Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The River Rhymney is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

39
Above the 2050 cap
of 61 tracked
22
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
22
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Bedwellty Road Bridge Storm Overflow
DCWW703
2050142 ·22
155
0 events
+9%15.5×Rising
Cardiff Kimberley Road Storm Overflow
DCWW2277
205036 ·22
117
0 events
+225%11.7×Rising
Glan-yr-afon Lane 2 Storm Overflow
DCWW1693
205096 ·22
110
0 events
+15%11×Rising
Plas Machen Storm Overflow
DCWW806
205098 ·22
102
0 events
+4%10.2×Rising
Abertysswg Troedrhiwfuwch Storm Overflow
DCWW1388
205089 ·22
92
0 events
+3%9.2×Rising
Pontlottyn Old Gasworks Storm Overflow
DCWW1563
205023 ·22
89
0 events
+287%8.9×Rising
Cardiff Central Storm Overflow
DCWW1025
205054 ·22
84
0 events
+56%8.4×Rising
Oaks End Close Footbridge Storm Overflow
DCWW535
205044 ·22
75
0 events
+70%7.5×Rising
Twyn Road Ystrad Mynach Storm Overflow
DCWW950
205094 ·22
72
0 events
-23%7.2×Falling — behind
Deri Riverside Walk Bargoed Storm Overflow
DCWW1313
205061 ·22
68
0 events
+11%6.8×Rising
A472 Maesycwmmer Storm Overflow
DCWW1393
205074 ·22
66
0 events
-11%6.6×Falling — behind
William Street Tir-y-berth Storm Overflow
DCWW490
205068 ·22
63
0 events
-7%6.3×Falling — behind
Bryn Siriol Storm Overflow
DCWW1968
205071 ·22
59
0 events
-17%5.9×Falling — behind
Rhymney Walk Storm Overflow
DCWW488
205075 ·22
58
0 events
-23%5.8×Falling — behind
The Terrace Rhymney Storm Overflow
DCWW727
205043 ·22
58
0 events
+35%5.8×Rising
Ystrad Mynach Bridge Storm Overflow
DCWW377
205070 ·22
57
0 events
-19%5.7×Falling — behind
Bargoed Old Colliery Washery Storm Overflow
DCWW456
205059 ·22
55
0 events
-7%5.5×Falling — behind
Bethania Cottages Storm Overflow
DCWW1820
205082 ·22
54
0 events
-34%5.4×Falling — behind
River Terrace Pengham Storm Overflow
DCWW487
205044 ·22
49
0 events
+11%4.9×Rising
Carno Street Storm Overflow
DCWW434
205064 ·22
48
0 events
-25%4.8×Falling — behind
Factory Road Field Storm Overflow
DCWW608
205030 ·23
47
0 events
+57%4.7×Rising
Pontlottyn Recreation Ground Storm Overflow
DCWW799
205040 ·22
46
0 events
+15%4.6×Rising
Ball Lane Storm Overflow
DCWW1059
2050145 ·22
45
0 events
-69%4.5×Falling — behind
Heol Y Waun Storm Overflow
DCWW579
205041 ·22
43
0 events
+5%4.3×Rising
Cardiff Eastern Long Sea Outfall Storm Overflow
DCWW2159
205059 ·22
41
0 events
-31%4.1×Falling — behind
Caerphilly Bypass Supermarket Storm Overflow
DCWW670
205020 ·22
40
0 events
+100%4×Rising
Woodland Place Storm Overflow
DCWW474
205025 ·22
40
0 events
+60%4×Rising
New Tredegar Business Park West Storm Overflow
DCWW1562
205032 ·22
38
0 events
+19%3.8×Rising
Trelyn Lane Storm Overflow
DCWW1965
205033 ·22
37
0 events
+12%3.7×Rising
