What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08TW100691 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) ALDERMASTON STW | Complete 2025-26 | Aldermaston STW |
| 08TW100698 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BURGHFIELD STW | Complete 2025-26 | Burghfield STW |
| 08TW100701 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CHIEVELEY STW | Complete 2025-26 | Chieveley STW |
| 08TW100596 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) EAST GRAFTON STW | Complete 2025-26 | East Grafton STW |
| 08TW100597 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) EAST SHEFFORD STW | Complete 2025-26 | East Shefford STW |
| 08TW100608 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) FYFIELD STW | Complete 2025-26 | Fyfield STW |
| 08TW100611 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) GREAT BEDWYN SEWAGE TREATMENT WORKS | Complete 2025-26 | Upper Dun |
| 08TW100618 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HAMSTEAD MARSHALL STW | Complete 2025-26 | Hamstead Marshall STW |
| 08TW100628 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HUNGERFORD STW | Complete 2025-26 | Hungerford STW |
| 08TW100632 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) KINGSCLERE STW | Complete 2025-26 | Kingsclere STW |
| 08TW100634 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) KINTBURY STW | Complete 2025-26 | Kintbury STW |
| 08TW100713 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MARLBOROUGH STW | Complete 2025-26 | Marlborough STW |
| 08TW100724 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MIDGHAM STW | Complete 2025-26 | Midgham STW |
| 08TW100647 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MORTIMER (STRATFIELD MORTIMER) STW | Complete 2025-26 | Foudry Brook (West End Brook to M4) |
| 08TW100648 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) NEWBURY STW | Complete 2025-26 | Newbury STW |
| 08TW100653 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) RAMSBURY STW | Complete 2025-26 | Ramsbury STW |
| 08TW100654 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) READING SEWAGE TREATMENT WORKS | Complete 2025-26 | Foudry Brook (West End Brook to M4) |
| 08TW100661 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) SILCHESTER STW | Complete 2025-26 | Silchester STW |
| 08TW100680 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WASHWATER SEWAGE TREATMENT WORKS | Complete 2025-26 | Enborne (Source to downstream A34) |
| 08TW100729 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WINTERBOURNE STW | Complete 2025-26 | Winterbourne STW |
| 08TW101402 · b | WFDGW_ND | No deterioration | Necessary scope to move from groundwater authorisation to EPR GW authorisation to EPR: Hannington (Hants) STW | Complete 2025-26 | Baughurst Brook |
| 08TW101402 · e | WFDGW_ND | No deterioration | Necessary scope to move from groundwater authorisation to EPR GW authorisation to EPR: Leckhampstead STW | Complete 2025-26 | Winterbourne |
| 08TW101402 · h | WFDGW_ND | No deterioration | Necessary scope to move from groundwater authorisation to EPR GW authorisation to EPR: Welford STW | Complete 2025-26 | Lambourn (Source to Newbury) |
| 08TW101402 · i | WFDGW_ND | No deterioration | Necessary scope to move from groundwater authorisation to EPR GW authorisation to EPR: Wolverton Common STW | Complete 2025-26 | Baughurst Brook |
| 08TW101568 · a | U_MON4 | Monitoring | Install and run event-duration monitoring ALDERMASTON STW | Due 2026-27 | Aldermaston STW |
| 08TW100303 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) BURGHFIELD STW | Due 2026-27 | Burghfield STW |
| 08TW100425 · a | U_MON4 | Monitoring | Install and run event-duration monitoring CHIEVELEY STW | Due 2026-27 | Chieveley STW |
| 08TW100328 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) EAST GRAFTON STW | Due 2026-27 | East Grafton STW |
| 08TW100329 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) EAST SHEFFORD STW | Due 2026-27 | East Shefford STW |
| 08TW101405 · b | EDWRMP_INV | Investigation | Large catchment investigation Fognham Down and Ashdown Park - Environmental Destination | Due 2026-27 | Lambourn (Source to Newbury) |
| 08TW100335 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) FYFIELD STW | Due 2026-27 | Fyfield STW |
| 08TW100337 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) GREAT BEDWYN SEWAGE TREATMENT WORKS | Due 2026-27 | Upper Dun |
| 08TW100340 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) HAMSTEAD MARSHALL STW | Due 2026-27 | Hamstead Marshall STW |
| 08TW101594 · a | U_MON4 | Monitoring | Install and run event-duration monitoring HUNGERFORD STW | Due 2026-27 | Hungerford STW |
| 08TW101595 · a | U_MON4 | Monitoring | Install and run event-duration monitoring KINGSCLERE STW | Due 2026-27 | Kingsclere STW |
| 08TW101596 · a | U_MON4 | Monitoring | Install and run event-duration monitoring KINTBURY STW | Due 2026-27 | Kintbury STW |
| 08TW100366 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) MARLBOROUGH STW | Due 2026-27 | Marlborough STW |
| 08TW100368 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) MIDGHAM STW | Due 2026-27 | Midgham STW |
| 08TW101602 · a | U_MON4 | Monitoring | Install and run event-duration monitoring MORTIMER (STRATFIELD MORTIMER) STW | Due 2026-27 | Foudry Brook (West End Brook to M4) |
| 08TW100369 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) NEWBURY STW | Due 2026-27 | Newbury STW |
| 08TW100447 · a | U_MON4 | Monitoring | Install and run event-duration monitoring RAMSBURY STW | Due 2026-27 | Ramsbury STW |
| 08TW101604 · a | U_MON4 | Monitoring | Install and run event-duration monitoring READING SEWAGE TREATMENT WORKS | Due 2026-27 | Foudry Brook (West End Brook to M4) |
| 08TW101609 · a | U_MON4 | Monitoring | Install and run event-duration monitoring SILCHESTER STW | Due 2026-27 | Silchester STW |
| 08TW104005 · a | WFD_INV_WRFlow | Investigation | Investigation and options appraisal Upper Kennet investigation with Wessex Water | Due 2026-27 | Upper Kennet to Marlborough |
| 08TW100399 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) WASHWATER SEWAGE TREATMENT WORKS | Due 2026-27 | Enborne (Source to downstream A34) |
| 08TW100406 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) WINTERBOURNE STW | Due 2026-27 | Winterbourne STW |
| 08TW100141 · a | WFD_NDLS_Chem2 | No deterioration | new PFOS limit PFOS Aldermaston STW | Due 2026-27 | Lower Kennet (Sheffield Bottom to Reading) |
| 08TW100071 · a | WFD_NDLS_Chem2 | No deterioration | Chieveley STW, cypermethrin, 0.000402ug Reduce cypermethrin loading | Due 2026-27 | Winterbourne |
| 08TW100486 · a | WFD_NDLS_Chem1 | No deterioration | Kingsclere STW cypermethrin load standstill limit Reduce cypermethrin loading | Due 2026-27 | Kingsclere Brook (Source to Enborne) |
| 08TW100152 · a | SSSI_INV | Investigation | Endocrine distruptor investigation Evidence whether TWUL assets are linked to in river DO failures. | Due 2027-28 | Kennet (Lambourn confluence to Enborne confluence) |
| 08TW101108 · ua | EnvAct_INV4 | Investigation | Storm Overflows investigation Knights Lane- Storm Overflows investigation | Due 2027-28 | Enborne (Source to downstream A34) |
| 08TW101108 · al | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at BURGHFIELD STW | Due 2027-28 | Clayhill Brook |
| 08TW101108 · ap | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at CHIEVELEY STW | Due 2027-28 | Winterbourne |
| 08TW101108 · gf | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at EAST GARSTON SPS | Due 2027-28 | Lambourn (Source to Newbury) |
| 08TW101108 · ba | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at EAST GRAFTON STW | Due 2027-28 | Upper Dun |
| 08TW101108 · bd | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at EAST SHEFFORD STW | Due 2027-28 | Lambourn (Source to Newbury) |
| 08TW101108 · bg | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at FYFIELD (WILTS) STW | Due 2027-28 | Upper Kennet to Marlborough |
| 08TW101108 · bl | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at HAMSTEAD MARSHALL STW | Due 2027-28 | Middle Kennet (Hungerford to Newbury) |
| 08TW101108 · br | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at HUNGERFORD STW | Due 2027-28 | Middle Kennet (Hungerford to Newbury) |
| 08TW101108 · ca | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at LONDON ROAD, MARLBOROUGH SPS | Due 2027-28 | Upper Kennet to Marlborough |
| 08TW101108 · bz | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at MARLBOROUGH STW | Due 2027-28 | Middle Kennet (Marlborough to Hungerford) |
| 08TW101108 · gp | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at NEWBURY STW | Due 2027-28 | Kennet (Lambourn confluence to Enborne confluence) |
| 08TW101108 · ce | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at RAMSBURY STW | Due 2027-28 | Aldbourne |
| 08TW101108 · gy | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at WINTERBOURNE STW | Due 2027-28 | Winterbourne |
| 08TW101108 · tn | EnvAct_INV4 | Investigation | Storm Overflows investigation WASHWATER WWTW- Storm Overflows investigation | Due 2027-28 | Enborne (downstream A34 to Burghclere Brook) |
| 08TW100184 · a | WFD_INV | Investigation | Investigate the cause of the spills WFD Investigation of in river Dissolved Oxygen to inform future action | Due 2027-28 | Enborne (downstream A34 to Burghclere Brook) |
| 08TW100052 · b | WFD_INV_CHEM | Investigation | Reading STW 4e Emerging substances investigation – impact to the environment | Due 2029-30 | Foudry Brook (West End Brook to M4) |
| 08TW101887 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Purton STW Reduce Phosphorus Loadings at Purton STW | Due 2029-30 | Foudry Brook (West End Brook to M4) |
| 08TW100933 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Shrivenham STW Reduce Phosphorus Loadings at Shrivenham STW | Due 2029-30 | Silchester Brook |
| 09TW100180 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Stratfield Mortimer STW Reduce Phosphorus Loadings at Stratfield Mortimer STW | Due 2029-30 | Foudry Brook (West End Brook to M4) |
| 08TW100004 · a | NERC_IMP | Improvement | Implement a river restorations schmeme to promote natural morphological processes River Kennet River Restoration Scheme | Due 2029-30 | Upper Kennet to Marlborough |
| 08TW100988 · a | ENVAct_IMP2 | Improvement | Option C2: 7,854m2 wetland equivalent treatment, 1.43 Ha SUDS IA Removal. - No screen required Storm Overflows action at BURGHFIELD STW | Due 2029-30 | Clayhill Brook |
| 08TW101081 · a | ENVAct_IMP2 | Improvement | Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen Storm Overflows action at EAST GARSTON SPS | Due 2029-30 | Lambourn (Source to Newbury) |
| 08TW101005 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 181m of sewer relining, 22m3 storage, 0.07Ha SUDS IA Removal, No screen required Storm Overflows action at EAST GRAFTON STW | Due 2029-30 | Upper Dun |
| 08TW101006 · a | ENVAct_IMP2 | Improvement | Option C2: 5,663m2 wetland equivalent treatment, 1.16 Ha SUDS IA Removal. - No screen required Storm Overflows action at EAST SHEFFORD STW | Due 2029-30 | Lambourn (Source to Newbury) |
| 08TW101008 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 146m3 storage, 4.73Ha SUDS IA Removal, No screen required Storm Overflows action at Fyfield (Wilts) STW | Due 2029-30 | Upper Kennet to Marlborough |
| 08TW101013 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 140m of sewer relining, 24m3 storage, 0.06Ha SUDS IA Removal, No screen required Storm Overflows action at HAMSTEAD MARSHALL STW | Due 2029-30 | Middle Kennet (Hungerford to Newbury) |
| 08TW101020 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 244m3 storage, 20m3 screen Storm Overflows action at HUNGERFORD STW | Due 2029-30 | Middle Kennet (Hungerford to Newbury) |
| 08TW101085 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: FFT Equivalent, No screen required Storm Overflows action at NEWBURY STW | Due 2029-30 | Kennet (Lambourn confluence to Enborne confluence) |
| 08TW101092 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 304m of sewer relining, 0.12Ha SUDS IA Removal, No screen required Storm Overflows action at WINTERBOURNE STW | Due 2029-30 | Winterbourne |
80 of 80 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.