A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

34
Measures in this catchment
WINEP, current record
20
Still active
not yet past their date
14
Assumed complete
completion date has passed
7
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08TW100542 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
ABINGDON SEWAGE TREATMENT WORKS (Odhay Hill Ditch)
Complete 2025-26Thames (Evenlode to Thame)
08TW100547 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
APPLETON STW, ABINGDON, OXON
Complete 2025-26Frilford and Marcham Brook
08TW100570 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CASSINGTON STW
Complete 2025-26Cassington STW
08TW100590 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CULHAM STW
Complete 2025-26Culham STW
08TW100592 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
DIDCOT STW
Complete 2025-26Didcot STW
08TW100595 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
DRAYTON STW
Complete 2025-26Drayton STW
08TW100633 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
KINGSTON BAGPUIZE STW
Complete 2025-26Kingston Bagpuize STW
08TW100716 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
OXFORD (SANDFORD) STW
Complete 2025-26Northfield Brook (Source to Thames) at Sandford
08TW100667 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
STANFORD IN THE VALE STW
Complete 2025-26Stanford in the Vale STW
08TW100674 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
UFFINGTON STW
Complete 2025-26Uffington STW
08TW100677 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WANTAGE STW
Complete 2025-26Wantage STW
08TW101392 · aWFD_NDNo deterioration
mg/l Amm permit at CULHAM STW
Reduce ammonia loading
Complete 2025-26Thames (Evenlode to Thame)
08TW101393 · aWFD_NDNo deterioration
mg/l BOD permit at CULHAM STW
Reduce BOD loading
Complete 2025-26Thames (Evenlode to Thame)
08TW100863 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Appleton STW
Reduce Phosphorus Loadings at Appleton STW
Complete 2025-26Frilford and Marcham Brook
08TW101567 · aU_MON4Monitoring
Install and run event-duration monitoring
ABINGDON SEWAGE TREATMENT WORKS (Odhay Hill Ditch)
Due 2026-27Thames (Evenlode to Thame)
08TW100285 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
APPLETON STW, ABINGDON, OXON
Due 2026-27Frilford and Marcham Brook
08TW100306 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
CASSINGTON STW
Due 2026-27Cassington STW
08TW101583 · aU_MON4Monitoring
Install and run event-duration monitoring
CULHAM STW
Due 2026-27Culham STW
08TW100429 · aU_MON4Monitoring
Install and run event-duration monitoring
DIDCOT STW
Due 2026-27Didcot STW
08TW101586 · aU_MON4Monitoring
Install and run event-duration monitoring
DRAYTON STW
Due 2026-27Drayton STW
08TW100354 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
KINGSTON BAGPUIZE STW
Due 2026-27Kingston Bagpuize STW
08TW101603 · aU_MON4Monitoring
Install and run event-duration monitoring
OXFORD (SANDFORD) STW
Due 2026-27Northfield Brook (Source to Thames) at Sandford
08TW100385 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
STANFORD IN THE VALE STW
Due 2026-27Stanford in the Vale STW
08TW100395 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
UFFINGTON STW
Due 2026-27Uffington STW
08TW100451 · aU_MON4Monitoring
Install and run event-duration monitoring
WANTAGE STW
Due 2026-27Wantage STW
08TW101108 · grEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at CASSINGTON STW
Due 2027-28Thames (Evenlode to Thame)
08TW101108 · urEnvAct_INV4Investigation
Storm Overflows investigation
Tubney SPS (AKA Basildon House)- Storm Overflows investigation
Due 2027-28Frilford and Marcham Brook
08TW100052 · cWFD_INV_CHEMInvestigation
Oxford STW
4e Emerging substances investigation – impact to the environment
Due 2029-30Northfield Brook (Source to Thames) at Sandford
08TW100897 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Culham STW
Reduce Phosphorus Loadings at Culham STW
Due 2029-30Thames (Evenlode to Thame)
08TW100899 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Didcot STW
Reduce Phosphorus Loadings at Didcot STW
Due 2029-30Moor Ditch and Ladygrove Ditch
08TW100924 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.15 mg/l at Oxford STW
Reduce Phosphorus Loadings at Oxford STW
Due 2029-30Northfield Brook (Source to Thames) at Sandford
08TW100942 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Tring STW
Reduce Phosphorus Loadings at Tring STW
Due 2029-30Ock (to Cherbury Brook)
09TW100048 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Wantage STW
Reduce Phosphorus Loadings at Wantage STW
Due 2029-30Letcombe Brook
08TW101087 · aEnvAct_IMP3Improvement
Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 4.58Ha SUDS IA Removal, 40m3 screen
Storm Overflows action at CASSINGTON STW
Due 2029-30Thames (Evenlode to Thame)

34 of 34 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.