A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100067a · 8f490fc0 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BETHESDA STW (FINAL) BETHESDA | Complete 2025-26 | Bethesda WwTW Storm Overflow |
| DCWW100148a · 0916dd4a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CAERNARFON STW | Complete 2025-26 | Caernarfon WwTW Storm Tank Storm Overflow |
| DCWW100242a · 3eb05768 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANAELHAEARN STW | Complete 2025-26 | Llanberis WwTW Storm Overflow |
| DCWW100245a · 6a35eeff | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANBERIS STW (FINAL) LLANBERIS | Complete 2025-26 | Llanberis WwTW Storm Overflow |
| DCWW100263a · 7a2c8ac8 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANFAGLAN WWTW FINAL EFFLUENT | Complete 2025-26 | Llanfaglan WwTW Storm Overflow |
| DCWW100281a · 591eb3b0 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANLLYFNI CAERNARFON STW | Complete 2025-26 | Llanllyfni WwTW Storm Overflow |
| DCWW100287a · 58533ec7 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANRUG WWTW FINAL | Complete 2025-26 | Llanrug WwTW Storm Overflow |
| DCWW100330a · 3dd52a3a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PENISARWAUN WWTW FE | Complete 2025-26 | Penisarwaun WwTW Storm Overflow |
| DCWW100332a · 5287249c | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PENMAENMAWR WWTW PENMAENMAWR | Complete 2025-26 | Near Penmaenmawr Dwygyfylchi Storm Overflow |
| DCWW100343a · 8a6abd0b | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PONTLLYFNI STW | Complete 2025-26 | Pontllyfni STW Storm Overflow |
| DCWW100356a · c502f85a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ RESOLVEN STW STORM TANKS NEATH | Complete 2025-26 | Rhiwlas WwTW Storm Overflow |
| DCWW100359a · c0a769e9 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ RHIWLAS STW | Complete 2025-26 | Rhiwlas WwTW Storm Overflow |
| DCWW100390a · 5762d8e4 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TREFNANT STW | Complete 2025-26 | Bangor Treborth WwTW Storm Overflow |
| DCWW100394a · fa833333 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TREGARON WWTW TREGARON CEREDIGION | Complete 2025-26 | Tregarth WwTW Storm Overflow |
| DCWW100395a · 6216ce10 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TREGARTH | Complete 2025-26 | Tregarth WwTW Storm Overflow |
| DCWW100406a · 3b9b6ced | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ WAUNFAWR STW (FINAL EFFLUENT) | Complete 2025-26 | Waunfawr WwTW Storm Overflow |
| DCWW100414a · df119b40 | W_HR_INV1 | Investigation | Investigation and/or options appraisal to determine impacts of Water Company activities, or permits or licence conditions on a European site or Ramsar site or to determine the costs and technical feasibility of meeting targets. This work will cover Heavily Modified, Water Resources and site and species requirements Biodiv Betws Garmon sewer - Afon Gwyrfai a Llyn Cwellyn SSS/SAC | Due 2026-27 | Water body only |
| DCWW102178a · 37ca2c6d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANBERIS MAES PADARN NRA CASTLE GIFT SH | Due 2026-27 | Llanberis Maes Padarn Storm Overflow |
| DCWW102127a · 2683590f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llwyn Gwalch CSO | Due 2026-27 | Llwyn-y-gwalch Storm Overflow |
| DCWW101894a · c9401e9c | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. WQ Rhiwlas | Due 2026-27 | Rhiwlas WwTW Storm Overflow |
| DCWW100653a · eaafdd9a | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ PONTLLYFNI | Due 2027-28 | Pontllyfni STW Storm Overflow |
| DCWW101167a · 5ce8ab12 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ABERGWYNGREGYN STW | Due 2029-30 | Aber Storm Overflow |
| DCWW101582a · fb732c31 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ANGLESEY ARMS PUMPING STATION | Due 2029-30 | Castle Ditch Storm Overflow |
| DCWW101176a · 381375a1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ANGLESEY ARMS SPS (FORMERLY KNOWN AS CAERNARFON CROWN COURT) | Due 2029-30 | Castle Ditch Storm Overflow |
| DCWW101209a · 9f8fe7d5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BALACLAVA RD SPS, CAERNARFON | Due 2029-30 | B4419 Caernarfon Storm Overflow |
| DCWW102811a · 3b5974eb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BANGOR GORAD Y GYT | Due 2029-30 | Glan Traeth Bangor Overflow |
| DCWW101582a · be3e2738 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BETHEL CSO BETHEL NEAR CAERNARFON | Due 2029-30 | Tan Y Buarth Bethel Storm Overflow |
| DCWW101155a · 52a6a766 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BETHEL SEWAGE TRANSFER PUMPING STATION | Due 2029-30 | Bethel Storm Overflow |
| DCWW101270a · 9ce95110 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BETTWS GARMON SEWAGE PUMPING STATION | Due 2029-30 | Water body only |
| DCWW101582a · 93cde53a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Bontnewydd CSO Ysgol Gynradd Bontne | Due 2029-30 | North of River Bontnewydd Storm Overflow |
| DCWW101229a · b40732f6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Brynrefail Main PS CSO, Brynrefail, Caernarfon LL55 3PB | Due 2029-30 | Brynrefail Main Storm Overflow |
| DCWW101267a · 38413947 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BWLCH Y LLYN PUMPING STATION | Due 2029-30 | Water body only |
| DCWW100630a · 14365ccb | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ CAERNARFON | Due 2029-30 | Caernarfon WwTW Storm Tank Storm Overflow |
| DCWW101582a · ecf3adb1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERNARFON - GLANRHYD SSO NO. | Due 2029-30 | Llanwnda Storm Overflow |
| DCWW101582a · 1039799f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERNARFON - RHOSTRYFAN CSO NO | Due 2029-30 | Rhosgadfan Storm Overflow |
| DCWW102799a · e11206b2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERNARFON BALACLAVA ROAD PS | Due 2029-30 | Crown Street Caernarfon Overflow |
| DCWW101582a · 86d462d7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERNARFON BANK QUAY PS | Due 2029-30 | Bank Quay Caernarfon Storm Overflow |
| DCWW101991a · 4f34d2be | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Caernarfon Hen Gastell No5 | Due 2029-30 | Caernarfon Hen Gastell Storm Overflow |
| DCWW101582a · 506962ad | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERNARFON MARGARET STREET SSO | Due 2029-30 | Margret Street Storm Overflow |
| DCWW101995a · 9e92b31f | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Caernarfon Nantlle No 5 Nra | Due 2029-30 | Nantlle No 5 Caernarfon Storm Overflow |
| DCWW102001a · ba01822e | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Caernarfon Nantlle SPS | Due 2029-30 | B4418 Caernarfon Storm Overflow |
| DCWW101208a · 32374db5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CAERNARFON PONT SEIONT PS | Due 2029-30 | Caernarfon Seiont Bridge Storm Overflow |
| DCWW101582a · 834acaea | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERNARFON PONT SEIONT PS | Due 2029-30 | Caernarfon Seiont Bridge Storm Overflow |
| DCWW101582a · a43037ac | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Caernarfon WWTW Inlet Pump ST 6mm SPS | Due 2029-30 | Caernarfon WwTW Storm Overflow |
| DCWW101325a · fef7301a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CAERNARFON WWTW INLET SPS (10MM) | Due 2029-30 | Caernarfon WwTW Storm Overflow |
| DCWW101327a · b88ba5ed | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COLEG NORMAL SPS, HOLYHEAD RD, BANGOR | Due 2029-30 | Coleg Normal Overflow |
| DCWW102605a · aff87b34 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CROSSVILLE CSO | Due 2029-30 | Crown Street Caernarfon Overflow |
| DCWW101582a · c2a3121a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Pen yr Olchfa Clwt Y Bont Deiniolen | Due 2029-30 | Clwt-y-bont Storm Overflow |
| DCWW102459a · 6d940cef | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Dol Elidir CSO Llanberis | Due 2029-30 | Dôl Eilian Llanberis Storm Overflow |
| DCWW101282a · 7690e092 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FELINHELI SEWAGE PUMPING STATION (ADJACENT TO OLD TOILETS ON THE QUAY) | Due 2029-30 | Port Terrace Felinheli Overflow |
| DCWW101280a · 2e18e358 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FELINHELI SEWAGE PUMPING STATION (OPPOSITE SEA CADETS CORPS) | Due 2029-30 | Glan Y Mor Felinheli Overflow |
| DCWW101281a · 8cd715d4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FELINHELI SEWAGE PUMPING STATION (QUAY COTTAGE) | Due 2029-30 | Hen Gei Llechi Felinheli Main Overflow |
| DCWW101582a · 91a3ac4e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Fron Ogwen PS | Due 2029-30 | Tregarth Bron Ogwen Storm Overflow |
| DCWW101154a · e303b956 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FRON OGWEN PUMPING STATION | Due 2029-30 | Tregarth Bron Ogwen Storm Overflow |
| DCWW101298a · 6154f2e1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ GLANTRAETH ESTATE SPS BANGOR , | Due 2029-30 | Glan Traeth Bangor Overflow |
| DCWW101230a · b76238a9 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ GLASINFRYN SPS | Due 2029-30 | Glasinfryn Storm Overflow |
| DCWW101582a · aea1bbfc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Gyffin PS Morfa Bach Conwy | Due 2029-30 | Caernarfon WwTW Storm Overflow |
| DCWW101286a · 12b2b0b1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANBERIS SEWAGE PUMPING STATION | Due 2029-30 | Market Street Llanberis Storm Overflow |
| DCWW101993a · 2f1425e3 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Llanfaglan STW Storm | Due 2029-30 | Llanfaglan WwTW Storm Overflow |
| DCWW101225a · ad8c7383 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANFAIRFECHAN HOSPITAL SPS | Due 2029-30 | Llanfairfechan A55 Hospital Storm Overflow |
| DCWW101582a · 40d0d91c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANFAIRFECHAN HOSPITAL SPS | Due 2029-30 | Llanfairfechan A55 Hospital Storm Overflow |
| DCWW101582a · e1706b5f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llanfairfechan No 1 CSO | Due 2029-30 | Llanfairfechan No 1 Storm Overflow |
| DCWW101302a · f23ac0f0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANLLECHID SEWAGE PUMPING STATION | Due 2029-30 | Llanllechid Overflow |
| DCWW100675a · 236744b4 | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ LLANLLYFNI | Due 2029-30 | Llanllyfni WwTW Storm Overflow |
| DCWW101994a · 43aa4dfc | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Llanllyfni Glan Aber | Due 2029-30 | Llanllyfni Glan Aber Storm Overflow |
| DCWW100643a · c08a6279 | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ LLANRUG | Due 2029-30 | Llanrug WwTW Storm Overflow |
| DCWW101582a · 1a8a9ad5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MIN-Y-NANT CSO | Due 2029-30 | Llanberis Road Storm Overflow |
| DCWW101214a · db94e951 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NANTLLE PUMPING STATION | Due 2029-30 | B4418 Caernarfon Storm Overflow |
| DCWW102522a · 7f09e5ca | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Peblig Industrial Estate CSO Gwynedd | Due 2029-30 | Caernarfon Llanbeblig Road Storm Overflow |
| DCWW102817a · bb16b074 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penaenmawr CSO | Due 2029-30 | Penaenmawr Station Storm Overflow |
| DCWW101998a · 5d17acb4 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Penisarwaun SWK | Due 2029-30 | Penisarwaun WwTW Storm Overflow |
| DCWW101199a · cd889971 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Penmaenmawr Promenade Sewage Pumping Station | Due 2029-30 | Near Penmaenmawr Dwygyfylchi Storm Overflow |
| DCWW101162a · 72708fbb | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENMAENMAWR WASTE WATER TREATMENT WORKS, PENMAENMAWR, GWYNEDD | Due 2029-30 | Near Penmaenmawr Dwygyfylchi Storm Overflow |
| DCWW101317a · 0b2dafb5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENMAENMAWR WASTE WATER TREATMENT WORKS, PENMAENMAWR, GWYNEDD | Due 2029-30 | Near Penmaenmawr Dwygyfylchi Storm Overflow |
| DCWW101151a · 796890e5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PONT RHYTHALLT PUMPING STATION | Due 2029-30 | Station Road Pontrhythallt Storm Overflow |
| DCWW101152a · 4fb616c0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PONTLLYFNI SEWAGE TREATMENT WORKS | Due 2029-30 | Bridge on A499 Pontllyfni Overflow |
| DCWW101828a · 03a1b1cc | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ RhydDdu STW | Due 2029-30 | Water body only |
| DCWW101582a · cd89e83f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rock Terrace CSO Bethesda | Due 2029-30 | Rock Terrace Storm Overflow |
| DCWW101582a · 815d6e0e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SSO AT MILL LANE CAERNARFON | Due 2029-30 | Mill Lane Caernarfon Storm Overflow |
| DCWW102460a · 1118a4ce | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TAI CRAIG-Y-DON,Cwym Y Glo | Due 2029-30 | Tai Craig Y Don Cwm Y Glo Storm Overflow |
| DCWW101251a · d0cf4231 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Talybont STW | Due 2029-30 | TalyBont WwTW Storm Overflow |
| DCWW101350a · 3a41358d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TERGARTH WASTEWATER TREATMENT WORKS PUMPING STATION | Due 2029-30 | Tregarth WwTW Storm Overflow |
| DCWW101299a · 87068fe6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TREBORTH SEWAGE TREATMENT WORKS | Due 2029-30 | Bangor Treborth WwTW Storm Overflow |
| DCWW101582a · 1e9d24f1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Treborth WwTW (Settled Storm) | Due 2029-30 | Bangor Treborth WwTW Storm Overflow |
| DCWW100681a · cae2a93e | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ TREGARTH | Due 2029-30 | Tregarth WwTW Storm Overflow |
| DCWW101990a · 468640a5 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Waterloo Port CSO | Due 2029-30 | Rhosgadfan Storm Overflow |
| DCWW101195a · 25b1494a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ WATERLOO PORT PUMPING STATION, CAERNARFON | Due 2029-30 | Waterloo Port Road Storm Overflow |
| DCWW101582a · 4761462e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WATERLOO PORT SEWAGE PUMPING ST | Due 2029-30 | Waterloo Port Road Storm Overflow |
| DCWW101829b · afd92fae | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ WAUNFAWR STW | Due 2029-30 | Water body only |
| DCWW101997a · 7a7a839d | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Waunfawr SWK | Due 2029-30 | Waunfawr WwTW Storm Overflow |
90 of 90 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.