Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme (England) and National Environment Programme (Wales) is how the Environment Agency and Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the EA and NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

56
Measures in this catchment
WINEP and NEP, current record
43
Still active
not yet past their date
13
Assumed complete
completion date has passed
21
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08DC100227 · xU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Kington STW (Waterloo Road)
Complete 2025-26Arrow - conf Gilwern Bk to conf R Lugg
08DC100226 · wU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Kington STW (Waterloo Road)
Complete 2025-26Arrow - conf Gilwern Bk to conf R Lugg
08DC100226 · aaU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
LEOMINSTER STW
Complete 2025-26Lugg - conf Norton Bk to conf R Arrow
08DC100227 · abU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
LEOMINSTER STW
Complete 2025-26Lugg - conf Norton Bk to conf R Arrow
08DC100226 · eU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Moreton on Lugg STW
Complete 2025-26Lugg - conf R Arrow to conf R Wye
08DC100227 · bU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Moreton on Lugg STW
Complete 2025-26Lugg - conf R Arrow to conf R Wye
08DC100227 · rU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Shobdon STW
Complete 2025-26SHOBDON
08DC100226 · qU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Shobdon STW
Complete 2025-26SHOBDON
08DC100227 · tU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Tarrington STW
Complete 2025-26TARRINGTON
08DC100226 · sU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Tarrington STW
Complete 2025-26TARRINGTON
08DC100226 · kU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WEOBLEY STW
Complete 2025-26WEOBLEY
08DC100227 · gU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
WEOBLEY STW
Complete 2025-26WEOBLEY
DCWW100350a · d1a8725fW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PRESTEIGNE STW CLATTERBROOM
Complete 2025-26Presteigne WwTW Storm Overflow
08DC100233 · cWFD_NDINV_WRFlowInvestigation
Investigation into abstraction licence - DUNFIELD BOREHOLE
DUNFIELD BOREHOLE investigation
Due 2026-27Arrow - conf Gilwern Bk to conf R Lugg
08DC100233 · bWFD_NDINV_WRFlowInvestigation
Investigation into unused abstration licence - R.LUGG (BYTON)
R.LUGG (BYTON) investigation
Due 2026-27Lugg - conf Norton Bk to conf R Arrow
08DC100233 · aWFD_NDINV_WRFlowInvestigation
Investigation into unused abstraction licence - Well at Midsummer Meadow
WELL AT MIDSUMMER MEADOW investigation
Due 2026-27Arrow - conf Gilwern Bk to conf R Lugg
DCWW101525a · d7373061W_FISH_IMP1Improvement
Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage.
Fish
Fish Barrier Mitigation at asset 40208585
Due 2026-27Water body only
08DC100239 · a25YEP_INVInvestigation
Investigations to reduce storm overflow spills at CSO_AT_BROMYARD_WWTW to protect the environment so that they have no local adverse ecological impact.
CSO_AT_BROMYARD_WWTW
Due 2027-28Frome - conf Tedstone Bk to conf R Lugg
08DC100239 · b25YEP_INVInvestigation
Investigations to reduce storm overflow spills at CSO_AT_TARRINGTON_STW to protect the environment so that they have no local adverse ecological impact.
CSO_AT_TARRINGTON_STW
Due 2027-28Tarrington Bk - source to conf R Frome
08DC100239 · c25YEP_INVInvestigation
Investigations to reduce storm overflow spills at JUNCTION_OF_CRUXWELL_ST_&_ROWBERRY to protect the environment so that they have no local adverse ecological impact.
JUNCTION_OF_CRUXWELL_ST_&_ROWBERRY
Due 2027-28Frome - source to conf Tedstone Bk
08DC100239 · d25YEP_INVInvestigation
Investigations to reduce storm overflow spills at KINGTON_-_MANHOLE_29 to protect the environment so that they have no local adverse ecological impact.
KINGTON_-_MANHOLE_29
Due 2027-28Arrow - conf Gladestry Bk to conf Gilwern Bk
08DC100239 · e25YEP_INVInvestigation
Investigations to reduce storm overflow spills at KINGTON_WASTEWATER_TREATMENT_WORKS to protect the environment so that they have no local adverse ecological impact.
KINGTON_WASTEWATER_TREATMENT_WORKS
Due 2027-28Arrow - conf Gilwern Bk to conf R Lugg
08DC100239 · f25YEP_INVInvestigation
Investigations to reduce storm overflow spills at LEOMINSTER_WASTEWATER_TREATMENT_WKS to protect the environment so that they have no local adverse ecological impact.
LEOMINSTER_WASTEWATER_TREATMENT_WKS
Due 2027-28Lugg - conf Norton Bk to conf R Arrow
08DC100239 · g25YEP_INVInvestigation
Investigations to reduce storm overflow spills at MANHOLE_27_COMBINED_SEWER_OVERFLOW to protect the environment so that they have no local adverse ecological impact.
MANHOLE_27_COMBINED_SEWER_OVERFLOW
Due 2027-28Arrow - conf Gladestry Bk to conf Gilwern Bk
08DC100239 · h25YEP_INVInvestigation
Investigations to reduce storm overflow spills at MANHOLE_50_COMBINED_SEWER_OVERFLOW to protect the environment so that they have no local adverse ecological impact.
MANHOLE_50_COMBINED_SEWER_OVERFLOW
Due 2027-28Arrow - conf Gladestry Bk to conf Gilwern Bk
08DC100239 · i25YEP_INVInvestigation
Investigations to reduce storm overflow spills at MORETON_ON_LUGG_WWTW to protect the environment so that they have no local adverse ecological impact.
