Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

10
Above the 2050 cap
of 16 tracked
1
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
6
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Burstow STW
TWL00065
2050133 ·24
72
74 events
-46%7.2×Falling — behind
Ironsbottom STW
TWL00242
205063 ·24
70
73 events
+11%7×Rising
Holmwood STW
TWL00231
2050107 ·24
61
70 events
-43%6.1×Falling — behind
Crawley STW
TWL00118
205046 ·24
33
41 events
-28%3.3×Falling — behind
Charlwood, Surrey
TWL00086
205035 ·24
25
19 events
-29%2.5×Falling — behind
Esher STW
TWL00174
205078 ·24
19
15 events
-76%1.9×Falling — behind
Merstham STW
TWL00297
205026 ·24
19
12 events
-27%1.9×Falling — behind
Rusper pumping station
TWL00356
205028 ·24
18
34 events
-36%1.8×Falling — behind
Capel pumping station
TWL00124
205022 ·24
15
26 events
-32%1.5×Nearly there
Pease Pottage pumping station
TWL00328
205019 ·24
12
7 events
-37%1.2×Nearly there
Brockham Bridge Xx pumping station
TWL00058
205015 ·24
8
8 events
-47%0.8×Within the cap
Salfords pumping station
TWL00358
20508 ·24
7
11 events
-13%0.7×Within the cap
Millbank, Crawley
TWL00302
20503 ·24
5
6 events
+67%0.5×Within the cap
Spooks Hill, North Holmwood
TWL00381
205012 ·24
3
3 events
-75%0.3×Within the cap
Commonside (leatherhead) pumping station
TWL00111
205013 ·24
2
5 events
-85%0.2×Within the cap
Bentsbrook Road
TWL00738
20504 ·24
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →