What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100269a · 58c2bb53 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANGAFFO STW | Complete 2025-26 | Lletty Brongu WwTW Storm Overflow |
| DCWW100297a · 2dfb9c36 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLETTY BRONGU STW LLANGYNWYD MAESTG | Complete 2025-26 | Lletty Brongu WwTW Storm Overflow |
| DCWW100337a · bf2ef43c | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PENY BONT SEWAGE TREATMENT WORKS | Complete 2025-26 | Penybont WwTW Storm Overflow |
| DCWW100410a · 889018f7 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ WICK SEWAGE TREATMENT WORKS | Complete 2025-26 | Wick WwTW Overflow |
| DCWW102175a · 4e089d06 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ 4 Maesgwyn CSO Maesteg | Due 2026-27 | Bron-y-Waun Maesteg Storm Overflow |
| DCWW102177a · 4138b556 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERAU ROAD CSO | Due 2026-27 | Caerau Road Storm Overflow |
| DCWW102170a · ed08a218 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ COLWINSTON PS | Due 2026-27 | Colwinston Storm Overflow |
| DCWW102141a · 874f281e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CRAIG TAL-Y-FAN BLACKMILL | Due 2026-27 | Craig Tal Y Fan Blackmill Storm Overflow |
| DCWW101640a · 6a67495a | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. WQ CREIGIAU | Due 2026-27 | WICK |
| DCWW102176a · 72b82a73 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Maesteg Market CSO | Due 2026-27 | Talbot Street Maesteg Storm Overflow |
| DCWW102653a · 7afd6edf | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Nr 11 Maesteg Row CSO | Due 2026-27 | Maesteg Row Maesteg Storm Overflow |
| DCWW102174a · 6b84c1cc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ VICTORIA STREET CSO PONTYCWMMER | Due 2026-27 | Victoria Street Storm Overflow |
| DCWW101915a · 898f40a2 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ 25 Cricklewood Close CSO Bridgend | Due 2029-30 | East Cricklewood Close Bridgend Overflow |
| DCWW102401a · 0a55787b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Adj 39 Hendre Rd CSO PENCOED | Due 2029-30 | Hendre Road Pencoed Storm Overflow |
| DCWW102763a · f5a724ad | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Adj to Wood View Coychurch Road | Due 2029-30 | Coychurch Road Storm Overflow |
| DCWW101057a · 0567c187 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ANGELTON GREEN PS PENYFAI, BRIDGEND | Due 2029-30 | Water body only |
| DCWW100968a · 080c9693 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Beach Rd Pumping Station Newton | Due 2029-30 | Beach Road Porthcawl 2 Storm Overflow |
| DCWW101582a · 49ef7083 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Brid Ogwr Pt 32 Aberkenfig CSO Br'd | Due 2029-30 | Aberkenfig Railway Storm Overflow |
| DCWW102731a · 097b30ab | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRIDGEND MAESTEG HEARTS OF OAK COTTAGES | Due 2029-30 | Bridgend off Hearts of Oak Cottages Storm Overflow |
| DCWW101082a · 50ac56c9 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BROOK VALE SPS, OFF HENDRE ROAD, PENCOED | Due 2029-30 | Hendre Road Pencoed Storm Overflow |
| DCWW100994a · 9edb396c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRYNCETHIN PUMPING STATION, LAND AT BRYNCETHIN FAWR FARM | Due 2029-30 | Water body only |
| DCWW101582a · d66b6951 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERAU STH CSO ASSET 52420 MAESTEG | Due 2029-30 | Bangor Street Nantyffyllon Storm Overflow |
| DCWW102361a · df128986 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CASTLE STREET CSO MAESTEG | Due 2029-30 | Castle Street Maesteg Storm Overflow |
| DCWW102360a · 2346c750 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Church Street, Maesteg | Due 2029-30 | Church Street Maesteg Storm Overflow |
| DCWW101092a · ae7cf553 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COLWINSTON PUMPING STATION, VALE OF GLAMORGAN | Due 2029-30 | Colwinston Storm Overflow |
| DCWW101582a · c8ace3b2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO and EO at Ewenni No 2 SPS | Due 2029-30 | Ewenny No.2 Storm Overflow |
| DCWW101582a · 458e83a7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at End of Railway Terrace, Ogmore Vale | Due 2029-30 | Railway Terrace Ogmore Vale Storm Overflow |
| DCWW101582a · 7cb883f9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Nottage Roundabout Point 59 | Due 2029-30 | Fulmar Road Storm Overflow |
| DCWW101582a · 0b7fbde5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Riverside Aberkenfig | Due 2029-30 | Riverside Aberkenfig Storm Overflow |
| DCWW101582a · 127170d8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO BELOW CEMETERY RD OGMORE VALE | Due 2029-30 | Cemetery Road Ogmore Vale Storm Overflow |
| DCWW101582a · ecaa9693 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO Cwmfelin (Point 26) | Due 2029-30 | Maesteg Paddock Wood Storm Overflow |
| DCWW101582a · cf434c3f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO Meadow Street Pontycymmer | Due 2029-30 | Pontycymmer Richard Street Storm Overflow |
| DCWW101582a · 3b190a20 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO rear of Margam Road Depot | Due 2029-30 | Stallcourt Close Rear Storm Overflow |
| DCWW101582a · e4c0fca0 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO SOUTH OF RAILWAY LLANHAREN | Due 2029-30 | Llanharan Storage Storm Overflow |
| DCWW101582a · f28f7afb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO STH OF GREENFIELD TERRACE PONT | Due 2029-30 | Parc-Tyn-Y-Waun Llangynwyd Storm Overflow |
| DCWW100917a · 742c1c78 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Ewenni No 2 PS | Due 2029-30 | Ewenny No.2 Storm Overflow |
| DCWW100916a · 9bc377cc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ EWENNY P.STN. NO. 1 EMERGEN | Due 2029-30 | Ewenny No.1 Overflow |
| DCWW101008a · bbe8eddf | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FOUNTAIN PUMPING STATION | Due 2029-30 | Water body only |
| DCWW101094a · dbf50ae2 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Hazel Grove Pumping Station, Nr 5 nPant Bach, Pyle, Bridgend | Due 2029-30 | Pant Bach Storm Overflow |
| DCWW101582a · 0a80e1f7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Hazel Grove SPS | Due 2029-30 | Pant Bach Storm Overflow |
| DCWW102444a · eaf44bb6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Heol Bryncwils CSO | Due 2029-30 | Heol Bryncwils Storm Overflow |
| DCWW101582a · f6e420f9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HEOL FACH CSO NORTH CORNELLY | Due 2029-30 | Heol Las Play Area Storm Overflow |
| DCWW101582a · f90f1a1d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Heol Y Llwyni CSO | Due 2029-30 | Heol-y-Llwyni Rear Storm Overflow |
| DCWW101582a · e802a816 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Laleston PS | Due 2029-30 | Laleston Storm Overflow |
| DCWW100942a · 853040c6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Laleston SPS, adj to High Street Laleston. Bridgend | Due 2029-30 | Laleston Storm Overflow |
| DCWW101090a · 68213b79 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANDOW PUMPING STATION, VALE OF GLAMORGAN | Due 2029-30 | Llandow Storm Overflow |
| DCWW101582a · 715e46b8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llandow SPS | Due 2029-30 | Llandow Storm Overflow |
| DCWW101582a · 26fca855 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llangan (NR Bridgend) SPS | Due 2029-30 | Llangan Storm Overflow |
| DCWW101018a · ae0a029e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Llangan Pumping Station | Due 2029-30 | Llangan Storm Overflow |
| DCWW101964a · 56d49531 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Lletty Brongu (Nr Maesteg) | Due 2029-30 | Lletty Brongu WwTW Storm Overflow |
| DCWW101064a · 0e7d710e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLETTY BRONGU SEWAGE TREATMENT WORKS, LLANGYNWYD, MAESTEG | Due 2029-30 | Lletty Brongu WwTW Storm Overflow |
| DCWW101091a · 31ec63ec | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLYSWORNEY PUMPING STATION, VALE OF GLAMORGAN | Due 2029-30 | Llysworney Storm Overflow |
| DCWW101582a · f17b7253 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llysworney SPS | Due 2029-30 | Llysworney Storm Overflow |
| DCWW101582a · 5b95ad20 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Lon-Y-Caridan CSO | Due 2029-30 | Lon-Y-Cariadon Storm Overflow |
