Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Wotton-under-edge Hack Mill252Wotton Under Edge STWNo measure
Olveston the Common203Tockington STWNo measure
Cromhall Jubilee Lane124Cromhall STWNo measure
Tockington Mill Lodge90Tockington STWNo measure
Tockington Lower Tockington Road Adj to Ivywell82Tockington STWNo measure
Wotton-under-edge Water Lane79Wotton Under Edge STWNo measure
Wotton-under-edge Old Coach Yard20Wotton Under Edge STWNo measure
Bristol Third Way14Bristol STWNo measure
Bristol Queen Street / Meadow Street10Bristol STWNo measure
Olveston Green Farm Opp Lower Leaze4Tockington STWNo measure
Berkeley Park View Road1Sharpness STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.