Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The River Taff is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

33
Above the 2050 cap
of 55 tracked
19
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
22
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Tonteg Road Taff Vale Storm Overflow
DCWW1054
2050128 ·22
119
0 events
-7%11.9×Falling — behind
River Row Abercynon Overflow
DCWW1648
205091 ·22
118
0 events
+30%11.8×Rising
East of Rounabout A4102 Jct With High Street Storm Overflow
DCWW402
2050110 ·22
114
0 events
+4%11.4×Rising
Pontrhun Bridge Storm Overflow
DCWW501
205036 ·22
96
0 events
+167%9.6×Rising
Ynysangharad Park Bridge Storm Overflow
DCWW81
205023 ·22
93
0 events
+304%9.3×Rising
Gellifaelog Old Road Storm Overflow
DCWW597
205091 ·22
89
0 events
-2%8.9×Falling — behind
Cardiff Central Storm Overflow
DCWW1025
205054 ·22
84
0 events
+56%8.4×Rising
Merthyr Tydfil Industrial Park Storm Overflow
DCWW1475
205069 ·22
81
0 events
+17%8.1×Rising
Bethesda Street Merthyr Tydfil Storm Overflow
DCWW1050
205089 ·22
79
0 events
-11%7.9×Falling — behind
Llys Tripp Gwaelod-y-garth Overflow
DCWW1557
20506 ·22
75
0 events
+1150%7.5×Rising
Oakland Street Bedlinog Storm Overflow
DCWW832
205083 ·22
74
0 events
-11%7.4×Falling — behind
Treforest Lewistown Park Overflow
DCWW1324
20500 ·22
69
0 events
—6.9×Rising
Pen-y-darren Rd Jct With Gwalia Place Storm Overflow
DCWW513
205064 ·22
69
0 events
+8%6.9×Rising
Abercynon Wood Road Storm Overflow
DCWW1870
205072 ·22
66
0 events
-8%6.6×Falling — behind
Cynon Wwtw Storm Overflow
DCWW74
2050135 ·22
64
0 events
-53%6.4×Falling — behind
West Street Pontypridd Storm Overflow
DCWW198
20508 ·22
63
0 events
+688%6.3×Rising
Crossbrook Street Storm Overflow
DCWW78
205053 ·22
62
0 events
+17%6.2×Rising
Rocky Road 1 Storm Overflow
DCWW780
205062 ·22
61
0 events
-2%6.1×Falling — behind
Ynysybwl Road Taff Vale Overflow
DCWW1282
205042 ·22
57
0 events
+36%5.7×Rising
Merthyr Tydfil College Car Park Storm Overflow
DCWW547
205046 ·22
56
0 events
+22%5.6×Rising
Tai Mawr Way Storm Overflow
DCWW466
205079 ·22
47
0 events
-41%4.7×Falling — behind
Pavia Court Storm Overflow
DCWW195
205051 ·22
44
0 events
-14%4.4×Falling — behind
Cyfarthfa Road Storm Overflow
DCWW409
205050 ·22
37
0 events
-26%3.7×Falling — behind
Tram Road Side Storm Overflow
DCWW440
205022 ·22
32
0 events
+45%3.2×Rising
Fiddlers Elbow Quakers Yard Storm Overflow
DCWW389
205015 ·22
32
0 events
+113%3.2×Rising
Lionel Terrace Storm Overflow
DCWW913
205043 ·22
32
0 events
-26%3.2×Falling — behind
Swan Street Merthyr Tydfil Storm Overflow
DCWW2267
205025 ·22
31
0 events
+24%3.1×Rising
Castle Inn Bridge Storm Overflow
DCWW664
205061 ·22
30
0 events
-51%3×Falling — behind
Pont-y-cefn Storm Overflow
DCWW1793
205037 ·22
28
0 events
-24%2.8×Falling — behind
Parc Caedelyn Storm Overflow
DCWW824
205027 ·22
26
0 events
-4%2.6×Falling — behind
Goitre Lane Storm Overflow
DCWW587
205017 ·22
25
0 events
+47%2.5×Rising
Grangetown Storm Overflow
DCWW586
20500 ·22
17
0 events
—1.7×Rising
Mill Street Pontypridd Storm Overflow
DCWW227
205010 ·22
14
0 events
+40%1.4×Rising
Park Place Clifnydd 2 Storm Overflow
DCWW821
20506 ·22
9
0 events
+50%0.9×Within the cap
Rocky Road 2 Storm Overflow
DCWW2111
205018 ·22
9
1 events
-50%0.9×Within the cap
Merthyr Vale Trunk Sewer Storm Overflow
DCWW546
20506 ·22
8
1 events
+33%0.8×Within the cap
Harrowby Street Storm Overflow
DCWW1260
205047 ·22
7
0 events
-85%0.7×Within the cap
Martins Terrace Abercynon Overflow
DCWW1477
20504 ·22
7
0 events
+75%0.7×Within the cap
Park Street Cardiff Storm Overflow
DCWW197
20505 ·22
6
0 events
+20%0.6×Within the cap
Ynys Bridge 2 Storm Overflow
DCWW1773
205031 ·22
6
0 events
-81%0.6×Within the cap
Balaclava Road 1 Storm Overflow
DCWW708
20500 ·22
4
0 events
—0.4×Within the cap
Troedyrhiw Storm Overflow
DCWW1982
20503 ·22
3
0 events
0%0.3×Within the cap
Market Street Dowlais Storm Overflow
DCWW1589
20502 ·22
2
0 events
0%0.2×Within the cap
Cardiff Road Pontypridd Storm Overflow
DCWW667
20500 ·22
1
0 events
—0.1×Within the cap
Balaclava Road 2 Storm Overflow
DCWW2110
20500 ·22
1
0 events
—0.1×Within the cap
Railway Sidings Merthyr Vale Overflow
DCWW1690
20506 ·24
0
0 events
-100%0×Within the cap
Glyn Dwr Avenue Pontypridd Overflow
DCWW1627
20500 ·22
0
0 events
—0×Within the cap
Sion Street Storm Overflow
DCWW168
20500 ·22
0
0 events
—0×Within the cap
Phyllis Street Storm Overflow
DCWW512
20503 ·22
0
0 events
-100%0×Within the cap
Taff Street Pontypridd Storm Overflow
DCWW158
20501 ·22
0
0 events
-100%0×Within the cap
Aberfan Trunk Sewer Storm Overflow
DCWW459
20500 ·22
0
0 events
—0×Within the cap
Eastfield Terrace Storm Overflow
DCWW1543
20500 ·22
0
0 events
—0×Within the cap
Curran Storm Overflow
DCWW413
20500 ·22
0
0 events
—0×Within the cap
Park Place Cilfnydd 1 Storm Overflow
DCWW527
20501 ·22
0
0 events
-100%0×Within the cap
Alexandra Road Pontypridd Overflow
DCWW1386
20501 ·22
0
0 events
-100%0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →