Before the works
An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.
If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.
When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.
| Overflow | Events | Its works | On record |
|---|---|---|---|
| Clos Pentre St Clears Overflow | 4 | St Clears Wwtw STW | No measure |
| St. Clears Storm Overflow | 1 | St Clears Wwtw STW | Measure linked |
| Llanfyrnach Storm Overflow | 1 | Llanfyrnach | Measure linked |
| Craigwen New Storm Overflow | 1 | St Clears Wwtw STW | Measure linked |
| Narberth East Storm Overflow | 1 | Narberth Wes STW | Measure linked |
| Whitland Bridge Storm Overflow | 1 | Whitland Wwtw Whitland Carms STW | No measure |
| Llanddowror Village Storm Overflow | 1 | St Clears Wwtw STW | Measure linked |
| Lon Hafren St Clears Overflow | 1 | St Clears Wwtw STW | No measure |
| The Grist Storm Overflow | 1 | Laugharne | Measure linked |
What this needs to be reliable
The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.