 2050 | 36 ·22 | 96 0 events | +167% | 9.6× | Rising | |
| Ynysangharad Park Bridge Storm Overflow DCWW81 | 2050 | 23 ·22 | 93 0 events | +304% | 9.3× | Rising | |
| Gellifaelog Old Road Storm Overflow DCWW597 | 2050 | 91 ·22 | 89 0 events | -2% | 8.9× | Falling — behind | |
| Cardiff Central Storm Overflow DCWW1025 | 2050 | 54 ·22 | 84 0 events | +56% | 8.4× | Rising | |
| Merthyr Tydfil Industrial Park Storm Overflow DCWW1475 | 2050 | 69 ·22 | 81 0 events | +17% | 8.1× | Rising | |
| Bethesda Street Merthyr Tydfil Storm Overflow DCWW1050 | 2050 | 89 ·22 | 79 0 events | -11% | 7.9× | Falling — behind | |
| Llys Tripp Gwaelod-y-garth Overflow DCWW1557 | 2050 | 6 ·22 | 75 0 events | +1150% | 7.5× | Rising | |
| Oakland Street Bedlinog Storm Overflow DCWW832 | 2050 | 83 ·22 | 74 0 events | -11% | 7.4× | Falling — behind | |
| Treforest Lewistown Park Overflow DCWW1324 | 2050 | 0 ·22 | 69 0 events | — | 6.9× | Rising | |
| Pen-y-darren Rd Jct With Gwalia Place Storm Overflow DCWW513 | 2050 | 64 ·22 | 69 0 events | +8% | 6.9× | Rising | |
| Abercynon Wood Road Storm Overflow DCWW1870 | 2050 | 72 ·22 | 66 0 events | -8% | 6.6× | Falling — behind | |
| Cynon Wwtw Storm Overflow DCWW74 | 2050 | 135 ·22 | 64 0 events | -53% | 6.4× | Falling — behind | |
| West Street Pontypridd Storm Overflow DCWW198 | 2050 | 8 ·22 | 63 0 events | +688% | 6.3× | Rising | |
| Crossbrook Street Storm Overflow DCWW78 | 2050 | 53 ·22 | 62 0 events | +17% | 6.2× | Rising | |
| Rocky Road 1 Storm Overflow DCWW780 | 2050 | 62 ·22 | 61 0 events | -2% | 6.1× | Falling — behind | |
| Ynysybwl Road Taff Vale Overflow DCWW1282 | 2050 | 42 ·22 | 57 0 events | +36% | 5.7× | Rising | |
| Merthyr Tydfil College Car Park Storm Overflow DCWW547 | 2050 | 46 ·22 | 56 0 events | +22% | 5.6× | Rising | |
| Tai Mawr Way Storm Overflow DCWW466 | 2050 | 79 ·22 | 47 0 events | -41% | 4.7× | Falling — behind | |
| Pavia Court Storm Overflow DCWW195 | 2050 | 51 ·22 | 44 0 events | -14% | 4.4× | Falling — behind | |
| Cyfarthfa Road Storm Overflow DCWW409 | 2050 | 50 ·22 | 37 0 events | -26% | 3.7× | Falling — behind | |
| Tram Road Side Storm Overflow DCWW440 | 2050 | 22 ·22 | 32 0 events | +45% | 3.2× | Rising | |
| Fiddlers Elbow Quakers Yard Storm Overflow DCWW389 | 2050 | 15 ·22 | 32 0 events | +113% | 3.2× | Rising | |
| Lionel Terrace Storm Overflow DCWW913 | 2050 | 43 ·22 | 32 0 events | -26% | 3.2× | Falling — behind | |
| Swan Street Merthyr Tydfil Storm Overflow DCWW2267 | 2050 | 25 ·22 | 31 0 events | +24% | 3.1× | Rising | |
| Castle Inn Bridge Storm Overflow DCWW664 | 2050 | 61 ·22 | 30 0 events | -51% | 3× | Falling — behind | |
| Pont-y-cefn Storm Overflow DCWW1793 | 2050 | 37 ·22 | 28 0 events | -24% | 2.8× | Falling — behind | |
| Parc Caedelyn Storm Overflow DCWW824 | 2050 | 27 ·22 | 26 0 events | -4% | 2.6× | Falling — behind | |
| Goitre Lane Storm Overflow DCWW587 | 2050 | 17 ·22 | 25 0 events | +47% | 2.5× | Rising | |
| Grangetown Storm Overflow DCWW586 | 2050 | 0 ·22 | 17 0 events | — | 1.7× | Rising | |
| Mill Street Pontypridd Storm Overflow DCWW227 | 2050 | 10 ·22 | 14 0 events | +40% | 1.4× | Rising | |
| Park Place Clifnydd 2 Storm Overflow DCWW821 | 2050 | 6 ·22 | 9 0 events | +50% | 0.9× | Within the cap | |
| Rocky Road 2 Storm Overflow DCWW2111 | 2050 | 18 ·22 | 9 1 events | -50% | 0.9× | Within the cap | |
| Merthyr Vale Trunk Sewer Storm Overflow DCWW546 | 2050 | 6 ·22 | 8 1 events | +33% | 0.8× | Within the cap | |
| Harrowby Street Storm Overflow DCWW1260 | 2050 | 47 ·22 | 7 0 events | -85% | 0.7× | Within the cap | |
| Martins Terrace Abercynon Overflow DCWW1477 | 2050 | 4 ·22 | 7 0 events | +75% | 0.7× | Within the cap | |
| Park Street Cardiff Storm Overflow DCWW197 | 2050 | 5 ·22 | 6 0 events | +20% | 0.6× | Within the cap | |
| Ynys Bridge 2 Storm Overflow DCWW1773 | 2050 | 31 ·22 | 6 0 events | -81% | 0.6× | Within the cap | |
| Balaclava Road 1 Storm Overflow DCWW708 | 2050 | 0 ·22 | 4 0 events | — | 0.4× | Within the cap | |
| Troedyrhiw Storm Overflow DCWW1982 | 2050 | 3 ·22 | 3 0 events | 0% | 0.3× | Within the cap | |
| Market Street Dowlais Storm Overflow DCWW1589 | 2050 | 2 ·22 | 2 0 events | 0% | 0.2× | Within the cap | |
| Cardiff Road Pontypridd Storm Overflow DCWW667 | 2050 | 0 ·22 | 1 0 events | — | 0.1× | Within the cap | |
| Balaclava Road 2 Storm Overflow DCWW2110 | 2050 | 0 ·22 | 1 0 events | — | 0.1× | Within the cap | |
| Railway Sidings Merthyr Vale Overflow DCWW1690 | 2050 | 6 ·24 | 0 0 events | -100% | 0× | Within the cap | |
| Glyn Dwr Avenue Pontypridd Overflow DCWW1627 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Sion Street Storm Overflow DCWW168 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Phyllis Street Storm Overflow DCWW512 | 2050 | 3 ·22 | 0 0 events | -100% | 0× | Within the cap | |
| Taff Street Pontypridd Storm Overflow DCWW158 | 2050 | 1 ·22 | 0 0 events | -100% | 0× | Within the cap | |
| Aberfan Trunk Sewer Storm Overflow DCWW459 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Eastfield Terrace Storm Overflow DCWW1543 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Curran Storm Overflow DCWW413 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Park Place Cilfnydd 1 Storm Overflow DCWW527 | 2050 | 1 ·22 | 0 0 events | -100% | 0× | Within the cap | |
| Alexandra Road Pontypridd Overflow DCWW1386 | 2050 | 1 ·22 | 0 0 events | -100% | 0× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →