What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100151a · cd7ea226 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CARDIFF CENTRAL SPS TREMORFA | Complete 2025-26 | Cardiff Central Storm Overflow |
| DCWW100152a · 1ab31fdd | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CARDIFF EAST DISTRICT LONG OUTFALL | Complete 2025-26 | Cardiff Central Storm Overflow |
| DCWW100153a · b0e364b4 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CARDIFF EASTERN DISTRICT | Complete 2025-26 | Cardiff Central Storm Overflow |
| DCWW100163a · 527c5036 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CILFYNYDD STW CILFYNYDD PONTYPRID | Complete 2025-26 | Cilfynydd WwTW Storm Overflow |
| DCWW100190a · beef8c44 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CYNON VALLEY STW GLYNCOCH PONTY | Complete 2025-26 | Cynon WwTW Storm Overflow |
| DCWW100345a · 2ceed5f5 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PONTSTICILL WWTW | Complete 2025-26 | Pontsticill WwTW Storm Overflow |
| DCWW102162a · 177541c7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ABERCYNON RUGBY CLUB | Due 2026-27 | River Row Abercynon Overflow |
| DCWW100638a · 9454e1fa | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ PONTSTICILL | Due 2027-28 | Pontsticill WwTW Storm Overflow |
| DCWW101582a · 3622d577 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ 3rd Trunk CSO South of Glan Yr Afon | Due 2029-30 | Merthyr Vale Trunk Sewer Storm Overflow |
| DCWW100850a · bff93654 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ 81 Heol Briwnant, Rhiwbina, Cardiff | Due 2029-30 | Water body only |
| DCWW101582a · 792d757a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ A CSO AT JACKSONS BRIDGE | Due 2029-30 | Bethesda Street Merthyr Tydfil Storm Overflow |
| DCWW101582a · f440baea | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ A CSO AT WATERLOO HOUSE MERTHYR | Due 2029-30 | East of Rounabout A4102 jct with High Street Storm Overflow |
| DCWW100829a · 359b2dec | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ A SPS, CARDIFF CENTRAL SEWAGE PUMPING STATION, TREMORFA, CARDIFF | Due 2029-30 | Cardiff Central Storm Overflow |
| DCWW100826a · 9f477aa6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ABERCYNON PUMPING STATION, WOOD ROAD, ABERCYNON | Due 2029-30 | Abercynon Wood Road Storm Overflow |
| DCWW102684a · 27dd9e91 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ABERFAN SEWAGE FARM TRUNK SEWER | Due 2029-30 | Aberfan Trunk Sewer Storm Overflow |
| DCWW101582a · f4d3772c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Balaclava Rd CSO, Dowlais | Due 2029-30 | Balaclava Road 2 Storm Overflow |
| DCWW100659a · 8591ea7a | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ BUILTH WELLS | Due 2029-30 | Park Place Clifnydd 2 Storm Overflow |
| DCWW102281a · c9cffcb7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAEDELYN PARK BOUNDARY | Due 2029-30 | Parc Caedelyn Storm Overflow |
| DCWW102563a · a8fce57b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cardiff Central SPS CSO | Due 2029-30 | Ocean Park Storm Overflow |
| DCWW102564a · d12394af | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cardiff Eastern District CSO | Due 2029-30 | Cardiff Central Storm Overflow |
| DCWW102565a · ab315fef | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIFF EASTERN DISTRICT PS | Due 2029-30 | Cardiff Central Storm Overflow |
| DCWW102677a · 08cb5525 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIFF GRANGETOWN THE MARL OFF AVONDALE | Due 2029-30 | Grangetown Storm Overflow |
| DCWW101582a · 9a149b6a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cardiff Road CSO, Pontypridd | Due 2029-30 | Cardiff Road Pontypridd Storm Overflow |
| DCWW102289a · 5ef98c10 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cardiff Westbourne Crescent Bottom | Due 2029-30 | Westbourne Crescent Bottom Cardiff Storm Overflow |
| DCWW102290a · 12ef388d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIFF WOOD STREET/HAVELOCK STREET JNCT | Due 2029-30 | Havelock Street Cardiff Storm Overflow |
| DCWW101582a · 138eb84c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CASTLE INN CSO ASSET NO 32280 | Due 2029-30 | Castle Inn Bridge Storm Overflow |
| DCWW101582a · 7f78cc61 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Crossbrook St CSO, Pontypridd | Due 2029-30 | Crossbrook Street Storm Overflow |
| DCWW101582a · f6aa3319 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Treforest Llantwit Rd A | Due 2029-30 | Llantwit Road Storm Overflow |
| DCWW101582a · 39c2aa9c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at QUAKERS YARD - NEAR PUBLIC HOU | Due 2029-30 | Rodericks Terrace Storm Overflow |
| DCWW101582a · 32200e1c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at The Bont, Merthyr Tydfil | Due 2029-30 | Gellifaelog Old Road Storm Overflow |
| DCWW101582a · fad0bfea | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO WILLOW GAS WORKS MERTHYR TYDFIL | Due 2029-30 | Eastfield Terrace Storm Overflow |
| DCWW100802a · 1c347c51 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CURRAN PUMPING STATION, SOUTHWEST CORNER OF DUMBALLS ROAD IND ESTATE, BUTETOWN, CARDIFF | Due 2029-30 | Curran Storm Overflow |
| DCWW101582a · cc3a98a0 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Curran SPS | Due 2029-30 | Curran Storm Overflow |
| DCWW102315a · 78bb562d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DOWLAIS BALACLAVA ROAD BREWERS ARMS | Due 2029-30 | Rocky Road 2 Storm Overflow |
| DCWW102674a · b49b14e6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DOWLAIS BALACLAVA ROAD CWM RHYDYBEDD | Due 2029-30 | Balaclava Road 1 Storm Overflow |
| DCWW102709a · fa5e867b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DOWLAIS MARKET STREET & HIGH STREET JNCT | Due 2029-30 | Market Street Dowlais Storm Overflow |
| DCWW101582a · fc49bc8d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ End of Park Place CSO, Cilfynydd | Due 2029-30 | Park Place Clifnydd 2 Storm Overflow |
| DCWW100809a · 48ecf22f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FERRY ROAD PUMPING STATION | Due 2029-30 | Water body only |
| DCWW100763a · c9a19643 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HARROWBY STREET PUMPING STATION, BUTETOWN, CARDIFF | Due 2029-30 | Harrowby Street Storm Overflow |
| DCWW101582a · c2bf96ed | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ High St CSO, Cefn Coed | Due 2029-30 | Pont-y-Cefn Storm Overflow |
| DCWW102282a · 7642473e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MERTHYR TYDFIL GELLIDEG TAI MAWR ROAD | Due 2029-30 | Tai Mawr Way Storm Overflow |
| DCWW102320a · 54968a8f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MERTHYR TYDFIL GEORGETOWN LINES BRIDGE | Due 2029-30 | Cyfarthfa Road Storm Overflow |
| DCWW102675a · 2ae3fdf1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MERTHYR TYDFIL GOITRE LANE | Due 2029-30 | Goitre Lane Storm Overflow |
| DCWW101460a · db667c87 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Mountain Hare Foul Water PS, Oak Tree Rise/Dan-y-Graig, Ysgubor Newydd, Merthyr Tydfil CF47 0SN | Due 2029-30 | Water body only |
| DCWW102696a · d1a70184 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ OCEAN PARK PS TREMORFA SO | Due 2029-30 | Ocean Park Storm Overflow |
| DCWW102691a · 9634a5eb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PARK PLACE CSO, CILFYNYDD | Due 2029-30 | Park Place Cilfnydd 1 Storm Overflow |
| DCWW101582a · e07f134c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Park Street PS | Due 2029-30 | Park Street Cardiff Storm Overflow |
| DCWW100730a · ad382a64 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PARK STREET STORM SPS, PARK STREET, CARDIFF | Due 2029-30 | Park Street Cardiff Storm Overflow |
| DCWW101582a · 1e59d28e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pavia Courth CSO, Pontypridd | Due 2029-30 | Pavia Court Storm Overflow |
| DCWW102685a · 4d4bbe6a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Phyllis Street CSO Troedyrhiw | Due 2029-30 | Phyllis Street Storm Overflow |
| DCWW102318a · d3f24e1b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPRIDD LOWER MILL STREET | Due 2029-30 | Mill Street Pontypridd Storm Overflow |
| DCWW102285a · ed1f85f7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPRIDD PWLLGWAUN SHEPPARD ST BOWNS G | Due 2029-30 | Mill Street Pontypridd Storm Overflow |
| DCWW102286a · 8d14aa41 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPRIDD WEST STREET | Due 2029-30 | West Street Pontypridd Storm Overflow |
| DCWW102672a · 3a36cbd8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPRIDD YNYSANGHARAD PARK | Due 2029-30 | Ynysangharad Park Bridge Storm Overflow |
| DCWW100781a · 1ac937f2 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PS NO 2 OFF CELEBRITY DRIVE, ATLANTIC WHARF, CARDIFF | Due 2029-30 | Water body only |
| DCWW102274a · ed700905 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ QUAKERS YARD FIDDLERS ELBOW ST CYNONS | Due 2029-30 | Fiddlers Elbow Quakers Yard Storm Overflow |
| DCWW102293a · ae91a39f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ QUAKERS YARD GREENFIELD VICTORIA BRDG TS | Due 2029-30 | Tram Road Side Storm Overflow |
| DCWW101582a · b6ea5471 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rhydfelin CSO Off Lionel Terrace | Due 2029-30 | Lionel Terrace Storm Overflow |
| DCWW100801a · 69f29d57 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SEWAGE PUMPING STATION AT THE REAR OF TAFF STREET, PONTYPRIDD | Due 2029-30 | Taff Street Pontypridd Storm Overflow |
| DCWW101582a · c666d50f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Sion Street Sewage Pumping Station | Due 2029-30 | Sion Street Storm Overflow |
| DCWW100787a · eb4bea96 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SION STREET SPS | Due 2029-30 | Sion Street Storm Overflow |
| DCWW100800a · 8e20f132 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SPS at Triscombe Drive, Llantrisant Road, Cardiff, CF5 2PN | Due 2029-30 | Water body only |
| DCWW100764a · 79b0f81d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SPS AT YNYS BRIDGE, TAFFS WELL | Due 2029-30 | Water body only |
| DCWW100780a · b95ea8cc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SPS OFF SCHOONER WAY, ATLANTIC WHARF, CARDIFF | Due 2029-30 | Water body only |
| DCWW101582a · bc27cf5d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Taff St CSO, Pontypridd | Due 2029-30 | Taff Street Pontypridd Storm Overflow |
| DCWW100717a · 02577461 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TAFFS WELL SPS | Due 2029-30 | Llys Tripp Gwaelod-Y-Garth Overflow |
| DCWW100711a · 811a0d0e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ THE COPPICE PUMPING STATION AT TONTEG, MID GLAMORGAN | Due 2029-30 | Water body only |
| DCWW100848a · a86bed0a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ THORNBURY CLOSE SPS, BIRCHGROVE, CARDIFF | Due 2029-30 | Water body only |
| DCWW101582a · 3982222f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Tongwynlais CSO | Due 2029-30 | Tongwynlais Recreation Ground Storm Overflow |
| DCWW100718a · a8238744 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TONTEG ROAD, UPPER BOAT, CSO & PUMPING STATION EMERGENCY OVERFLOW | Due 2029-30 | Tonteg Road Taff Vale Storm Overflow |
| DCWW102533a · ed20a140 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TREFOREST LEWISTOWN PARK | Due 2029-30 | Treforest Lewistown Park Overflow |
| DCWW101582a · f571a2d8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TRELEWIS CSO - REAR OF GLYNBARGOED | Due 2029-30 | Trelewis Glynbargoed Road Storm Overflow |
| DCWW102273a · 7e1f992e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TROEDYRHIW PONTRHUN BRIDGE | Due 2029-30 | Pontrhun Bridge Storm Overflow |
| DCWW101582a · ab42204a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TROEDYRHIW PS | Due 2029-30 | Troedyrhiw Storm Overflow |
| DCWW100748a · 0a96cca1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TROEDYRHIW PS | Due 2029-30 | Troedyrhiw Storm Overflow |
| DCWW102280a · 8d796a47 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TROEDYRHIW YEW STREET | Due 2029-30 | Troedyrhiw Storm Overflow |
| DCWW102243a · 6411b8da | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ynys Bridge 1 CSO Tongwynlais Cardiff | Due 2029-30 | Ynys Bridge 2 Storm Overflow |
| DCWW102244a · 8e7caedd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ynys Bridge 2 CSO Tongwynlais Cardiff | Due 2029-30 | Ynys Bridge 2 Storm Overflow |
| DCWW101582a · e3b2b58a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ynys Bridge CSO | Due 2029-30 | Ynys Bridge 2 Storm Overflow |
| DCWW101582a · 249b6dc3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YNYSANGHARAD PARK CSO | Due 2029-30 | Ynysangharad Park Pontypridd Storm Overflow |
80 of 80 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.