Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

9
Above the 2050 cap
of 15 tracked
0
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
6
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Uffington STW
TWL00419
2050101 ·24
48
94 events
-52%4.8×Falling — behind
Drayton STW
TWL00162
2050128 ·24
47
35 events
-63%4.7×Falling — behind
Oxford STW
TWL00323
2050162 ·24
43
38 events
-73%4.3×Falling — behind
Culham STW
TWL00147
205078 ·24
38
95 events
-51%3.8×Falling — behind
Kingston Bagpuize STW
TWL00257
2050143 ·24
32
38 events
-78%3.2×Falling — behind
Wantage STW
TWL00425
205096 ·24
30
75 events
-69%3×Falling — behind
Didcot STW
TWL00155
205094 ·24
26
32 events
-72%2.6×Falling — behind
Appleton STW
TWL00013
2050160 ·24
17
29 events
-89%1.7×Falling — behind
Abingdon STW
TWL00004
205085 ·24
13
35 events
-85%1.3×Nearly there
West Way, Botley (syphon)
TWL00439
205018 ·24
10
10 events
-44%1×Within the cap
The Willows, North Hinksey Lane
TWL00411
20508 ·24
7
7 events
-13%0.7×Within the cap
Stanford in the Vale STW
TWL00387
20503 ·25
3
3 events
0%0.3×—Within the cap
Heyford Hill Lane (littlemore) pumping station
TWL00273
205026 ·24
1
5 events
-96%0.1×Within the cap
Tubney pumping station Xx
TWL00806
20507 ·24
1
2 events
-86%0.1×Within the cap
Cassington STW
TWL00075
205022 ·24
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →