Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Bromyard New Road Storm Overflow1Bromyard STWMeasure linked
New Court Storm Overflow1Eign STWNo measure
Love Lane Storm Overflow1Kington STWNo measure
Bodenham Moor Overflow1BodenhamNo measure
Yarpole Overflow1Luston & YarpoleNo measure
Castlefields Leominster Overflow1Leominster STWNo measure
Luston Storm Overflow1Luston & YarpoleNo measure
Bridge Street Kington Storm Overflow1Kington STWNo measure
Ford Street Storm Overflow1Presteigne STWMeasure linked
Meadow Street Field Storm Overflow1WeobleyNo measure
Porthouse Farm Industrial Estate Overflow1Bromyard STWNo measure
Llangunllo Storm Overflow1LlangynlloMeasure linked
Sherford Street Storm Overflow1Bromyard STWNo measure
Bridge Street Pembridge Storm Overflow1PembridgeNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.