Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The Lugg and Arrow crosses the border: its English overflows come under the plan, and its Welsh ones under Wales’s own targets. Every overflow here is Dŵr Cymru’s, whose annual returns start in 2022, so the baseline is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

11
Above the 2050 cap
of 19 tracked
9
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
8
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Kingsland Wwtw Overflow
DCWW1676
205031 ·22
91
0 events
+194%9.1×Rising
Weobley Wwtw Storm Overflow
DCWW2157
205012 ·22
62
0 events
+417%6.2×Rising
Bromyard New Road Storm Overflow
DCWW688
205053 ·22
60
0 events
+13%6×Rising
Leominster Wwtw Storm Overflow
DCWW918
205043 ·22
58
0 events
+35%5.8×Rising
Tanyard Storm Overflow
DCWW1801
205031 ·22
35
0 events
+13%3.5×Rising
New Court Storm Overflow
DCWW839
205021 ·22
32
0 events
+52%3.2×Rising
Tarrington Wwtw Storm Overflow
DCWW1079
205040 ·22
23
0 events
-43%2.3×Falling — behind
Love Lane Storm Overflow
DCWW555
205021 ·22
22
0 events
+5%2.2×Rising
Waterloo Road Kington Overflow
DCWW1638
205025 ·22
17
0 events
-32%1.7×Falling — behind
Bodenham Moor Overflow
DCWW1893
205013 ·22
15
0 events
+15%1.5×Rising
Lyonshall Wwtw Overflow
DCWW1839
20508 ·22
14
0 events
+75%1.4×Rising
Luston Storm Overflow
DCWW1872
20501 ·22
7
0 events
+600%0.7×Within the cap
Castlefields Leominster Overflow
DCWW1814
20507 ·22
5
0 events
-29%0.5×Within the cap
Bromyard Wwtw Storm Overflow
DCWW2148
20507 ·22
4
0 events
-43%0.4×Within the cap
Bridge Street Kington Storm Overflow
DCWW448
20506 ·22
4
0 events
-33%0.4×Within the cap
Ford Street Storm Overflow
DCWW2258
20500 ·22
1
0 events
—0.1×Within the cap
Off Millcroft Road Bodenham Overflow
DCWW1894
20500 ·22
1
0 events
—0.1×Within the cap
Porthouse Farm Industrial Estate Overflow
DCWW795
20500 ·22
0
0 events
—0×Within the cap
Yarpole Overflow
DCWW1369
205012 ·22
0
0 events
-100%0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →