What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100184a · d3a94bc8 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CRYNANT STW CRYNANT NEATH | Complete 2025-26 | Crynant WwTW Storm Overflow |
| DCWW100189a · 0c42de02 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CWMGWRCH STW CWMGWRCH NEATH | Complete 2025-26 | Chain Road Storm Overflow |
| DCWW100230a · 77006dcd | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ HIRWAUN STW HIRWAUN RHONDDA | Complete 2025-26 | Hirwaun Industrial Estate WwTW Storm Overflow |
| DCWW100344a · 9ad739c2 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PONTNEDDFECHAN STW SWANSEA | Complete 2025-26 | Pontneddfechan WwTW Storm Overflow |
| DCWW100375a · 56e84aa6 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ SWANSEA STW FABIAN WAY SWANSEA , | Complete 2025-26 | Elba Crescent Swansea Overflow |
| DCWW102185a · 9519dd4d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Near 32B Bryndulais Avenue CSO Bryndulas | Due 2026-27 | Bryndulais Avenue Seven Sisters No 2 Storm Overflow |
| DCWW102172a · b20119e5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Outside visitor centre Aberdulais | Due 2026-27 | Main Road Aberdulais No.1 Storm Overflow |
| DCWW102209a · cf8b9a43 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SWANSEA FABIAN WAY SPS | Due 2026-27 | Swansea Fabian Way Storm Overflow |
| DCWW100956a · e5360632 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Abercregan Pumping Station | Due 2029-30 | Abercregan Storm Overflow |
| DCWW101021a · 5b79f19a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ABERDULAIS SEWAGE PUMPING STATION | Due 2029-30 | Aberdulais Storm Overflow |
| DCWW101582a · f891b065 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Adj Health Centre CSO, Dyfed Rd | Due 2029-30 | Fairfield Neath Storm Overflow |
| DCWW102379a · ae217969 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Afan Road CSO Duffryn | Due 2029-30 | Duffryn Afan Road Storm Overflow |
| DCWW101582a · efe5cb0a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Afan St CSO | Due 2029-30 | Afan Street Port Talbot Storm Overflow |
| DCWW102578a · 7e4ba119 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ATS Garage CSO, Afan Way | Due 2029-30 | Afan Way Storm Overflow |
| DCWW100873a · 5add08a4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Baldwins Crescent SPS | Due 2029-30 | Baldwins Crescent Overflow |
| DCWW102544a · 607f38ae | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Bethel Road CSO Glynneath | Due 2029-30 | Bethel Road Glynneath Storm Overflow |
| DCWW101959a · 65df686a | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Blaengynfi Tunnel Terracr MH 245A SWO 8 | Due 2029-30 | Blaengwynfi Tunnel Storm Overflow |
| DCWW101072a · 335e52f7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRITON FERRY SPS, INNER DOCK, BRITON FERRY, NEATH | Due 2029-30 | Briton Ferry Storm Overflow |
| DCWW101582a · d2b48a7b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRYNDULAIS (SWO 2A) | Due 2029-30 | Bryndulais Avenue Seven Sisters No1 Storm Overflow |
| DCWW101985a · eebc2029 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Bryndulais Farm CSO | Due 2029-30 | Bryndulais Avenue Seven Sisters No1 Storm Overflow |
| DCWW102588a · 42b13932 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cadoxton Road CSO, Neath | Due 2029-30 | Cadoxton Road Storm Overflow |
| DCWW101582a · 759f57de | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Church Road CSO Church Road Neath | Due 2029-30 | Stanley Place Storage Storm Overflow |
| DCWW102776a · 46af1210 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CIMLA ROAD SWO INTO GNOLL BROOK | Due 2029-30 | Cimla Road Gnoll Brook Storm Overflow |
| DCWW101013a · c98dcc87 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Clyne Sewage Pumping Station | Due 2029-30 | Clyne Near Twrch Brook Storm Overflow |
| DCWW101582a · 3e31bb55 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Clyne SPS Clyne Neath Neath Port T | Due 2029-30 | Clyne Near Twrch Brook Storm Overflow |
| DCWW100939a · 2f2cdd8d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COELBREN PS 1 EMERGENCY | Due 2029-30 | Coelbren Storm Overflow |
| DCWW101137a · 77ca6d5b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COMMERCIAL ROAD SPS, COMMERCIAL ROAD, RESOLVEN, NEATH | Due 2029-30 | B4434 Roundabout Resolven Storm Overflow |
| DCWW100632a · 64166003 | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ CRYNANT (NE OF NEATH) | Due 2029-30 | Crynant WwTW Storm Overflow |
| DCWW101073a · 5c85d482 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CSO & EO at GIANT'S GRAVE SPS, PILL TERRACE, GIANT'S GRAVE, NEATH | Due 2029-30 | Giant's Grave Storm Overflow |
| DCWW101582a · 0198c66f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO 107 Below Alder Terrace Afan | Due 2029-30 | Alder Terrace Storm Overflow |
| DCWW101582a · 089bff05 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO 117 Playground 3 Morgan Trce | Due 2029-30 | Morgans Terrace Playground Pontrhydyfen Storm Overflow |
| DCWW100960a · a5767638 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CSO 123 at Margam Pumping Station | Due 2029-30 | Duke Street Margam Storm Overflow |
| DCWW101582a · 6ee9929e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO 129 Glyncorrwg CSO Glyncorrwg | Due 2029-30 | Glyncorrwg Storm Overflow |
| DCWW101582a · cdb5daf2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO 48 NEATH RIVER BRIDGE ADJ CALOR | Due 2029-30 | Dulais Fach Road Storm Overflow |
| DCWW101582a · 78dd3651 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO 9 CIMLA COMMON CIMLA NEATH | Due 2029-30 | Cimla Common Storm Overflow |
| DCWW101582a · f3909171 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at rear of Ynys Y Wern | Due 2029-30 | Cwmavon Road Cwmafan Storm Overflow |
| DCWW101582a · 8482bf7e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO No 115 Scotts Yard Cwmafan | Due 2029-30 | Ynys Y Gored Storm Overflow |
| DCWW101582a · 3b190a20 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO rear of Margam Road Depot | Due 2029-30 | Stallcourt Close Rear Storm Overflow |
| DCWW102373a · 59b38817 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CWMAFAN NEAR BRITANNIA INN ON RIGHT B | Due 2029-30 | London Close Cwmafan Overflow |
| DCWW101582a · c72770ce | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cwmgwrach STW Overflow | Due 2029-30 | Cwmgwrach WwTW Storm Overflow |
| DCWW101969a · 6b7df351 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Cymmer | Due 2029-30 | Cymmer Storm Overflow |
| DCWW100991a · ce3db396 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ DYFFRYN CELLWEN PUMPING STATION, Heol Gaer Onllwyn | Due 2029-30 | Onllwyn Storm Overflow |
| DCWW102580a · 6146403c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DYNEVOR JUNCTION PS PENYRHEOL (NR NEATH) | Due 2029-30 | Llandarcy Outfall Storm Overflow |
| DCWW101047a · a668a353 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Dynevor PS CSO and EO, Llandarcy, Neath | Due 2029-30 | Dynevor Junction Storm Overflow |
| DCWW100874a · 6b2df5f7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ EM.O'FLOW B CRYMLYN BUR CRYMLYN BURROWS S.SCHEME | Due 2029-30 | Elba Crescent Swansea Overflow |
| DCWW101065a · 519ea28f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FABIAN WAY SPS, FABIAN WAY, SWANSEA | Due 2029-30 | Swansea Fabian Way Storm Overflow |
| DCWW101048a · 15921ada | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FAIRFIELD SEWAGE PUMPING STATION, PRINCE OF WALES DRIVE, NEATH | Due 2029-30 | Fairfield Neath Storm Overflow |
| DCWW101957a · c2ca7baf | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ FARMERS ROAD CSO | Due 2029-30 | Farmers Road Storm Overflow |
| DCWW101009a · 2374b056 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FARMERS ROAD PUMPING STATION, BRYNCOCH | Due 2029-30 | Farmers Road Storm Overflow |
| DCWW101071a · e8922582 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ GEORGE'S ROW SPS, GEORGE'S ROW, NEATH | Due 2029-30 | George's Row Neath Storm Overflow |
| DCWW101582a · 445f5423 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HEOL ILLTYD CSO BRYNCOCH NPT | Due 2029-30 | Heol Illtyd Storm Overflow |
| DCWW102346a · b139d05b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HIRWAUN STW STORM | Due 2029-30 | Hirwaun Industrial Estate WwTW Storm Overflow |
| DCWW102443a · a4cf968b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llangatwg School grass verge front gates | Due 2029-30 | Main Road Aberdulais No2 Storm Overflow |
| DCWW101049a · b25e55fd | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANTWIT SEWAGE PUMPING STATION, LLANTWIT CHURCH, NEATH | Due 2029-30 | Llantwit Road Neath Storm Overflow |
| DCWW102441a · fc92f34b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Longford Road Neath Abbey | Due 2029-30 | Longford Road Storm Overflow |
| DCWW102442a · 92296e43 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Main Rd Bryncoch CSO | Due 2029-30 | Main Road Bryncoch Storm Overflow |
| DCWW102718a · c29718fc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MARGAM PS PRINCE STREET | Due 2029-30 | Margam PS Prince Street Overflow |
| DCWW101050a · f8d19f98 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MELINCRYTDDAN SEWAGE PUMPING STATION, MILLAND ROAD INDUSTRIAL ESTATE, NEATH | Due 2029-30 | Melincryddan Neat Storm Overflow |
| DCWW102414a · 9060735d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MONASTERY ROAD CSO 35, Neath | Due 2029-30 | Monastery Road Storm Overflow |
| DCWW101582a · 6b4146f2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Nant-y-Cafan CSO, Dulais Valley | Due 2029-30 | Dulais Road Seven Sisters Storm Overflow |
| DCWW101986a · e42b6648 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Nant-y-Cafan Dulais Valley | Due 2029-30 | Dulais Road Seven Sisters Storm Overflow |
| DCWW101962a · 913f7299 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Neath Abbey | Due 2029-30 | Neath Abbey Ruins Southeast Storm Overflow |
| DCWW101019a · 522572bc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NEATH ABBEY PUMPING STATION | Due 2029-30 | Old Road Skewen Storm Overflow |
| DCWW102752a · 77daf33a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NEATH GIANTS GRAVE CSO | Due 2029-30 | Giant's Grave Storm Overflow |
| DCWW102594a · ee6345f8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NEATH GUNSIGHT SWO 11 INTO RIVER NEATH | Due 2029-30 | Roman Way Neath Storm Overflow |
| DCWW102394a · 02c5c261 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NEATH LLANTWIT CHURCH PS | Due 2029-30 | Llantwit Road Neath Storm Overflow |
| DCWW102582a · 79a82aed | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Neath Quay Road SPS EO | Due 2029-30 | Neath Quay Road Storm Overflow |
| DCWW102760a · 96ac7c30 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NEATH SKEWEN CAENANT TERRACE NO 38 REAR | Due 2029-30 | Caenant Terrace Storm Overflow |
| DCWW101582a · f21d15ab | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Onllwyn SPS | Due 2029-30 | Onllwyn Storm Overflow |
| DCWW102756a · f1f9badd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ OPP NURSING HOME NEW ROAD SKEWEN | Due 2029-30 | New Road Skewen Storm Overflow |
| DCWW102418a · 466d6183 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ OPPOSITE 73 PARK STREET TONNA | Due 2029-30 | Dulais Fach Road Junction Storm Overflow |
| DCWW102581a · a43f4f78 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PENTREFFYNNON PS NEATH ABBEY IND ESTATE | Due 2029-30 | Pentreffynnon Storm Overflow |
| DCWW101051a · 35df4923 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENTREFFYNNON SEWAGE PUMPING STATION, NEATH ABBEY INDUSTRIAL ESTATE, NEATH | Due 2029-30 | Pentreffynnon Storm Overflow |
| DCWW102356a · c5ceafe1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Plas Y Coed CSO Glyn Neath | Due 2029-30 | Water body only |
| DCWW102406a · 835d4a52 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTRHYDYFEN ROAD BRIDGE OVER R PELENNA | Due 2029-30 | Pontrhydyfen Viaduct Storm Overflow |
| DCWW102440a · e32eb626 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RESOLVEN ABOVE CLYDACH BROOK SWO 3A INTO | Due 2029-30 | Heol Tonmaen Storm Overflow |
| DCWW102439a · 87bd679c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RESOLVEN COMMERCIAL ROAD PS EOF | Due 2029-30 | B4434 Roundabout Resolven Storm Overflow |
| DCWW102295a · 89fcd02c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RHIGOS HEOL-Y-GRAIG NO 4C | Due 2029-30 | Heol Pendarren Storm Overflow |
| DCWW101138a · fd451866 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Skewen SPS, Park Avenue, Lonlas, | Due 2029-30 | Lonlas Storm Overflow |
| DCWW101582a · 1550b891 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ St Joseph's Church CSO | Due 2029-30 | Neath Hillside Lane Storm Overflow |
| DCWW102419a · 96f8a35d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TANYGROES PLACE CSO | Due 2029-30 | Conduit Street Port Talbot Storm Overflow |
| DCWW102574a · 18c13b44 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ THE LLANDARCY 36" OUTFALL PEN-YR-HEOL | Due 2029-30 | Llandarcy Outfall Storm Overflow |
| DCWW102378a · e0ef4f31 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ UPPER CYMMER MARGAM STREET | Due 2029-30 | Upper Cymmer Margam Street Storm Overflow |
| DCWW102412a · 4b1b7a05 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ynys Street CSO Port Talbot | Due 2029-30 | Ynys Street Storm Overflow |
| DCWW101582a · 3c0822d1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YS.MARCH CRYNANT SWO 2C | Due 2029-30 | Ynys March Crynant Storm Overflow |
85 of 85 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.