| DCWW101061a · fb0e43d3 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MARGAM NEW VILLAGE PUMPING STATION, COED HIRWAUN, NEAR PYLE | Due 2029-30 | Water body only |
| DCWW101000a · 647aa2e0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Marlas Storm Tanks, North Cornelly, Bridgend, | Due 2029-30 | Marlas Storm Overflow |
| DCWW101582a · 51970844 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Marlas STW SPS | Due 2029-30 | Marlas Storm Overflow |
| DCWW102757a · 365edcfe | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Milton Drive CSO, Bridgend | Due 2029-30 | Milton Drive Bridgend Storm Overflow |
| DCWW102713a · d14ee019 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NR GLANNANT HEOL HEULOG GILFACH GOCH | Due 2029-30 | Glannant Road Storm Overflow |
| DCWW101582a · 491d139b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Oakfield Terrace CSO, Nantymoel | Due 2029-30 | Oakfield Terrace Storm Overflow |
| DCWW102445a · 55be5fad | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ OFF WATER STREET, OGMORE VALE | Due 2029-30 | Ogmore Valley Water Street Storm Overflow |
| DCWW101582a · 0ef05a23 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ OGWR FAWR CSO OGMORE VALE | Due 2029-30 | St John Street Overflow |
| DCWW102537a · 426695bd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Opp 2 Commercial Place, Pontycymmer | Due 2029-30 | Commercial Place Pontycymer Overflow |
| DCWW101582a · 9f771fe1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PBONT NEWBRDG FLDS CSO | Due 2029-30 | Newbridge Fields Storm Overflow |
| DCWW102777a · d955c4e3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PORTHCAWL BEACH ROAD CSO | Due 2029-30 | Beach Road Porthcawl 1 Storm Overflow |
| DCWW101582a · bd659899 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Porthcawl Sanderling Close No 7 | Due 2029-30 | Sanderling Close Storm Overflow |
| DCWW101112a · 2f6ba3cb | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pumping Station at Brocastle Farm Development | Due 2029-30 | Water body only |
| DCWW102778a · ed7d405e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Redlands Close CSO Pencoed (New) | Due 2029-30 | Redlands Close Pencoed Storm Overflow |
| DCWW102400a · f1d221c2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ River Street, Ogmore Vale CSO | Due 2029-30 | River Street Ogmore Vale Storm Overflow |
| DCWW102535a · d8f3a88c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Riverside Cottages CSO, Coytrahen | Due 2029-30 | Riverside Coytrahen Overflow |
| DCWW101582a · b4f6dddb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SLAUGHTER HOUSE CSO ASSET 52415 | Due 2029-30 | Maesteg Bridgend Road Storm Overflow |
| DCWW102387a · 69072108 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TREOES (NR BRIDGEND) PS | Due 2029-30 | North Treoes Bridge Storm Overflow |
| DCWW101012a · 927bcb01 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Treoes Pumping Station | Due 2029-30 | North Treoes Bridge Storm Overflow |
| DCWW102789a · 5ce88d4d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TY-ISAF ROAD CSO | Due 2029-30 | Ty-Isaf Road Storm Overflow |
| DCWW101139a · 91bdbaae | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Village Farm Pumping Station | Due 2029-30 | Water body only |
| DCWW100860a · 79a9d397 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ WATERTON INDUSTRIAL ESTATE, SEWAGE PUMPING STATION | Due 2029-30 | Water body only |
| DCWW100693a · 866d7495 | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ WICK | Due 2029-30 | Wick WwTW Overflow |
| DCWW101644a · 0bd74726 | W_WFD_P_NDIMP1 | Improvement | Implementation of actions to address Waste Water Treatmwent Works WwTW impacts causing, and/or modelled as showing a predicted, P phosphorus failure at waterbody and or site level status. WQ WICK | Due 2029-30 | WICK |
| DCWW101582a · 5dea8ea4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WILDMILL CSO WILDMILL BRIDGEND | Due 2029-30 | Wildmill Lane Bridgend Storm Overflow |
| DCWW102759a · 2f705cea | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Windsor Road CSO | Due 2029-30 | Windsor Road Porthcawl Storm Overflow |
80 of 80 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.