MORETON_ON_LUGG_WWTW
Due 2027-28Lugg - conf R Arrow to conf R Wye
08DC100239 · j25YEP_INVInvestigation
Investigations to reduce storm overflow spills at NEW_COURT_SEWAGE_PUMPING_STATION to protect the environment so that they have no local adverse ecological impact.
NEW_COURT_SEWAGE_PUMPING_STATION
Due 2027-28Lugg - conf R Arrow to conf R Wye
08DC100239 · l25YEP_INVInvestigation
Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact.
P_INDUSTRIAL_SITE_PS
Due 2027-28Frome - source to conf Tedstone Bk
08DC100239 · k25YEP_INVInvestigation
Investigations to reduce storm overflow spills at PEMBRIDGE_CSO to protect the environment so that they have no local adverse ecological impact.
PEMBRIDGE_CSO
Due 2027-28PEMBRIDGE
08DC100239 · m25YEP_INVInvestigation
Investigations to reduce storm overflow spills at SEATON_AVENUE_CSO to protect the environment so that they have no local adverse ecological impact.
SEATON_AVENUE_CSO
Due 2027-28Lugg - conf R Arrow to conf R Wye
08DC100239 · n25YEP_INVInvestigation
Investigations to reduce storm overflow spills at SHOBDON_STW to protect the environment so that they have no local adverse ecological impact.
SHOBDON_STW
Due 2027-28SHOBDON
08DC100236 · aU_IMP4Improvement
Improvement to storm overflow shown through investigation to be causing local adverse environmental impact and prioritised as High / Very High. To be expanded upon further following PR24 discussions and further direction from Welsh Government
Bromyard New Road SPS (Permit name Petty Bridge SPS) Improvements to prioritised storm overflow causing local adverse environmental impact
Due 2027-28Frome - conf Tedstone Bk to conf R Lugg
08DC100237 · aU_IMP4Improvement
Improvement to storm overflow shown through investigation to be causing local adverse environmental impact and prioritised as High / Very High. To be expanded upon further following PR24 discussions and further direction from Welsh Government
Manhole No.9 CSO (Weobley) - Improvements to prioritised storm overflow causing local adverse environmental impact
Due 2027-28Stretford Bk - source to conf R Arrow
08DC100003 · aU_IMP7Improvement
Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS
MUCH COWARNE MILL CROFT Septic Tank
Due 2027-28Lodon - source to conf R Frome
08DC100001 · aU_IMP7Improvement
Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS
WOLFERLOW Septic Tank
Due 2027-28Tedstone Bk - source to conf R Frome
08DC100235 · a25YEP_IMPImprovement
Improvement to storm overflow shown through investigation to be causing local adverse environmental impact and prioritised as Severe. To be expanded upon further following PR24 discussions and further direction from Welsh Government
Bromyard Sherford Street SO (Permit name Congregational Chapel CSO) Improvements to prioritised storm overflow causing local adverse environmental impact
Due 2029-30Frome - conf Tedstone Bk to conf R Lugg
08DC100142 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Bromyard STW
Due 2029-30Frome - conf Tedstone Bk to conf R Lugg
08DC100151 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Canon Pyon STW
Due 2029-30Wellington Bk - source to conf R Lugg
DCWW101144a · bf7461f3W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Emergency Overflow serving Norton SPS
Due 2029-30Water body only
08DC100005 · aWFD_IMP_PHYSHABImprovement
Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish
Fish Barrier Mitigation at Asset no.
Due 2029-30Frome - conf Tedstone Bk to conf R Lugg
08DC100010 · aWFD_IMP_PHYSHABImprovement
Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish
Fish Barrier Mitigation at Asset no.
Due 2029-30Arrow - conf Gilwern Bk to conf R Lugg
08DC100006 · aWFD_IMP_PHYSHABImprovement
Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish
Fish Barrier Mitigation at Asset no.
Due 2029-30Frome - conf Tedstone Bk to conf R Lugg
08DC100008 · aWFD_IMP_PHYSHABImprovement
Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish
Fish Barrier Mitigation at Asset no.
Due 2029-30Arrow - conf Gilwern Bk to conf R Lugg
08DC100009 · aWFD_IMP_PHYSHABImprovement
Address impacts from water company owned / utilised structures that are creating a physical obstruction to migratory fish
Fish Barrier Mitigation at Asset no.
Due 2029-30Arrow - conf Gilwern Bk to conf R Lugg
08DC100152 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Kingsland STW
Due 2029-30KINGSLAND
DCWW101582a · 18d2662dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANGUNLLO STW PS
Due 2029-30Llangunllo Storm Overflow
DCWW101444a · 9dd9e47eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Lugg Bridge CSO (acts as EO for Tanyard SPS), Broad Street, Presteigne, Powys
Due 2029-30Ford Street Storm Overflow
08DC100143 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Lyonshall STW
Due 2029-30LYONSHALL
DCWW101887b · f241ad68W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
New Radnor
Due 2029-30Water body only
DCWW101887a · dfacfd0aW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
New Radnor STW
Due 2029-30Water body only
08DC100150 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Pencombe STW
Due 2029-30Lodon - source to conf R Frome
DCWW100806a · ba5f38f6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PETTY BRIDGE PUMPING STATION NGR in England
Due 2029-30Bromyard New Road Storm Overflow
08DC100144 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Shobdon STW
Due 2029-30SHOBDON
DCWW101582a · e08cb307W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Tanyard Pumping Station CSO/EO Ford Street, Presteigne, Stapleton, Powys
Due 2029-30Ford Street Storm Overflow
08DC100145 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Tarrington
Due 2029-30TARRINGTON
08DC100146 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Weobley STW
Due 2029-30WEOBLEY

56 of 56 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.