Why it keeps happening

Why it keeps happening

Three things we can measure in the data. None of them proves a cause on its own, but each points at a different kind of infrastructure problem.

Indicator 1
4Dry
overflows spilling with no rain to excuse it

A discharge in dry weather is not an exceptional circumstance, so it is not permitted on any reading of regulation 4.

See the 4 →
Indicator 2
0Overloaded
works whose estimated load sits above their permitted flow

A strong signal, not a finding. We cannot see whether flow is transferred to another works for treatment, and the permitted figure is not always published.

See the 0 →
Indicator 3
9Early
overflows that spilled while their works stayed shut

Rainfall across the catchment does not explain a discharge that an overflow's own treatment works did not share.

See the 9 →

Where the indicators concentrate

OverflowHoursDryWhat it points toVerdict
Menheniot STWSSO1,53123High spill frequencyNo action
Lodgehill STW, LiskeardSSO7685High spill frequencyNo action
Pelynt STWSSO1,36970Very long spillsNo action
Minions STWSO34519Dry spillingNo action
Bone Mill pumping station, LooePS-CSO/EO2780Spills before its worksOn record
St Cleer STW, LiskeardSSO1,0956Very long spillsNo action
Dobwalls pumping stationPS-CSO/EO2668Spills before its worksNo action
Scawns Hill, MenheniotCSO2513Spills before its worksNo action
Sungirt Lane, LiskeardCSO700Spills before its worksNo action
Buller Quay, LooeCSO210Spills before its worksOn record

Hours are the last full year; dry spills are since 2020. Verdict is whether a measure is linked to the overflow — see the gaps.

What this analysis cannot see

These indicators are measured from spill timing and rainfall alone. They cannot see misconnections, the quality of effluent from a works that is running normally, flow transferred between works for treatment, a company's maintenance history, or the periods when a monitor was offline. Because a quiet monitor records nothing, every count here is a floor, not a total.