EA sampling point

Kennet at Inlet to Padworth Trout Farm L

Sampled by the Environment Agency on 10 visits in 2026. Ammonia and dissolved oxygen are high. Averages are over 2023–2025.

Ammonia

2026: avg 0.019 · max 0.053 mg/l

Band, 2023–2025 average: 0.023 · High

00.20.40.62026-01-08: 0.053 mg/l2026-02-12: below 0.03 mg/l2026-03-17: below 0.03 mg/l2026-04-09: below 0.03 mg/l2026-05-12: below 0.03 mg/l2026-06-08: below 0.03 mg/l2026-07-09: below 0.03 mg/l2026-08-17: below 0.03 mg/l2026-10-27: below 0.03 mg/l2026-11-13: below 0.03 mg/l
High ≤ 0.2Good ≤ 0.3Moderate ≤ 0.75Poor ≤ 1.1Bad > 1.1

Dissolved oxygen

2026: avg 98 · min 93 % saturation

Band, 2023–2025 average: 94 · High

60801001202026-01-08: 99.3 % saturation2026-02-12: 93 % saturation2026-03-17: 99 % saturation2026-04-09: 102.5 % saturation2026-05-12: 103.4 % saturation2026-06-08: 96.8 % saturation2026-07-09: 102 % saturation2026-08-17: 93.9 % saturation2026-10-27: 95.3 % saturation2026-11-13: 96.3 % saturation
High ≥ 80Good ≥ 75Moderate ≥ 64Poor ≥ 50Bad < 50

Water temperature

5.2–21.5 °C

Warm water holds less oxygen. There is no river standard for temperature here.

01020302026-01-08: 5.2 °C2026-02-12: 9.6 °C2026-03-17: 10.2 °C2026-04-09: 13.1 °C2026-05-12: 11.8 °C2026-06-08: 14.5 °C2026-07-09: 21.5 °C2026-08-17: 20.2 °C2026-10-27: 12 °C2026-11-13: 7 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative:the Environment Agency’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Oxygen, Dissolved, % Saturation (PERCENTAGE)

EA sampling point TH-PKER0047 · Lower Kennet (Sheffield Bottom to Reading) · 307 readings of 5 tests since 2021.

DateResultUnitSample
2026-11-13 11:2496.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-10-27 12:2295.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-08-17 11:3993.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-07-09 11:59102PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-06-08 11:0996.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-05-12 11:56103.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-04-09 12:04102.5PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-03-17 11:5399PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-02-12 13:1493PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2026-01-08 12:3699.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-12-04 13:4575.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-11-17 10:2292.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-10-17 10:2796.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-09-12 12:3399.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-08-07 10:1594.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-07-09 10:2996.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-06-17 11:0996.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-05-12 09:5789.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-04-03 12:07106.5PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-03-07 11:52100.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-02-10 10:2195.5PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2025-01-14 12:0597.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-12-04 12:1696.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-11-14 10:4097.2PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-10-10 09:5689.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-09-03 11:0396.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-08-09 09:3938.5PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-07-03 11:2296.7PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-06-17 11:1198.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-05-02 09:4692.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-04-03 10:0997PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-03-20 12:0398.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-02-16 11:4393.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-01-12 10:2296PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-12-13 12:4791.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-11-06 10:0191.6PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-10-12 10:4894PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-09-25 10:1895.2PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-07-19 11:4799.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-06-27 11:2897.5PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-03-08 10:26102.5PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-02-14 10:2889.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-01-17 16:0192.6PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-12-14 11:0198.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-11-17 12:0588.1PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-10-20 12:0490.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-09-23 09:2795PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-08-17 14:0693.1PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-07-07 12:0597.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-06-14 13:29103.2PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-05-03 12:55100.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-04-04 12:2599.6PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-03-03 14:0798.7PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-02-03 12:06100.7PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2022-01-20 14:38100.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-12-14 12:1697.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-11-30 11:3898.5PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-10-07 15:1496.4PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-09-02 08:5690.7PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-08-17 13:1797.9PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-07-08 12:2399.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-06-08 11:4297.3PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-05-19 11:3290.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2021-04-08 15:38110.8PERCENTAGERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)

Source: Environment Agency Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the River Kennet.

Kennet at Inlet to Padworth Trout Farm L: EA water tests — River Kennet Data