Pengam Road Roundabout Aberbargoed Storm Overflow
DCWW816
205045 ·22
36
0 events
-20%3.6×Falling — behind
Heathwood Road Storm Overflow
DCWW944
205029 ·22
27
0 events
-7%2.7×Falling — behind
Forge Road Bassaleg Storm Overflow
DCWW2078
20509 ·22
25
0 events
+178%2.5×Rising
Pant Glas Industrial Estate Storm Overflow
DCWW530
205033 ·22
24
0 events
-27%2.4×Falling — behind
Graig-y-fedw Storm Overflow
DCWW1816
205084 ·22
19
0 events
-77%1.9×Falling — behind
Bargoed Viaduct Storm Overflow
DCWW1378
205045 ·22
18
0 events
-60%1.8×Falling — behind
Coopers Court Storm Overflow
DCWW1332
205028 ·22
17
0 events
-39%1.7×Falling — behind
Bryngoleu Street Blackwood Overflow
DCWW1829
20509 ·22
17
0 events
+89%1.7×Rising
Commercial Street Senghenydd Storm Overflow
DCWW1771
205011 ·22
17
0 events
+55%1.7×Rising
High Street Gant-y-nant Storm Overflow
DCWW1519
20508 ·22
12
0 events
+50%1.2×Rising
Bargoed Station Road Storm Overflow
DCWW1379
20500 ·22
10
0 events
—1×Within the cap
Fishpond Road Storm Overflow
DCWW603
20504 ·22
10
0 events
+150%1×Within the cap
Main Road Maesycwmmer Overflow
DCWW2345
20509 ·25
9
0 events
0%0.9×—Within the cap
Senghenydd Storm Overflow
DCWW772
205018 ·22
8
0 events
-56%0.8×Within the cap
Glan-y-nant Riverside Path Storm Overflow
DCWW1283
20505 ·24
6
1 events
+20%0.6×Within the cap
Riverside Park Trethomas Storm Overflow
DCWW486
20504 ·22
6
0 events
+50%0.6×Within the cap
Forge Road Machen Overflow
DCWW1611
20506 ·22
6
0 events
0%0.6×Within the cap
Windsor Place Storm Overflow
DCWW1409
205013 ·22
6
0 events
-54%0.6×Within the cap
Dowlands Way Cardiff Storm Overflow
DCWW2247
20502 ·22
4
0 events
+100%0.4×Within the cap
Trelyn Park Storm Overflow
DCWW391
20500 ·22
4
0 events
—0.4×Within the cap
Brithdir Station Storm Overflow
DCWW689
20503 ·22
3
1 events
0%0.3×Within the cap
Church Street Ystrad Mynach Overflow
DCWW1591
20500 ·22
3
0 events
—0.3×Within the cap
St. Mellons Bridge Road Storm Overflow
DCWW752
20502 ·22
1
0 events
-50%0.1×Within the cap
Began Road Cardiff Storm Overflow
DCWW702
20501 ·25
1
1 events
0%0.1×—Within the cap
Birchgrove New Tredegar Storm Overflow
DCWW1370
20501 ·22
1
0 events
0%0.1×Within the cap
Coedcae Road Abertridwr Storm Overflow
DCWW645
20502 ·22
1
0 events
-50%0.1×Within the cap
Cardiff Pen-y-lan Road Storm Overflow
DCWW2168
20500 ·22
0
0 events
—0×Within the cap
Westville Rhymney Overflow
DCWW1586
20500 ·22
0
0 events
—0×Within the cap
Victoria Road Fleur-de-lis Storm Overflow
DCWW894
20500 ·22
0
0 events
—0×—Within the cap
New Road Roundabout Storm Overflow
DCWW1463
20500 ·22
0
0 events
—0×Within the cap
William Street Fleur-de-lis Storm Overflow
DCWW493
20500 ·22
0
0 events
—0×Within the cap
Church Street Rear Ystrad Mynnach Storm Overflow
DCWW1341
20500 ·22
0
0 events
—0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →