Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The Ogmore and Kenfig is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

42
Above the 2050 cap
of 67 tracked
28
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
25
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Talbot Street Maesteg Storm Overflow
DCWW1084
2050283 ·22
132
0 events
-53%13.2×Falling — behind
Llangeinor Bettws Street Storm Overflow
DCWW1669
2050350 ·22
124
0 events
-65%12.4×Falling — behind
Gwendoline Street Sports Ground Storm Overflow
DCWW1263
205095 ·22
123
0 events
+29%12.3×Rising
Pontycymmer Fenton Place Storm Overflow
DCWW1120
2050129 ·22
121
0 events
-6%12.1×Falling — behind
Garth Heol Faen Storm Overflow
DCWW2210
2050134 ·22
113
0 events
-16%11.3×Falling — behind
Off Glan-yr-afon Road Cwmfelin Maesteg Storm Overflow
DCWW1162
2050224 ·22
107
0 events
-52%10.7×Falling — behind
St John Street Ogmore Vale Storm Overflow
DCWW1092
205056 ·22
103
0 events
+84%10.3×Rising
Station Row Storm Overflow
DCWW1398
2050340 ·22
97
0 events
-71%9.7×Falling — behind
Commercial Street Nant Y Moel Storm Overflow
DCWW1004
205082 ·22
88
0 events
+7%8.8×Rising
Craig Tal Y Fan Blackmill Storm Overflow
DCWW999
205083 ·22
87
0 events
+5%8.7×Rising
Caerau Square Storm Overflow
DCWW2211
2050103 ·22
87
0 events
-16%8.7×Falling — behind
Penybont Wwtw Storm Overflow
DCWW516
205047 ·22
87
0 events
+85%8.7×Rising
Hermon Road Storm Overflow
DCWW936
205083 ·22
81
0 events
-2%8.1×Falling — behind
Rear of Elm Street Gilfach Goch Storm Overflow
DCWW2233
205062 ·22
74
0 events
+19%7.4×Rising
Llanharan Storage Storm Overflow
DCWW2230
205070 ·22
74
0 events
+6%7.4×Rising
Marlas Storm Overflow
DCWW863
205024 ·22
70
0 events
+192%7×Rising
Llandow Storm Overflow
DCWW2172
205038 ·22
67
0 events
+76%6.7×Rising
Pant Yr Awel Lewistown Storm Overflow
DCWW2208
2050131 ·22
61
0 events
-53%6.1×Falling — behind
Dan-y-bryn Gilfach Goch Storm Overflow
DCWW622
205050 ·22
61
0 events
+22%6.1×Rising
Riverside Aberkenfig Storm Overflow
DCWW783
205021 ·22
52
0 events
+148%5.2×Rising
Llysworney Storm Overflow
DCWW1970
20502 ·22
51
0 events
+2450%5.1×Rising
Caerau Road Storm Overflow
DCWW673
205018 ·22
50
0 events
+178%5×Rising
Bangor Street Nantyffyllon Storm Overflow
DCWW1057
205014 ·22
49
0 events
+250%4.9×Rising
Hendre Road Pencoed Storm Overflow
DCWW1257
205038 ·22
48
0 events
+26%4.8×Rising
Commercial Place Pontycymer Overflow
DCWW1645
205034 ·22
44
0 events
+29%4.4×Rising
Maesteg Bridgend Road Storm Overflow
DCWW2236
205040 ·22
41
0 events
+3%4.1×Rising
Mack Worth Road Overflow
DCWW244
205032 ·22
39
0 events
+22%3.9×Rising
Bron-y-waun Maesteg Storm Overflow
DCWW1039
205027 ·22
39
1 events
+44%3.9×Rising
Llangan Storm Overflow
DCWW2297
20503 ·22
37
0 events
+1133%3.7×Rising
North Treoes Bridge Storm Overflow
DCWW537
20507 ·22
30
0 events
+329%3×Rising
Bridgend Road Maesteg Overflow
DCWW2073
20501 ·22
28
0 events
+2700%2.8×Rising
East Cricklewood Close Bridgend Overflow
DCWW1641
20509 ·22
26
0 events
+189%2.6×Rising
Church Street Maesteg Storm Overflow
DCWW1950
205020 ·22
23
0 events
+15%2.3×Rising
West Cricklewood Close Bridgend Overflow
DCWW1622
20507 ·22
19
0 events
+171%1.9×Rising
Ogmore Valley Water Street Storm Overflow
DCWW1161
205019 ·22
19
0 events
0%1.9×Falling — behind
Cwrt Gwalia Storm Overflow
DCWW990
205058 ·22
18
0 events
-69%1.8×Falling — behind
Maesteg Market Storm Overflow
DCWW868
205055 ·22
17
0 events
-69%1.7×Falling — behind
Castle Street Maesteg Storm Overflow
DCWW1954
205016 ·22
16
0 events
0%1.6×Falling — behind
Victoria Street Storm Overflow
DCWW1206
205015 ·22
15
0 events
0%1.5×Nearly there
Ty-isaf Road Storm Overflow
DCWW1863
20502 ·22
15
0 events
+650%1.5×Rising
Maesteg Paddock Wood Storm Overflow
DCWW1188
20500 ·22
14
0 events
—1.4×Rising
Milton Drive Bridgend Storm Overflow
DCWW1182
20505 ·22
13
0 events
+160%1.3×Rising
Riverside Coytrahen Overflow
DCWW1416
205011 ·22
10
0 events
-9%1×Within the cap
River Street Ogmore Vale Storm Overflow
DCWW1107
20505 ·22
10
0 events
+100%1×Within the cap
Beach Road Porthcawl 1 Storm Overflow
DCWW336
20506 ·22
9
0 events
+50%0.9×Within the cap
Heol Bryncwils Storm Overflow
DCWW1255
20504 ·22
8
0 events
+100%0.8×Within the cap
Oakfield Terrace Storm Overflow
DCWW1163
20500 ·22
8
0 events
—0.8×Within the cap
Heol-y-llwyni Rear Storm Overflow
DCWW1812
20504 ·22
6
0 events
+50%0.6×Within the cap
Colwinston Storm Overflow
DCWW1604
20501 ·22
5
1 events
+400%0.5×Within the cap
Ewenny No.1 Overflow
DCWW967
20501 ·22
5
0 events
+400%0.5×Within the cap
Pant Bach Storm Overflow
DCWW2218
20500 ·22
5
0 events
—0.5×Within the cap
Railway Terrace Ogmore Vale Storm Overflow
DCWW1112
20500 ·22
4
0 events
—0.4×Within the cap
Fulmar Road Storm Overflow
DCWW52
20500 ·22
3
0 events
—0.3×Within the cap
High Street Pontycymer Overflow
DCWW1817
20501 ·22
2
0 events
+100%0.2×Within the cap
Heol Las Play Area Storm Overflow
DCWW2228
20500 ·22
1
0 events
—0.1×Within the cap
Bridgend Road Llanharan Overflow
DCWW1365
20501 ·22
1
0 events
0%0.1×Within the cap
Lon-y-cariadon Storm Overflow
DCWW1190
20500 ·22
1
0 events
—0.1×Within the cap
Fern Street Storm Overflow
DCWW2017
20500 ·22
1
0 events
—0.1×Within the cap
Glannant Road Storm Overflow
DCWW1590
20500 ·22
1
0 events
—0.1×Within the cap
Beach Road Porthcawl 2 Storm Overflow
DCWW372
20501 ·25
1
1 events
0%0.1×—Within the cap
Sanderling Close Storm Overflow
DCWW1831
20500 ·22
0
0 events
—0×Within the cap
Cuckoo Street Pontycymer Overflow
DCWW2091
20507 ·22
0
0 events
-100%0×Within the cap
Newbridge Fields Storm Overflow
DCWW1167
20503 ·22
0
0 events
-100%0×Within the cap
Bridgend Off Hearts of Oak Cottages Storm Overflow
DCWW1765
20500 ·22
0
0 events
—0×Within the cap
Ty Draw Lane Overflow
DCWW2219
20500 ·22
0
0 events
—0×Within the cap
Pontycymmer Richard Street Storm Overflow
DCWW2209
20500 ·22
0
0 events
—0×Within the cap
St John Street Overflow
DCWW2334
20501 ·24
0
0 events
-100%0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →