DonateLog in
River Hub
Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

90
Measures in this catchment
NEP, current record
74
Still active
not yet past their date
16
Assumed complete
completion date has passed
16
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100067a · 8f490fc0W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BETHESDA STW (FINAL) BETHESDA
Complete 2025-26Bethesda WwTW Storm Overflow
DCWW100148a · 0916dd4aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CAERNARFON STW
Complete 2025-26Caernarfon WwTW Storm Tank Storm Overflow
DCWW100242a · 3eb05768W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANAELHAEARN STW
Complete 2025-26Llanberis WwTW Storm Overflow
DCWW100245a · 6a35eeffW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANBERIS STW (FINAL) LLANBERIS
Complete 2025-26Llanberis WwTW Storm Overflow
DCWW100263a · 7a2c8ac8W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANFAGLAN WWTW FINAL EFFLUENT
Complete 2025-26Llanfaglan WwTW Storm Overflow
DCWW100281a · 591eb3b0W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANLLYFNI CAERNARFON STW
Complete 2025-26Llanllyfni WwTW Storm Overflow
DCWW100287a · 58533ec7W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANRUG WWTW FINAL
Complete 2025-26Llanrug WwTW Storm Overflow
DCWW100330a · 3dd52a3aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PENISARWAUN WWTW FE
Complete 2025-26Penisarwaun WwTW Storm Overflow
DCWW100332a · 5287249cW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PENMAENMAWR WWTW PENMAENMAWR
Complete 2025-26Near Penmaenmawr Dwygyfylchi Storm Overflow
DCWW100343a · 8a6abd0bW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PONTLLYFNI STW
Complete 2025-26Pontllyfni STW Storm Overflow
DCWW100356a · c502f85aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
RESOLVEN STW STORM TANKS NEATH
Complete 2025-26Rhiwlas WwTW Storm Overflow
DCWW100359a · c0a769e9W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
RHIWLAS STW
Complete 2025-26Rhiwlas WwTW Storm Overflow
DCWW100390a · 5762d8e4W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TREFNANT STW
Complete 2025-26Bangor Treborth WwTW Storm Overflow
DCWW100394a · fa833333W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TREGARON WWTW TREGARON CEREDIGION
Complete 2025-26Tregarth WwTW Storm Overflow
DCWW100395a · 6216ce10W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TREGARTH
Complete 2025-26Tregarth WwTW Storm Overflow
DCWW100406a · 3b9b6cedW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
WAUNFAWR STW (FINAL EFFLUENT)
Complete 2025-26Waunfawr WwTW Storm Overflow
DCWW100414a · df119b40W_HR_INV1Investigation
Investigation and/or options appraisal to determine impacts of Water Company activities, or permits or licence conditions on a European site or Ramsar site or to determine the costs and technical feasibility of meeting targets. This work will cover Heavily Modified, Water Resources and site and species requirements
Biodiv
Betws Garmon sewer - Afon Gwyrfai a Llyn Cwellyn SSS/SAC
Due 2026-27Water body only
DCWW102178a · 37ca2c6dW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANBERIS MAES PADARN NRA CASTLE GIFT SH
Due 2026-27Llanberis Maes Padarn Storm Overflow
DCWW102127a · 2683590fW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llwyn Gwalch CSO
Due 2026-27Llwyn-y-gwalch Storm Overflow
DCWW101894a · c9401e9cW_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration.
WQ
Rhiwlas
Due 2026-27Rhiwlas WwTW Storm Overflow
DCWW100653a · eaafdd9aW_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
PONTLLYFNI
Due 2027-28Pontllyfni STW Storm Overflow
DCWW101167a · 5ce8ab12W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ABERGWYNGREGYN STW
Due 2029-30Aber Storm Overflow
DCWW101582a · fb732c31W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ANGLESEY ARMS PUMPING STATION
Due 2029-30Castle Ditch Storm Overflow
DCWW101176a · 381375a1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ANGLESEY ARMS SPS (FORMERLY KNOWN AS CAERNARFON CROWN COURT)
Due 2029-30Castle Ditch Storm Overflow
DCWW101209a · 9f8fe7d5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BALACLAVA RD SPS, CAERNARFON
Due 2029-30B4419 Caernarfon Storm Overflow
DCWW102811a · 3b5974ebW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BANGOR GORAD Y GYT
Due 2029-30Glan Traeth Bangor Overflow
DCWW101582a · be3e2738W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BETHEL CSO BETHEL NEAR CAERNARFON
Due 2029-30Tan Y Buarth Bethel Storm Overflow
DCWW101155a · 52a6a766W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BETHEL SEWAGE TRANSFER PUMPING STATION
Due 2029-30Bethel Storm Overflow
DCWW101270a · 9ce95110W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BETTWS GARMON SEWAGE PUMPING STATION
Due 2029-30Water body only
DCWW101582a · 93cde53aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Bontnewydd CSO Ysgol Gynradd Bontne
Due 2029-30North of River Bontnewydd Storm Overflow
DCWW101229a · b40732f6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Brynrefail Main PS CSO, Brynrefail, Caernarfon LL55 3PB
Due 2029-30Brynrefail Main Storm Overflow
DCWW101267a · 38413947W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BWLCH Y LLYN PUMPING STATION
Due 2029-30Water body only
DCWW100630a · 14365ccbW_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
CAERNARFON
Due 2029-30Caernarfon WwTW Storm Tank Storm Overflow
DCWW101582a · ecf3adb1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAERNARFON - GLANRHYD SSO NO.
Due 2029-30Llanwnda Storm Overflow
DCWW101582a · 1039799fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAERNARFON - RHOSTRYFAN CSO NO
Due 2029-30Rhosgadfan Storm Overflow
DCWW102799a · e11206b2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAERNARFON BALACLAVA ROAD PS
Due 2029-30Crown Street Caernarfon Overflow
DCWW101582a · 86d462d7W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAERNARFON BANK QUAY PS
Due 2029-30Bank Quay Caernarfon Storm Overflow
DCWW101991a · 4f34d2beW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Caernarfon Hen Gastell No5
Due 2029-30Caernarfon Hen Gastell Storm Overflow
DCWW101582a · 506962adW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAERNARFON MARGARET STREET SSO
Due 2029-30Margret Street Storm Overflow
DCWW101995a · 9e92b31fW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Caernarfon Nantlle No 5 Nra
Due 2029-30Nantlle No 5 Caernarfon Storm Overflow
DCWW102001a · ba01822eW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Caernarfon Nantlle SPS
Due 2029-30B4418 Caernarfon Storm Overflow
DCWW101208a · 32374db5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CAERNARFON PONT SEIONT PS
Due 2029-30Caernarfon Seiont Bridge Storm Overflow
DCWW101582a · 834acaeaW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAERNARFON PONT SEIONT PS
Due 2029-30Caernarfon Seiont Bridge Storm Overflow
DCWW101582a · a43037acW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Caernarfon WWTW Inlet Pump ST 6mm SPS
Due 2029-30Caernarfon WwTW Storm Overflow
DCWW101325a · fef7301aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CAERNARFON WWTW INLET SPS (10MM)
Due 2029-30Caernarfon WwTW Storm Overflow
DCWW101327a · b88ba5edW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
COLEG NORMAL SPS, HOLYHEAD RD, BANGOR
Due 2029-30Coleg Normal Overflow
DCWW102605a · aff87b34W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CROSSVILLE CSO
Due 2029-30Crown Street Caernarfon Overflow
DCWW101582a · c2a3121aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Pen yr Olchfa Clwt Y Bont Deiniolen
Due 2029-30Clwt-y-bont Storm Overflow
DCWW102459a · 6d940cefW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Dol Elidir CSO Llanberis
Due 2029-30Dôl Eilian Llanberis Storm Overflow
DCWW101282a · 7690e092W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FELINHELI SEWAGE PUMPING STATION (ADJACENT TO OLD TOILETS ON THE QUAY)
Due 2029-30Port Terrace Felinheli Overflow
DCWW101280a · 2e18e358W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FELINHELI SEWAGE PUMPING STATION (OPPOSITE SEA CADETS CORPS)
Due 2029-30Glan Y Mor Felinheli Overflow
DCWW101281a · 8cd715d4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FELINHELI SEWAGE PUMPING STATION (QUAY COTTAGE)
Due 2029-30Hen Gei Llechi Felinheli Main Overflow
DCWW101582a · 91a3ac4eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Fron Ogwen PS
Due 2029-30Tregarth Bron Ogwen Storm Overflow
DCWW101154a · e303b956W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FRON OGWEN PUMPING STATION
Due 2029-30Tregarth Bron Ogwen Storm Overflow
DCWW101298a · 6154f2e1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
GLANTRAETH ESTATE SPS BANGOR ,
Due 2029-30Glan Traeth Bangor Overflow
DCWW101230a · b76238a9W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
GLASINFRYN SPS
Due 2029-30Glasinfryn Storm Overflow
DCWW101582a · aea1bbfcW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Gyffin PS Morfa Bach Conwy
Due 2029-30Caernarfon WwTW Storm Overflow
DCWW101286a · 12b2b0b1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANBERIS SEWAGE PUMPING STATION
Due 2029-30Market Street Llanberis Storm Overflow
DCWW101993a · 2f1425e3W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Llanfaglan STW Storm
Due 2029-30Llanfaglan WwTW Storm Overflow
DCWW101225a · ad8c7383W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANFAIRFECHAN HOSPITAL SPS
Due 2029-30Llanfairfechan A55 Hospital Storm Overflow
DCWW101582a · 40d0d91cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANFAIRFECHAN HOSPITAL SPS
Due 2029-30Llanfairfechan A55 Hospital Storm Overflow
DCWW101582a · e1706b5fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llanfairfechan No 1 CSO
Due 2029-30Llanfairfechan No 1 Storm Overflow
DCWW101302a · f23ac0f0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANLLECHID SEWAGE PUMPING STATION
Due 2029-30Llanllechid Overflow
DCWW100675a · 236744b4W_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
LLANLLYFNI
Due 2029-30Llanllyfni WwTW Storm Overflow
DCWW101994a · 43aa4dfcW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Llanllyfni Glan Aber
Due 2029-30Llanllyfni Glan Aber Storm Overflow
DCWW100643a · c08a6279W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
LLANRUG
Due 2029-30Llanrug WwTW Storm Overflow
DCWW101582a · 1a8a9ad5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MIN-Y-NANT CSO
Due 2029-30Llanberis Road Storm Overflow
DCWW101214a · db94e951W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NANTLLE PUMPING STATION
Due 2029-30B4418 Caernarfon Storm Overflow
DCWW102522a · 7f09e5caW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Peblig Industrial Estate CSO Gwynedd
Due 2029-30Caernarfon Llanbeblig Road Storm Overflow
DCWW102817a · bb16b074W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Penaenmawr CSO
Due 2029-30Penaenmawr Station Storm Overflow
DCWW101998a · 5d17acb4W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Penisarwaun SWK
Due 2029-30Penisarwaun WwTW Storm Overflow
DCWW101199a · cd889971W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Penmaenmawr Promenade Sewage Pumping Station
Due 2029-30Near Penmaenmawr Dwygyfylchi Storm Overflow
DCWW101162a · 72708fbbW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PENMAENMAWR WASTE WATER TREATMENT WORKS, PENMAENMAWR, GWYNEDD
Due 2029-30Near Penmaenmawr Dwygyfylchi Storm Overflow
DCWW101317a · 0b2dafb5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PENMAENMAWR WASTE WATER TREATMENT WORKS, PENMAENMAWR, GWYNEDD
Due 2029-30Near Penmaenmawr Dwygyfylchi Storm Overflow
DCWW101151a · 796890e5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PONT RHYTHALLT PUMPING STATION
Due 2029-30Station Road Pontrhythallt Storm Overflow
DCWW101152a · 4fb616c0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PONTLLYFNI SEWAGE TREATMENT WORKS
Due 2029-30Bridge on A499 Pontllyfni Overflow
DCWW101828a · 03a1b1ccW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
RhydDdu STW
Due 2029-30Water body only
DCWW101582a · cd89e83fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Rock Terrace CSO Bethesda
Due 2029-30Rock Terrace Storm Overflow
DCWW101582a · 815d6e0eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SSO AT MILL LANE CAERNARFON
Due 2029-30Mill Lane Caernarfon Storm Overflow
DCWW102460a · 1118a4ceW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TAI CRAIG-Y-DON,Cwym Y Glo
Due 2029-30Tai Craig Y Don Cwm Y Glo Storm Overflow
DCWW101251a · d0cf4231W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Talybont STW
Due 2029-30TalyBont WwTW Storm Overflow
DCWW101350a · 3a41358dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
TERGARTH WASTEWATER TREATMENT WORKS PUMPING STATION
Due 2029-30Tregarth WwTW Storm Overflow
DCWW101299a · 87068fe6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
TREBORTH SEWAGE TREATMENT WORKS
Due 2029-30Bangor Treborth WwTW Storm Overflow
DCWW101582a · 1e9d24f1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Treborth WwTW (Settled Storm)
Due 2029-30Bangor Treborth WwTW Storm Overflow
DCWW100681a · cae2a93eW_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
TREGARTH
Due 2029-30Tregarth WwTW Storm Overflow
DCWW101990a · 468640a5W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Waterloo Port CSO
Due 2029-30Rhosgadfan Storm Overflow
DCWW101195a · 25b1494aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
WATERLOO PORT PUMPING STATION, CAERNARFON
Due 2029-30Waterloo Port Road Storm Overflow
DCWW101582a · 4761462eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
WATERLOO PORT SEWAGE PUMPING ST
Due 2029-30Waterloo Port Road Storm Overflow
DCWW101829b · afd92faeW_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
WAUNFAWR STW
Due 2029-30Water body only
DCWW101997a · 7a7a839dW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Waunfawr SWK
Due 2029-30Waunfawr WwTW Storm Overflow

90 of 90 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.