What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08TW100557 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BICESTER STW | Complete 2025-26 | Bicester STW |
| 08TW100559 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BLETCHINGDON STW | Complete 2025-26 | Bletchingdon STW |
| 08TW100574 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CHARLTON-ON-OTMOOR STW | Complete 2025-26 | Charlton-on-Otmoor STW |
| 08TW100704 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CONSTABLES PIECE SEWAGE TREATMENT WORKS | Complete 2025-26 | Oxon Ray (upstream A41 to Cherwell) including Otmoor |
| 08TW100613 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) GRENDON UNDERWOOD SEWAGE WORKS | Complete 2025-26 | Ray and tributaries NorthEast of Grendon Underwood |
| 08TW100629 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) ISLIP STW | Complete 2025-26 | Islip STW |
| 08TW100639 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) LUDGERSHALL STW | Complete 2025-26 | Ludgershall STW |
| 08TW100641 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MARSH GIBBON STW | Complete 2025-26 | Marsh Gibbon STW |
| 08TW100723 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MIDDLETON STONEY STW | Complete 2025-26 | Middleton Stoney STW |
| 08TW100682 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WESTON-ON-THE-GREEN SEWAGE WORKS | Complete 2025-26 | Gallos Brook |
| 08TW101398 · a | WFD_ND | No deterioration | mg/l Amm permit at Marsh Gibbon STW Reduce ammonia loading | Complete 2025-26 | Summerstown Ditch and Launton and Cutters Brook |
| 08TW101574 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BICESTER STW | Due 2026-27 | Bicester STW |
| 08TW101575 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BLETCHINGDON STW | Due 2026-27 | Bletchingdon STW |
| 08TW100423 · a | U_MON4 | Monitoring | Install and run event-duration monitoring CHARLTON-ON-OTMOOR STW | Due 2026-27 | Charlton-on-Otmoor STW |
| 08TW101591 · a | U_MON4 | Monitoring | Install and run event-duration monitoring GRENDON UNDERWOOD SEWAGE WORKS | Due 2026-27 | Ray and tributaries NorthEast of Grendon Underwood |
| 08TW100352 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) ISLIP STW | Due 2026-27 | Islip STW |
| 08TW100363 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) LUDGERSHALL STW | Due 2026-27 | Ludgershall STW |
| 08TW101598 · a | U_MON4 | Monitoring | Install and run event-duration monitoring MARSH GIBBON STW | Due 2026-27 | Marsh Gibbon STW |
| 08TW100367 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) MIDDLETON STONEY STW | Due 2026-27 | Middleton Stoney STW |
| 08TW100452 · a | U_MON4 | Monitoring | Install and run event-duration monitoring WESTON-ON-THE-GREEN SEWAGE WORKS | Due 2026-27 | Gallos Brook |
| 08TW100065 · a | WFD_NDLS_Chem2 | No deterioration | Bicester STW, cypermethrin, 0.000425ug Reduce cypermethrin loading | Due 2026-27 | Langford Brook (Bicester to Ray inc Gagle Brook) |
| 08TW100109 · a | WFD_NDLS_Chem2 | No deterioration | Bicester STW, Nonylphenol, 0.87 ug Reduce Nonylphenol loading | Due 2026-27 | Langford Brook (Bicester to Ray inc Gagle Brook) |
| 08TW101108 · tb | EnvAct_INV4 | Investigation | Storm Overflows investigation BLETCHINGDON WWTW- Storm Overflows investigation | Due 2027-28 | Bletchingdon Stream |
| 08TW101108 · ti | EnvAct_INV4 | Investigation | Storm Overflows investigation GRENDON UNDERWOOD WWTW- Storm Overflows investigation | Due 2027-28 | Ray and tributaries NorthEast of Grendon Underwood |
| 08TW101108 · ag | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at BICESTER STW | Due 2027-28 | Langford Brook (Bicester to Ray inc Gagle Brook) |
| 08TW101108 · an | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at CHARLTON-ON-OTMOOR STW | Due 2027-28 | Oxon Ray (upstream A41 to Cherwell) including Otmoor |
| 08TW100190 · a | WFD_INV_MOD | Investigation | Investigate the cause of the spills WFD Investigation of in river Dissolved Oxygen to inform future action | Due 2027-28 | Langford Brook (Bicester to Ray inc Gagle Brook) |
| 08TW100191 · a | WFD_INV_MOD | Investigation | Investigate the cause of the spills WFD Investigation to inform future action | Due 2027-28 | Ludgershall Brook and Muswellhill Brook |
| 08TW100195 · a | WFD_INV_MOD | Investigation | Investigate the cause of the spills WFD Investigation to inform future action | Due 2027-28 | Summerstown Ditch and Launton and Cutters Brook |
| 08TW100983 · a | U_IMP4 | Improvement | Storm Overflows improvements at BLETCHINGDON STW Storm Overflows action at BLETCHINGDON STW | Due 2027-28 | Bletchingdon Stream |
| 08TW100953 · a | EnvAct_IMP1 | Improvement | 0.5 mg/l Phosphorus permit at Ashendon STW Reduce Phosphorus Loadings at Ashendon STW | Due 2029-30 | Tetchwick Brook, Source to Ray and tribs |
| 08TW100872 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Bicester STW Reduce Phosphorus Loadings at Bicester STW | Due 2029-30 | Langford Brook (Bicester to Ray inc Gagle Brook) |
| 08TW100874 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Bletchingdon STW Reduce Phosphorus Loadings at Bletchingdon STW | Due 2029-30 | Bletchingdon Stream |
| 08TW100861 · a | EnvAct_IMP1 | Improvement | 1 mg/l Phosphorus permit at Charlton-on-Otmoor STW Reduce Phosphorus Loadings at Charlton-on-Otmoor STW | Due 2029-30 | Oxon Ray (upstream A41 to Cherwell) including Otmoor |
| 08TW100218 · a | WFD_IMPg | Improvement | 1.5mg/l at Grendon Underwood STW Reduce Phosphorus loadings at Grendon Underwood STW,1.5mg/l | Due 2029-30 | Ray and tributaries NorthEast of Grendon Underwood |
| 08TW100992 · a | ENVAct_IMP2 | Improvement | Option C2: 1,080m2 wetland equivalent treatment, 1.08 Ha SUDS IA Removal, 41m3 storage - No screen required Storm Overflows action at CHARLTON-ON-OTMOOR STW | Due 2029-30 | Oxon Ray (upstream A41 to Cherwell) including Otmoor |
| 11TW100087 · a | ENVAct_IMP2 | Improvement | Storm Overflows improvements at Constable's Piece (Beckley) STW Storm Overflows action at Constable's Piece (Beckley) STW | Due 2029-30 | Oxon Ray (upstream A41 to Cherwell) including Otmoor |
| 08TW101011 · a | EnvAct_IMP2 | Improvement | Option C1: Solution in AMP 08: 1,374m of sewer relining, 304m3 storage, 0.56Ha SUDS IA Removal, No screen required Storm Overflows action at GRENDON UNDERWOOD STW | Due 2029-30 | Ray and tributaries NorthEast of Grendon Underwood |
38 of 38 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.