Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Winterbourne STW TWL00454 | 2050 | 219 ·24 | 116 15 events | -47% | 11.6× | Falling — behind | |
| East Shefford STW TWL00167 | 2050 | 35 ·24 | 102 68 events | +191% | 10.2× | Rising | |
| Marlborough STW TWL00293 | 2050 | 172 ·24 | 96 361 events | -44% | 9.6× | Falling — behind | |
| Wash Water STW TWL00430 | 2050 | 67 ·24 | 53 44 events | -21% | 5.3× | Falling — behind | |
| Kingsclere STW TWL00256 | 2050 | 119 ·24 | 49 35 events | -59% | 4.9× | Falling — behind | |
| Silchester STW TWL00370 | 2050 | 97 ·24 | 42 22 events | -57% | 4.2× | Falling — behind | |
| Hamstead Marshall STW TWL00212 | 2050 | 86 ·24 | 42 34 events | -51% | 4.2× | Falling — behind | |
| Mortimer STW TWL00306 | 2050 | 63 ·24 | 40 46 events | -37% | 4× | Falling — behind | |
| Burghfield STW TWL00064 | 2050 | 96 ·24 | 34 11 events | -65% | 3.4× | Falling — behind | |
| Aldermaston STW TWL00006 | 2050 | 48 ·24 | 31 65 events | -35% | 3.1× | Falling — behind | |
| Knights Lane (ball Hill) pumping station TWL00260 | 2050 | 59 ·24 | 30 19 events | -49% | 3× | Falling — behind | |
| Newbury STW TWL00309 | 2050 | 94 ·24 | 28 71 events | -70% | 2.8× | Falling — behind | |
| Blind Mans Gate (highclere) pumping station TWL00044 | 2050 | 45 ·24 | 21 16 events | -53% | 2.1× | Falling — behind | |
| Great Bedwyn STW TWL00201 | 2050 | 67 ·24 | 18 13 events | -73% | 1.8× | Falling — behind | |
| Reading STW TWL00343 | 2050 | 47 ·24 | 14 9 events | -70% | 1.4× | Nearly there | |
| Kintbury STW TWL00259 | 2050 | 56 ·24 | 11 4 events | -80% | 1.1× | Nearly there | |
| East Grafton STW TWL00166 | 2050 | 28 ·24 | 7 4 events | -75% | 0.7× | Within the cap | |
| London Road (marlborough) pumping station TWL00275 | 2050 | 11 ·24 | 1 1 events | -91% | 0.1× | Within the cap | |
| Midgham STW TWL00301 | 2050 | 3 ·24 | 1 1 events | -67% | 0.1× | Within the cap | |
| Swains Road (tadley) pumping station TWL00401 | 2050 | 2 ·24 | 1 1 events | -50% | 0.1× | Within the cap | |
| Ramsbury STW TWL00340 | 2050 | 23 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Draycot Foliat pumping station TWL00161 | 2050 | 1 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Blakes Lock (reading) pumping station TWL00344 | 2050 | 3 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Hungerford STW TWL00240 | 2050 | 15 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Chieveley STW TWL00090 | 2050 | 7 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Fyfield STW TWL00193 | 2050 | 44 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →