DonateLog in
River Hub
Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Llanfairfechan Park Crescent Storm Overflow3Llanfairfecn STWNo measure
Llanfairfechan No 1 Storm Overflow2Llanfairfecn STWMeasure linked
Tregarth Bron Ogwen Storm Overflow1Tregarth STWMeasure linked
Tai Craig Y Don Cwm Y Glo Storm Overflow1Llanrug Wwtw STWMeasure linked
Pontllyfni No 3 Storm Overflow1PontllyfniNo measure
Brynrefail Main Storm Overflow1Deiniolen BrynrefailMeasure linked
Llanberis Maes Padarn Storm Overflow1Llanberis STWMeasure linked
Rhedyw Road Llanllyfni Overflow1Llanllyfni C STWNo measure
Caernarfon Seiont Bridge Storm Overflow1Caernarfon STWMeasure linked
Llanllechid Overflow1Bethesda STWMeasure linked
Ysgoldy Storm Overflow1Treborth Bangor STWNo measure
Penaenmawr Station Storm Overflow1PenmaenmawrMeasure linked
Stad Hafod Deiniolen Storm Overflow1Deiniolen BrynrefailNo measure
Aber Storm Overflow1Llanfairfecn STWMeasure linked

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.