What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme (England) and National Environment Programme (Wales) is how the Environment Agency and Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the EA and NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08DC100227 · x | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Kington STW (Waterloo Road) | Complete 2025-26 | Arrow - conf Gilwern Bk to conf R Lugg |
| 08DC100226 · w | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Kington STW (Waterloo Road) | Complete 2025-26 | Arrow - conf Gilwern Bk to conf R Lugg |
| 08DC100226 · aa | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) LEOMINSTER STW | Complete 2025-26 | Lugg - conf Norton Bk to conf R Arrow |
| 08DC100227 · ab | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) LEOMINSTER STW | Complete 2025-26 | Lugg - conf Norton Bk to conf R Arrow |
| 08DC100226 · e | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Moreton on Lugg STW | Complete 2025-26 | Lugg - conf R Arrow to conf R Wye |
| 08DC100227 · b | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Moreton on Lugg STW | Complete 2025-26 | Lugg - conf R Arrow to conf R Wye |
| 08DC100227 · r | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Shobdon STW | Complete 2025-26 | SHOBDON |
| 08DC100226 · q | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Shobdon STW | Complete 2025-26 | SHOBDON |
| 08DC100227 · t | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Tarrington STW | Complete 2025-26 | TARRINGTON |
| 08DC100226 · s | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Tarrington STW | Complete 2025-26 | TARRINGTON |
| 08DC100226 · k | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WEOBLEY STW | Complete 2025-26 | WEOBLEY |
| 08DC100227 · g | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) WEOBLEY STW | Complete 2025-26 | WEOBLEY |
| DCWW100350a · d1a8725f | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PRESTEIGNE STW CLATTERBROOM | Complete 2025-26 | Presteigne WwTW Storm Overflow |
| 08DC100233 · c | WFD_NDINV_WRFlow | Investigation | Investigation into abstraction licence - DUNFIELD BOREHOLE DUNFIELD BOREHOLE investigation | Due 2026-27 | Arrow - conf Gilwern Bk to conf R Lugg |
| 08DC100233 · b | WFD_NDINV_WRFlow | Investigation | Investigation into unused abstration licence - R.LUGG (BYTON) R.LUGG (BYTON) investigation | Due 2026-27 | Lugg - conf Norton Bk to conf R Arrow |
| 08DC100233 · a | WFD_NDINV_WRFlow | Investigation | Investigation into unused abstraction licence - Well at Midsummer Meadow WELL AT MIDSUMMER MEADOW investigation | Due 2026-27 | Arrow - conf Gilwern Bk to conf R Lugg |
| DCWW101525a · d7373061 | W_FISH_IMP1 | Improvement | Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage. Fish Fish Barrier Mitigation at asset 40208585 | Due 2026-27 | Water body only |
| 08DC100239 · a | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at CSO_AT_BROMYARD_WWTW to protect the environment so that they have no local adverse ecological impact. CSO_AT_BROMYARD_WWTW | Due 2027-28 | Frome - conf Tedstone Bk to conf R Lugg |
| 08DC100239 · b | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at CSO_AT_TARRINGTON_STW to protect the environment so that they have no local adverse ecological impact. CSO_AT_TARRINGTON_STW | Due 2027-28 | Tarrington Bk - source to conf R Frome |
| 08DC100239 · c | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at JUNCTION_OF_CRUXWELL_ST_&_ROWBERRY to protect the environment so that they have no local adverse ecological impact. JUNCTION_OF_CRUXWELL_ST_&_ROWBERRY | Due 2027-28 | Frome - source to conf Tedstone Bk |
| 08DC100239 · d | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at KINGTON_-_MANHOLE_29 to protect the environment so that they have no local adverse ecological impact. KINGTON_-_MANHOLE_29 | Due 2027-28 | Arrow - conf Gladestry Bk to conf Gilwern Bk |
| 08DC100239 · e | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at KINGTON_WASTEWATER_TREATMENT_WORKS to protect the environment so that they have no local adverse ecological impact. KINGTON_WASTEWATER_TREATMENT_WORKS | Due 2027-28 | Arrow - conf Gilwern Bk to conf R Lugg |
| 08DC100239 · f | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at LEOMINSTER_WASTEWATER_TREATMENT_WKS to protect the environment so that they have no local adverse ecological impact. LEOMINSTER_WASTEWATER_TREATMENT_WKS | Due 2027-28 | Lugg - conf Norton Bk to conf R Arrow |
| 08DC100239 · g | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at MANHOLE_27_COMBINED_SEWER_OVERFLOW to protect the environment so that they have no local adverse ecological impact. MANHOLE_27_COMBINED_SEWER_OVERFLOW | Due 2027-28 | Arrow - conf Gladestry Bk to conf Gilwern Bk |
| 08DC100239 · h | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at MANHOLE_50_COMBINED_SEWER_OVERFLOW to protect the environment so that they have no local adverse ecological impact. MANHOLE_50_COMBINED_SEWER_OVERFLOW | Due 2027-28 | Arrow - conf Gladestry Bk to conf Gilwern Bk |
| 08DC100239 · i | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at MORETON_ON_LUGG_WWTW to protect the environment so that they have no local adverse ecological impact. MORETON_ON_LUGG_WWTW | Due 2027-28 | Lugg - conf R Arrow to conf R Wye |
| 08DC100239 · j | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at NEW_COURT_SEWAGE_PUMPING_STATION to protect the environment so that they have no local adverse ecological impact. NEW_COURT_SEWAGE_PUMPING_STATION | Due 2027-28 | Lugg - conf R Arrow to conf R Wye |
| 08DC100239 · l | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact. P_INDUSTRIAL_SITE_PS | Due 2027-28 | Frome - source to conf Tedstone Bk |
| 08DC100239 · k | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at PEMBRIDGE_CSO to protect the environment so that they have no local adverse ecological impact. PEMBRIDGE_CSO | Due 2027-28 | PEMBRIDGE |
| 08DC100239 · m | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at SEATON_AVENUE_CSO to protect the environment so that they have no local adverse ecological impact. SEATON_AVENUE_CSO | Due 2027-28 | Lugg - conf R Arrow to conf R Wye |
| 08DC100239 · n | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at SHOBDON_STW to protect the environment so that they have no local adverse ecological impact. SHOBDON_STW | Due 2027-28 | SHOBDON |
| 08DC100236 · a | U_IMP4 | Improvement | Improvement to storm overflow shown through investigation to be causing local adverse environmental impact and prioritised as High / Very High. To be expanded upon further following PR24 discussions and further direction from Welsh Government Bromyard New Road SPS (Permit name Petty Bridge SPS) Improvements to prioritised storm overflow causing local adverse environmental impact | Due 2027-28 | Frome - conf Tedstone Bk to conf R Lugg |
| 08DC100237 · a | U_IMP4 | Improvement | Improvement to storm overflow shown through investigation to be causing local adverse environmental impact and prioritised as High / Very High. To be expanded upon further following PR24 discussions and further direction from Welsh Government Manhole No.9 CSO (Weobley) - Improvements to prioritised storm overflow causing local adverse environmental impact | Due 2027-28 | Stretford Bk - source to conf R Arrow |
| 08DC100003 · a | U_IMP7 | Improvement | Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS MUCH COWARNE MILL CROFT Septic Tank | Due 2027-28 | Lodon - source to conf R Frome |
| 08DC100001 · a | U_IMP7 | Improvement | Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS WOLFERLOW Septic Tank | Due 2027-28 | Tedstone Bk - source to conf R Frome |
| 08DC100235 · a | 25YEP_IMP | Improvement | Improvement to storm overflow shown through investigation to be causing local adverse environmental impact and prioritised as Severe. To be expanded upon further following PR24 discussions and further direction from Welsh Government Bromyard Sherford Street SO (Permit name Congregational Chapel CSO) Improvements to prioritised storm overflow causing local adverse environmental impact | Due 2029-30 | Frome - conf Tedstone Bk to conf R Lugg |
| 08DC100142 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Bromyard STW | Due 2029-30 | Frome - conf Tedstone Bk to conf R Lugg |
| 08DC100151 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Canon Pyon STW | Due 2029-30 | Wellington Bk - source to conf R Lugg |
| DCWW101144a · bf7461f3 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Emergency Overflow serving Norton SPS | Due 2029-30 | Water body only |
| 08DC100005 · a | WFD_IMP_PHYSHAB | Improvement | Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish Fish Barrier Mitigation at Asset no. | Due 2029-30 | Frome - conf Tedstone Bk to conf R Lugg |
| 08DC100010 · a | WFD_IMP_PHYSHAB | Improvement | Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish Fish Barrier Mitigation at Asset no. | Due 2029-30 | Arrow - conf Gilwern Bk to conf R Lugg |
| 08DC100006 · a | WFD_IMP_PHYSHAB | Improvement | Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish Fish Barrier Mitigation at Asset no. | Due 2029-30 | Frome - conf Tedstone Bk to conf R Lugg |
| 08DC100008 · a | WFD_IMP_PHYSHAB | Improvement | Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish Fish Barrier Mitigation at Asset no. | Due 2029-30 | Arrow - conf Gilwern Bk to conf R Lugg |
| 08DC100009 · a | WFD_IMP_PHYSHAB | Improvement | Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish Fish Barrier Mitigation at Asset no. | Due 2029-30 | Arrow - conf Gilwern Bk to conf R Lugg |
| 08DC100152 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Kingsland STW | Due 2029-30 | KINGSLAND |
| DCWW101582a · 18d2662d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANGUNLLO STW PS | Due 2029-30 | Llangunllo Storm Overflow |
| DCWW101444a · 9dd9e47e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Lugg Bridge CSO (acts as EO for Tanyard SPS), Broad Street, Presteigne, Powys | Due 2029-30 | Ford Street Storm Overflow |
| 08DC100143 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Lyonshall STW | Due 2029-30 | LYONSHALL |
| DCWW101887b · f241ad68 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ New Radnor | Due 2029-30 | Water body only |
| DCWW101887a · dfacfd0a | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ New Radnor STW | Due 2029-30 | Water body only |
| 08DC100150 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Pencombe STW | Due 2029-30 | Lodon - source to conf R Frome |
| DCWW100806a · ba5f38f6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PETTY BRIDGE PUMPING STATION NGR in England | Due 2029-30 | Bromyard New Road Storm Overflow |
| 08DC100144 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Shobdon STW | Due 2029-30 | SHOBDON |
| DCWW101582a · e08cb307 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Tanyard Pumping Station CSO/EO Ford Street, Presteigne, Stapleton, Powys | Due 2029-30 | Ford Street Storm Overflow |
| 08DC100145 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Tarrington | Due 2029-30 | TARRINGTON |
| 08DC100146 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Weobley STW | Due 2029-30 | WEOBLEY |
56 of 56 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.