Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The Lower Wye and Monnow crosses the border: its English overflows come under the plan, and its Welsh ones under Wales’s own targets. Every overflow here is Dŵr Cymru’s, whose annual returns start in 2022, so the baseline is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

20
Above the 2050 cap
of 28 tracked
10
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
8
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Chepstow North Storm Overflow
DCWW431
205067 ·22
59
0 events
-12%5.9×Falling — behind
Sedbury Storm Overflow
DCWW773
205056 ·22
59
0 events
+5%5.9×Rising
Wye Street Storm Overflow
DCWW472
205042 ·22
56
0 events
+33%5.6×Rising
Eign Wwtw Inlet Storm Overflow
DCWW1895
205036 ·22
47
0 events
+31%4.7×Rising
Broad Street Storm Overflow
DCWW106
2050168 ·22
40
0 events
-76%4×Falling — behind
Plough Lane Storm Overflow
DCWW2323
205012 ·24
40
0 events
+233%4×Rising
Pontrilas Wwtw Storm Overflow
DCWW2276
205065 ·22
37
0 events
-43%3.7×Falling — behind
Bryngwenin Overflow
DCWW682
2050123 ·22
35
0 events
-72%3.5×Falling — behind
St. Martins Allotments Storm Overflow
DCWW754
205029 ·22
31
0 events
+7%3.1×Rising
Newland Wwtw No1 Storm Overflow
DCWW2155
205035 ·22
29
0 events
-17%2.9×Falling — behind
Wyebank Road Storm Overflow
DCWW468
205017 ·22
28
0 events
+65%2.8×Rising
Moccas Wwtw Storm Overflow
DCWW850
205030 ·22
21
0 events
-30%2.1×Falling — behind
Ross Lower Cleeve Storm Overflow
DCWW1782
20507 ·22
21
0 events
+200%2.1×Rising
Tintern Main Road Storm Overflow
DCWW710
2050210 ·22
20
0 events
-90%2×Falling — behind
Glasbury Wwtw Storm Overflow
DCWW2332
20503 ·22
20
0 events
+567%2×Rising
Church Lane Storm Overflow
DCWW654
205067 ·22
18
0 events
-73%1.8×Falling — behind
Mathern Storm Overflow
DCWW1865
20502 ·22
17
0 events
+750%1.7×Rising
Greyfriars Bridge Storm Overflow
DCWW2007
2050122 ·22
15
0 events
-88%1.5×Nearly there
Longtown Storm Overflow
DCWW879
205010 ·22
12
0 events
+20%1.2×Rising
Peterchurch Wwtw Storm Overflow
DCWW2156
205012 ·22
12
0 events
0%1.2×Nearly there
Barton Road Storm Overflow
DCWW706
20509 ·22
6
0 events
-33%0.6×Within the cap
Smallbrook Road Storm Overflow
DCWW1405
20500 ·22
3
0 events
—0.3×Within the cap
Lydbrook Storm Overflow
DCWW246
20502 ·22
3
0 events
+50%0.3×Within the cap
Raglan Way Storm Overflow
DCWW1421
20503 ·22
1
0 events
-67%0.1×Within the cap
Lower Lydbrook Storm Overflow
DCWW249
20500 ·22
1
0 events
—0.1×Within the cap
Ashburton Road Ross-on-wye Overflow
DCWW1383
20501 ·22
0
0 events
-100%0×Within the cap
Leymans Field Overflow
DCWW916
20500 ·22
0
0 events
—0×Within the cap
Pandy Wwtw Inlet Overflow.
DCWW1450
205052 ·22
0
0 events
-100%0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →