NRW sampling point

Scouring Brook Upstream @ Track

Sampled by Natural Resources Wales on 11 visits from 2022 to 2024.

No phosphate, ammonia or dissolved-oxygen tests here in this period. Every other reading is below.

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative:Natural Resources Wales’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: PCB - 028 (µg/l)

NRW sampling point S5720044 · 92 readings of 19 tests since 2023.

DateResultUnitSample
2024-11-26 10:52< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-11-07 12:00< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-10-31 11:48< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-10-10 12:00< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-09-12 12:38< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-06-15 10:34< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-05-30 11:10< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-03-16 10:35< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-02-20 10:45< 0.001µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)

Source: Natural Resources Wales Open Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the River Rhymney.

Scouring Brook Upstream @ Track: NRW water tests — Afon Rhymni / River Rhymney Data