Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Charlwood, Surrey59Horley STWNo measure
Capel pumping station47Holmwood STWNo measure
Brockham Bridge Xx pumping station36Dorking, Pixham Lane, Dorking, STWNo measure
Rusper pumping station34London (crawley STWNo measure
Commonside (leatherhead) pumping station27Leatherhead STWNo measure
Salfords pumping station23Reigate STWNo measure
Spooks Hill, North Holmwood17Dorking, Pixham Lane, Dorking, STWNo measure
Pease Pottage pumping station11London (crawley STWNo measure
Bentsbrook Road4Dorking, Pixham Lane, Dorking, STWNo measure
Millbank, Crawley1London (crawley STWNo measure
Dean Oak Lane (leigh) pumping station1Holmwood STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.